References
- WatadaJFuzzy portfolio selection and its applications to decision makingTatra Mountains Math Publ199713219248
- CarlssonCKorhonenPA parametric approach to fuzzy linear programmingFuzzy Sets and Systems198620173010.1016/S0165-0114(86)80028-8
- TabucanonMTMulti objective programming for industrial engineersMathematical Programming for Industrial Engineers1996487542
- RommelfangerHFuzzy linear programming and applicationsEur J Opl Res19969251252710.1016/0377-2217(95)00008-9
- ChenHKChouHWSolving multiobjective linear programming problems—a generic approachFuzzy Sets and Systems199682353810.1016/0165-0114(95)00277-4
- WangHFWangMLA fuzzy multi objective linear programmingFuzzy Sets and Systems199786617210.1016/0165-0114(95)00393-2
- ParraMATerolABUnaMVTheory and methodology solving the multi-objective possibilistic linear programming problemEur J Opl Res199917717518210.1016/S0377-2217(98)00160-X
- LaiYJHwangCLFuzzy Multi Objective Decision Making: Methods and Applications1994
- GuuSMWuYKTwo phase approach for solving the fuzzy linear programming problemsFuzzy Sets and Systems199910719119510.1016/S0165-0114(97)00304-7
- MalekiHRTataMMashinchiMLinear programming with fuzzy variablesFuzzy Sets and Systems2000109355310.1016/S0165-0114(98)00066-9
- GardinerLSteuerRUnified interactive multiple objective programming: an open architecture for accommodating new proceduresJ Opl Res Soc1994451456146610.1057/jors.1994.222
- BuckleyJJGeneralized and extended fuzzy sets with applicationFuzzy Sets and Systems19882515917410.1016/0165-0114(88)90184-4
- InuiguchiMRamikJPossibilistic linear programming: a brief review of fuzzy mathematical programming and a comparison with stochastic programming in portfolio selection problemFuzzy Sets and Systems200011132810.1016/S0165-0114(98)00449-7
- NishizakiISakawaMSolutions based on fuzzy goals in fuzzy linear programming gamesFuzzy Sets and Systems200011510511910.1016/S0165-0114(99)00028-7
- SenguptaAPalTKChakrabortyDInterpretation of inequality constraints involving interval coefficients and a solution to interval linear programmingFuzzy Sets and Systems200111912913810.1016/S0165-0114(98)00407-2
- ZimmermannHJDescription and optimization of fuzzy systemsInt J General Systems1976220921510.1080/03081077608547470
- WernersBAn interactive fuzzy programming systemFuzzy Sets and Systems19872313114710.1016/0165-0114(87)90105-9
- ChanasSThe use of parametric programming in fuzzy linear programmingFuzzy Sets and Systems19831124325110.1016/S0165-0114(83)80083-9
- VerdegayJLFuzzy Mathematical Programming1982
- ZimmermannHJFuzzy programming and linear programming with several objective functionsFuzzy Sets and Systems19781455510.1016/0165-0114(78)90031-3
- GoguenJAThe logic of inexact conceptsSyntheses19691932537310.1007/BF00485654
- ZadehLASimilarity relations and fuzzy orderingsInf Sci1971317720610.1016/S0020-0255(71)80005-1
- Zadeh LA (1975). The concept of a linguistic variable and its application to approximate reasoning I, II, III. Inf Sci 8: 199–251, 301–357; 9: 43–80.
- Pandian MV (2002). A methodology of decision making in an industrial production planning using interactive fuzzy linear programming. MSc thesis, University Malaysia Sabah, Malaysia.
- PandianMVNagarajanRYaacobSDecision making using modified s-curve membership function in fuzzy linear programming problemJ ICT20022116
- NowakowskaNMethodological problems of measurement of fuzzy concepts in the social sciencesBehav Sci19772210711510.1002/bs.3830220205