References
- MohringRMinimizing costs of resource requirements in project networks subject to a fixed completion timeOpns Res1984328912010.1287/opre.32.1.89
- IcmeliOProject scheduling problems: a surveyInt J Opns Prod Mngt199313809110.1108/01443579310046454
- SprecherAResource-Constrained Project Scheduling: Exact Methods for the Multi-Mode Case1994
- KolischRProject Scheduling under Resource Constraints1995
- HerroelenWDe ReyckBDemeulemeesterEResource-constrained project scheduling: a survey of recent developmentsComput Opns Res19982527930210.1016/S0305-0548(97)00055-5
- DemeulemeesterEMinimizing resource availability costs in time-limited project networksMngt Sci1995411590159810.1287/mnsc.41.10.1590
- NeumannKZimmermannJResource leveling for projects with schedule-dependent time windowsEur J Opl Res199911759160510.1016/S0377-2217(98)00272-0
- KurtulusIDavisEMulti-project scheduling: categorization of heuristic rules performanceMngt Sci19822816117210.1287/mnsc.28.2.161
- BoctorFSome efficient multi-heuristic procedures for resource-constrained project schedulingEur J Opl Res19904931310.1016/0377-2217(90)90116-S
- LawrenceSMortonTResource-constrained multi-project scheduling with tardy costs: comparing myopic, bottleneck, and resource pricing heuristicsEur J Opl Res19936416818710.1016/0377-2217(93)90175-M
- KolischREfficient priority rules for the resource-constrained project scheduling problemJ Ops Mngt19961417919210.1016/0272-6963(95)00032-1
- KelleyJEThe Critical-Path Method: Resource Planning and Scheduling, Industrial Scheduling1963347365
- SlowinskiRMultiobjective network scheduling with efficient use of renewable and nonrenewable resourcesEur J Opl Res1981726527310.1016/0377-2217(81)90348-9
- TalbotBResource-constrained project scheduling with time-resource trade-offs: the non-preemptive caseMngt Sci1982281197121010.1287/mnsc.28.10.1197