References
- De WitJHerroelenWAn evaluation of microcomputer-based software packages for project managementEur J Opl Res19904910213910.1016/0377-2217(90)90124-T
- KolischRResource allocation capabilities of commercial project management software packagesInterfaces199929193110.1287/inte.29.4.19
- MarotoCTormosPLovaAThe evolution of software quality in project schedulingProject Scheduling—Recent Models, Algorithms and Applications1998239259
- BruckerPDrexlAMöhringRNeumannKPeschEResource-constrained project scheduling: notation, classification, models and methodsEur J Opl Res199911234110.1016/S0377-2217(98)00204-5
- DemeulemeesterEHerroelenWProject Scheduling—A Research Handbook.2002
- HerroelenWDe ReyckBDemeulemeesterEResource-constrained project scheduling—a survey of recent developmentsComput Opns Res19982527930210.1016/S0305-0548(97)00055-5
- KolischRPadmanRAn integrated survey of deterministic project schedulingOmega20014924927210.1016/S0305-0483(00)00046-3
- ÖzdamarLUlusoyGA survey on the resource-constrained project scheduling problemIIE Trans19952757458610.1080/07408179508936773
- Standish Group (1994). The Chaos Report. The Standish Group International, Inc. (available at http://www.pm2go.com/sample_research/chaos_1994_1.asp accessed 25 September 2003)
- WiestJDLevyFKA Management Guide to PERT/CPM: with GERT/PDM/CPM and Other Networks1977
- Project Management Institute (2000). A Guide to the Project Management Body of Knowledge (PMBOK® Guide). Project Management Institute: Newton Square.
- WiestJDSome properties of schedules for large projects with limited resourcesOps Res19641239541810.1287/opre.12.3.395
- KlingelARJrBias in PERT project completion time calculations for a real networkMng Sci196613B194B20110.1287/mnsc.13.4.B194
- SchonbergerRWhy projects are always late: a rationale based on manual simulation of a PERT/CPM networkInterfaces198111667010.1287/inte.11.5.66
- BowersJACriticality in resource constrained networksJ Opl Res Soc199546809110.1057/jors.1995.9
- RazTMarshallBEffect of resource constraints on float calculations in project networksInt J Proj Mngt19961424124810.1016/0263-7863(95)00090-9
- TormosPLovaATools for resource-constrained project scheduling and control: forward and backward slack analysisJ Opl Res Soc20015277978810.1057/palgrave.jors.2601145
- WilliamsTMCriticality in stochastic networksJ Opl Res Soc19924335335710.1057/jors.1992.50
- WoodworthBMShanahanSIdentifying the critical sequence in a resource-constrained projectInt J Proj Mngt19886899610.1016/0263-7863(88)90030-0
- GoldrattECritical Chain1997
- KolischRProject Scheduling under Resource Constraints1995
- KolischRResource allocation capabilities of commercial project management software packagesInterfaces199929193110.1287/inte.29.4.19
- NewboldRCProject Management in the Fast Lane—Applying the Theory of Constraints1998
- LeachLPCritical Chain Project Management2000
- UmbleMUmbleEManage your projects for success: An application of the theory of constraintsProd Inv Mngt J2000412732
- YourdonEDeath March2003
- De MeyerALochCHPichMTManaging project uncertainty: from variation to chaosMIT Sloan Mngt Rev2002Winter6067
- CloughRHSearsGAConstruction Project Management1991
- O'BrienJJCPM in Construction Management: Scheduling by the Critical Path Method1965
- CusumanoMASelbyMWMicrosoft Secrets1995
- Herroelen W and Leus R (2004). Project scheduling under uncertainty—survey and research potentials. Eur J Opl Res (in press).
- MehtaSVUzsoyRMPredictable scheduling of a job shop subject to breakdownsIEEE Trans Rob Autom19981436537810.1109/70.678447
- WuSDStorerHSChangP-COne-machine rescheduling heuristics with efficiency and stability as criteriaComput Opns Res19932011410.1016/0305-0548(93)90091-V
- WilsonJMGantt charts: a centenary appreciationEur J Opl Res200314943043710.1016/S0377-2217(02)00769-5
- WillisRJCritical path analysis and resource constrained project scheduling—theory and practiceEur J Opl Res19852114915510.1016/0377-2217(85)90026-8
- LiRK-YWillisRJResource constrained project scheduling within fixed project durationsJ Opl Res Soc199344718010.1057/jors.1993.8
- SprecherAKolischRDrexlASemi-active, active and non-delay schedules for the resource-constrained project scheduling problemEur J Opl Res1995809410210.1016/0377-2217(93)E0294-8