References
- WrightTPFactors affecting the cost of airplanesJ Aeronaut Sci1936312212810.2514/8.155
- BiskupDSingle-machine scheduling with learning considerationsEur J Opl Res199911517317810.1016/S0377-2217(98)00246-X
- MosheiovGScheduling problems with a learning effectEur J Opl Res200113268769310.1016/S0377-2217(00)00175-2
- MosheiovGParallel machine scheduling with a learning effectJ Opl Res Soc2001521165116910.1057/palgrave.jors.2601215
- MosheiovGSidneyJBScheduling with general job-dependent learning curvesEur J Opl Res200314766567010.1016/S0377-2217(02)00358-2
- BachmanAJaniakAScheduling jobs with position-dependent processing timesJ Opl Res Soc20045525726410.1057/palgrave.jors.2601689
- GareyMRJohnsonDSComputers and Intractability: A Guided Tour to the Theory of NP-completeness1979
- CampbellHGDudekRASmithMLA heuristic algorithm for n job m machine sequencing problemMngt Sci19701663063710.1287/mnsc.16.10.B630
- DannenbringDGAn evaluation of flow-shop sequencing heuristicsMngt Sci1977231174118210.1287/mnsc.23.11.1174
- GonzalezTSahniSFlowshop and jobshop schedules: complexity and approximationOpns Res197826365210.1287/opre.26.1.36
- SmutnickiCSome results of the worst-case analysis for flow shop schedulingEur J Opl Res1998109668710.1016/S0377-2217(97)00139-2
- MonmaCLRinnooy KanAHGA concise survey of efficient solvable special cases of the permutation flowshop problemRAIRO198317105119
- van den NouwelandAKrabbenborgMPottersJFlow-shops with a dominant machineEur J Opl Res199262384610.1016/0377-2217(92)90175-9
- HoJCGuptaJNDFlowshop scheduling with dominant machinesComput Opns Res19952223724610.1016/0305-0548(94)E0007-T
- XiangSTangGChengTCESolvable cases of permutation flowshop scheduling with dominating machinesInt J Prod Econ200066535710.1016/S0925-5273(99)00106-1
- ČepekOOkadaMVlachMNonpreemptive flowshop scheduling with machine dominanceEur J Opl Res200213924526110.1016/S0377-2217(01)00356-3
- GrahamRLLawlerELLenstraJKRinnooy KanAHGOptimization and approximation in deterministic sequencing and scheduling: a surveyAnn Discrete Math1979528732610.1016/S0167-5060(08)70356-X
- ThomasHRMathewsCTWardJGLearning curve models of construction productivityJ Constr Eng Mngt ASCE198611224525810.1061/(ASCE)0733-9364(1986)112:2(245)
- JohnsonSMOptimal two-and-three-stage production schedulesNaval Res Logist19541616810.1002/nav.3800010110
- PinedoMScheduling: Theory, Algorithms and Systems1995
- BakerKRIntroduction to Sequencing and Scheduling1974
- BadiruABComputational survey of univariate and multivariate learning curve modelsIEEE Trans Eng Mngt19923917618810.1109/17.141275
- DejongJRThe effects of increasing skill on cycle time and its consequences for time standardsErgonomics19571516010.1080/00140135708964571
- PegelsCCOn start-up or learning curves: an expanded viewAIIE Trans19691316322
- ForstFGBicriterion stochastic scheduling on one or more machinesEur J Opl Res19958040440910.1016/0377-2217(93)E0284-5