References
- YanoCALeeHLLot sizing with random yields: a reviewOpns Res19954331133410.1287/opre.43.2.311
- SilverEAEstablishing the reorder quantity when the amount received is uncertainINFOR1976143239
- NooriAHKellerGThe lot-size reorder-point model with upstream–downstream uncertaintyDecision Sci19861728529110.1111/j.1540-5915.1986.tb00227.x
- GerchakYOrder point/order quality models with random yieldInt J Prod Econ19922629729810.1016/0925-5273(92)90078-L
- HadleyGWhitinTMAnalysis of Inventory Systems1963
- ShihWOptimal inventory policies when stockouts result from defective productsInt J Prod Res19801867768610.1080/00207548008919699
- KalroAHGohilMMA lot size model with backlogging when the amount received is uncertainInt J Prod Res19822077578610.1080/00207548208947804
- Spence AM (1988). Yield variability in manufacturing: rework and scrap policies. Ph. D. Thesis, Graduate School of Business, Stanford University, Stanford, CA.
- ParlarMWangDDiversification under yield randomness in inventory modelsEur J Opl Res199366526410.1016/0377-2217(93)90205-2
- WangYGerchakYPeriodic review production models with variable capacity, random yield, and uncertain demandMgmt Sci19964213013710.1287/mnsc.42.1.130
- ChengTCEEPQ with process capability and quality assurance considerationsJ Opl Res Soc19914271372010.1057/jors.1991.137
- GerchakYParlarMYield variability, cost tradeoffs and diversification in the EOQ modelNaval Res Logist19903734135410.1002/nav.3800370301
- HongJDHayyaJCDynamic lot sizing with setup reductionComp Ind Eng19932420921810.1016/0360-8352(93)90009-M
- PorteusELInvesting in reduced setups in the EOQ modelMng Sci198531998101010.1287/mnsc.31.8.998
- PorteusELOptimal lot sizing, process quality improvement and setup cost reductionOpns Res19863413714410.1287/opre.34.1.137
- BillingtonPJThe classical economic production quantity model with setup cost as a function of capital expenditureDecision Sci198718254210.1111/j.1540-5915.1987.tb01501.x
- HongJDOptimal production cycle, procurement schedules, and joint investment in an imperfect production systemEur J Opl Res199710041342810.1016/S0377-2217(96)00160-9
- SarkerBRCoatesERManufacturing setup cost reduction under variable lead time and finite opportunities for investmentInt J Prod Econ19974923724710.1016/S0925-5273(97)00010-8
- HofmannCInvestments in modern production technology and the cash flow-oriented EPQ-modelInt J Prod Econ19985419320610.1016/S0925-5273(97)00143-6
- HallRZero Inventories1983
- SilverEAPykeDFPetersonRInventory Management and Production Planning and Scheduling1998
- HarigaHBen-DayaMSome stochastic inventory models with deterministic variable lead timeEur J Opl Res1999113425110.1016/S0377-2217(97)00441-4