References
- BrankeJMattfeldDCAnticipation and flexibility in dynamic schedulingInternational Journal of Production Research200543153103312910.1080/00207540500077140
- FisherHThompsonGLProbabilistic learning combinations of local job-shop scheduling rulesIndustrial Scheduling1963225251
- Gnoni MG, Iavagnilio R, Mossa G, Mummolo G and Di Leva A (2003). Production planning of a multi-site manufacturing system by hybrid modelling: A case study from the automotive industry. International Journal of Production Economics, 85(2): 251–262.
- Holthaus O and Rajendran C (1997). Efficient dispatching rules for scheduling in a job shop. International Journal of Production Economics, 48(1):87–105.
- IBM ILOG CPLEX Optimization Studio Information Center (2014). IBM ILOG CPLEX Optimization Studio V12.5.1 documentation, http://pic.dhe.ibm.com/infocenter/cosinfoc/v12r5/index.jsp, accessed 31 October 2014.
- JeongSJLimSJKimKSHybrid approach to production scheduling using genetic algorithm and simulationInternational Journal of Advanced Manufacturing Technology2006281–212913610.1007/s00170-004-2345-7
- KlemmtAHornSWeigertGWolterKJSimulation based optimization vs. mathematical programming: A hybrid approach for optimizing scheduling problemsRobotics and Computer-Integrated Manufacturing200925691792510.1016/j.rcim.2009.04.012
- LawrenceSResource constrained project scheduling: An experimental investigation of heuristic scheduling techniques (supplement)Graduate School of Industrial Administration1984
- Lawrence SR and Sewell EC (1997). Heuristic, optimal, static, and dynamic schedules when processing times are uncertain. Journal of Operations Management, 15(1):71–82.
- MahdaviIShiraziBSolimanpurMDevelopment of a simulation based decision support system for controlling stochastic flexible job shop manufacturing systemsSimulation Modelling Practice and Theory201018676878610.1016/j.simpat.2010.01.015
- Manne AS (1959). On the job shop scheduling problem. Cowles Foundation Discussion Papers 73, Cowles Foundation for Research in Economics, Yale University: New Haven, CT.
- OR library (2014). Job shop benchmark instances, http://people.brunel.ac.uk/~mastjjb/jeb/orlib/files/jobshop1.txt, accessed 31 January 2013.
- Pan JC-H and Chen J-S (2003). Minimizing makespan in re-entrant permutation flow-shops. Journal of the Operational Research Society, 54(6): 642–653. cited By (since 1996)37.
- Sargent RG (1994). A historical view of hybrid simulation/analytic models. In: Proceedings of the 26th Conference on Winter Simulation, WSC ’94, pp 383–386, San Diego, CA, Society for Computer Simulation International. ISBN 0-7803-2109-X.
- van Laarhoven PJM, Aarts EHL and Lenstra JK (1992). Job shop scheduling by simulated annealing. Operations Research, 40(1):113–125.
- XiaWWuZAn effective hybrid optimization approach for multiobjective flexible job-shop scheduling problemsComputers and Industrial Engineering200548240942510.1016/j.cie.2005.01.018
- XingL-NChenY-WYangK-WMulti-objective flexible job shop schedule: Design and evaluation by simulation modelingApplied Soft Computing20099136237610.1016/j.asoc.2008.04.013