Solving the Multi-Mode Resource-Constrained Project Scheduling Problem with genetic algorithms

, &
Pages 614-626 | Received 01 May 2002, Accepted 01 Feb 2003, Published online: 21 Dec 2017

References

  • SlowinskiRTwo approaches to problems of resource allocation among project activities: a comparative studyJ Opl Res Soc198031711723
  • KolischRDrexlALocal search for nonpreemptive multi-mode resource-constrained project schedulingIIE Trans199729987999
  • TalbotFBResource-constrained project scheduling with time-resource trade-offs: the nonpreemptive caseMng Sci1982281197121010.1287/mnsc.28.10.1197
  • PattersonJHSlowinskiRTalbotFBWeglarzJAn algorithm for a general class of precedence and resource constrained scheduling problemAdvances in Project Scheduling1989328
  • SprecherAHartmannSDrexlAAn exact algorithm for project scheduling with multiple modesOR Spektrum19971919520310.1007/BF01545587
  • HartmannSDrexlAProject scheduling with multiple modes: a comparison of exact algorithmsNetworks19983228329710.1002/(SICI)1097-0037(199812)32:4<283::AID-NET5>3.0.CO;2-I
  • SprecherADrexlASolving multi-mode resource-constrained project scheduling problems by a simple, general and powerful sequencing algorithmEur J Opl Res199810743145010.1016/S0377-2217(97)00348-2
  • SlowinskiRSoniewickiBWeglarzJDSS for multiobjective project schedulingEur J Opl Res19947922022910.1016/0377-2217(94)90353-0
  • Bouleimen K and Lecocq H (1998). A new efficient simulated annealing algorithm for the resource-constrained project scheduling problem. Presented at the Sixth International Workshop on Project Management and Scheduling, Istanbul, Turkey.
  • BoctorFFResource-constrained project scheduling by simulated annealingInt J Prod Res1996342335235110.1080/00207549608905028
  • JozefowskaJMikaMRozyckiRWaligoraGWeglarzJSimulated annealing for multi-mode resource-constrained project schedulingAnn Opns Res200110213715510.1023/A:1010954031930
  • MoriMTsengCCA genetic algorithm for multi-mode resource constrained project scheduling problemEur J Opl Res199710013414110.1016/S0377-2217(96)00180-4
  • ÖzdamarLA genetic algorithm approach to a general category project scheduling problemIEEE Trans Syst Man Cybern199929445910.1109/5326.740669
  • HartmannSProject scheduling with multiple modes: a genetic algorithmAnn Opns Res200110211113510.1023/A:1010902015091
  • Nonobe K and Ibaraki T (1999). Formulation and tabu search algorithm for the resource constrained project scheduling problem (RCPSP). Unpublished report, University of Kyoto, Japan.
  • DrexlAGrünewaldJNonpreemptive multi-mode resource-constrained project schedulingIIE Trans199325748110.1080/07408179308964317
  • ÖzdamarLUlusoyGA local constraint based analysis approach to project scheduling under general resource constraintsEur J Opl Res19947928729810.1016/0377-2217(94)90359-X
  • AlcarazJMarotoCA robust genetic algorithm for resource allocation in project schedulingAnn Opns Res20011028310910.1023/A:1010949931021
  • HerroelenWDemeulemeesterEDe ReyckBA classification scheme for project schedulingProject Scheduling: Recent Models, Algorithms and Applications1998126
  • BruckerPDrexlAMohringRNeumannKPeschEResource-constrained project scheduling: notation, classification, models, and methodsEur J Opl Res199811234110.1016/S0377-2217(98)00204-5
  • KolischRPadmanRAn integrated survey of deterministic project schedulingOmega-Int J Mngt Sci20012924927210.1016/S0305-0483(00)00046-3
  • NeumannKSchwindtCZimmermannJProject scheduling with time windows and scarce resourcesLect Notes Econ Math2002508133510.1007/978-3-662-22341-3_1
  • KolischRSerial and parallel resource-constrained project scheduling methods revisited: theory and computationEur J Opl Res19969032033310.1016/0377-2217(95)00357-6
  • FalkenauerEGenetic Algorithms and Grouping Problems1998
  • KolischRSprecherAPSPLIB — a project scheduling problem libraryEur J Opl Res19969620521610.1016/S0377-2217(96)00170-1
  • Alcaraz J and Maroto C (1999). Resource allocation in project management by an adaptive genetic algorithm. Presented at the Informs Cincinnati Spring 1999 Meeting, Cincinnati, USA.
  • BoctorFFHeuristics for scheduling projects with resource restrictions and several resource-duration modesInt J Prod Res1993312547255810.1080/00207549308956882

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.