References
- RosenblattMJLeeHLEconomic production cycles with imperfect production processesIIE Trans198618485510.1080/07408178608975329
- PorteusELOptimal lot sizing, process quality improvement and setup cost reductionOpns Res19863413714410.1287/opre.34.1.137
- PorteusELThe impact of inspection delay on process and inspection lot sizingMngt Sci19908999100710.1287/mnsc.36.8.999
- LeeHLRosenblattMJSimultaneous determination of production cycle and inspection schedules in a production systemMngt Sci1987331125113610.1287/mnsc.33.9.1125
- LeeHLRosenblattMJA production and maintenance planning model with restoration cost dependent on detection delayIIE Trans19892136837510.1080/07408178908966243
- LiouMJTsengSTLinTMThe effects of inspection errors to the imperfect EMQ modelIIE Trans199426425110.1080/07408179408966595
- LeeJSParkKSJoint determination of production cycle and inspection intervals in a deteriorating production systemJ Opl Res Soc19914277578310.1057/jors.1991.148
- HarigaMBen-DayaMThe economic manufacturing lot sizing problem with imperfect manufacturing processes: bounds and optimal solutionsNav Res Logts19984542343310.1002/(SICI)1520-6750(199806)45:4<423::AID-NAV8>3.0.CO;2-7
- McCallJJMaintenance policies for stochastically failing equipment: a surveyMngt Sci19651149352410.1287/mnsc.11.5.493
- BieleckiTKumarPROptimality of zero-inventory policies for unreliable manufacturing systemsOpns Res19883653254110.1287/opre.36.4.532
- PosnerMJMBergMAnalysis of a production-inventory system with unreliable production facilityOpns Res Let1989833934510.1016/0167-6377(89)90020-5
- GroeneveltHPintelonLSeidmannAProduction lot sizing with machine breakdownsMngt Sci19923810412310.1287/mnsc.38.1.104
- GroeneveltHPintelonLSeidmannAProduction batching with machine breakdowns and safety stocksOpns Res19924095997110.1287/opre.40.5.959
- KimCHHongYAn extended EMQ model for a failure prone machine with general lifetime distributionInt J Prod Eco19974921522310.1016/S0925-5273(97)00013-3
- ChungKJBounds for production lot sizing with machine breakdownsComp Ind Engg19973213914410.1016/S0360-8352(96)00207-0
- KimCHHongYKimSYAn extended optimal lot sizing model with an unreliable machineProd Plan Cont1997857758510.1080/095372897234911
- AbboudNEA simple approximation of the EMQ model with Poisson machine failuresProd Plan Cont1997838539710.1080/095372897235190
- DohiTYamadaYKaioNOsakiSThe optimal lot sizing for unreliable economic manufacturing modelsInt J Rel, Quality and Safety Eng1997441342610.1142/S0218539397000308
- BergMPosnerMJMZhaoHProduction-inventory systems with unreliable machinesOpns Res19944211111810.1287/opre.42.1.111
- SrinivasanMMLeeHSProduction-inventory systems with preventive maintenanceIIE Trans19962887989010.1080/15458830.1996.11770741
- Tse E and Makis V (1994). Optimization of the lot size and the time to replacement in a production system subject to random failure. Proceeding of the Third International Conference on Auto Tech, Taipei, Taiwan, pp. 163–169.
- MakisVOptimal lot sizing/preventive replacement policy for an EMQ model with minimal repairInt J Logts: Res and Appl1988117318010.1080/13675569808962046
- DohiTKaioNOsakiSMinimal repair policies for an economic manufacturing processJ Quality Maint Eng1998424826210.1108/13552519810233976
- MakisVFungJAn EMQ model with inspections and random machine failuresJ Opl Res Soc199849667510.1057/palgrave.jors.2600484
- CheungKLHausmanWHJoint determination of preventive maintenance and safety stocks in an unreliable production environmentNav Res Logts19974425727110.1002/(SICI)1520-6750(199704)44:3<257::AID-NAV2>3.0.CO;2-7
- DohiTOkamuraHOsakiSOptimal control of preventive maintenance schedule and safety stocks in an unreliable manufacturing environmentInt J Prod Eco20017414715510.1016/S0925-5273(01)00121-9
- HadleyGA comparison of order quantities computed using the average annual cost and the discounted costMngt Sci19641047247610.1287/mnsc.10.3.472
- TrippiRRLewinDEA present value formulation of the classical EOQ problemDeci Sci19745303510.1111/j.1540-5915.1974.tb00592.x
- GurnaniCEconomic analysis of inventory systemsInt J Prod Res19832126127710.1080/00207548308942352
- RachamaduguRError bounds for EOQNav Res Logts19883541942510.1002/1520-6750(198810)35:5<419::AID-NAV3220350506>3.0.CO;2-Y
- ChaoHThe EOQ model with stochastic demand and discountingEuro J Opl Res19925943444310.1016/0377-2217(92)90200-S
- DohiTKaioNOsakiSA note on optimal inventory policies taking account of time valueRAIRO-Opns Res199239114
- HaneveldWKKTeunterRHEffects of discounting and demand rate variability on the EOQInt J Prod Eco1998547392
- JaberMYBonneyMEconomic lot sizing with learning and continuous time discounting: Is it significant?Int J Prod Eco20017113514310.1016/S0925-5273(00)00113-4
- SunDQueyranneMProduction and inventory model using net present valueOpns Res20025052853710.1287/opre.50.3.528.7744