References
- BoothroydGAltingLDesign for assembly and disassemblyCIRP Ann: Manufac Technol19924162563610.1016/S0007-8506(07)63249-1
- ErdösGKisTXirouchakisPModeling and evaluating product end-of-life optionsInt J Prod Res2001391203122010.1080/713845985
- GoffinJLOn convergence rates of subgradient optimization methodsMath Program19771332934710.1007/BF01584346
- GuptaSMTalebKNScheduling disassemblyInt J Prod Res1994321857188610.1080/00207549408957046
- HeldMWolfePCrowtherHPValidation of subgradient optimizationMath Program19746636810.1007/BF01580223
- JovaneFA key issue in product life cycle: disassemblyCIRP Ann: Manufac Technol19934265165810.1016/S0007-8506(07)62530-X
- KangJ-GLeeD-HXirouchakisPDisassembly sequencing with imprecise data: a case studyInt J Ind Eng200310407412
- KangJ-GLeeD-HXirouchakisPLambertAJDOptimal disassembly sequencing with sequence dependent operation times based on the directed graph of assembly statesJ Korean Ins Ind Eng200228264273
- KangJ-GLeeD-HXirouchakisPPerssonJ-GParallel disassembly sequencing with sequence-dependent operation timesCIRP Ann: Manufac Technol20015034334610.1016/S0007-8506(07)62136-2
- KimH-JLeeD-HXirouchakisPZüstRDisassembly scheduling with multiple product typesCIRP Ann: Manufac Technol20035240340610.1016/S0007-8506(07)60611-8
- Kim H-J, Lee D-H and Xirouchakis P (2005). A two-phase heuristic for disassembly scheduling with multiple product types and parts commonality. Int J Prod Res (in press).
- LambertAJDDisassembly sequencing: a surveyInt J Prod Res2003413721375910.1080/0020754031000120078
- LeeD-HDisassembly scheduling for products with assembly structureInt J Mngt Sci2005116378
- LeeD-HKangJ-GXirouchakisPDisassembly planning and scheduling: review and further researchProc Inst Mech Eng: J Eng Manufac – Part B200121569571010.1243/0954405011518629
- LeeD-HKimH-JChoiGXirouchakisPDisassembly scheduling: integer programming modelsProc Inst Mech Eng: J Eng Manufac – Part B20042181357137210.1243/0954405042323586
- LeeD-HXirouchakisPA two-stage heuristic for disassembly scheduling with assembly product structureJ Opl Res Soc20045528729710.1057/palgrave.jors.2601690
- LeeD-HXirouchakisPZüstRDisassembly scheduling with capacity constraintsCIRP Ann: Manufac Technol20025138739010.1016/S0007-8506(07)61543-1
- NeuendorfK-PLeeD-HKiritsisDXirouchakisPDisassembly scheduling with parts commonality using Petri-nets withtimestampsFundamenta Informaticae200147295306
- O’SheaBGrewalSSKaebernickHState of the art literature survey on disassembly planningConcurrent Eng: Res Appl1998634535710.1177/1063293X9800600407
- SantochiMDiniGFailliFComputer aided disassembly planning: state of the art and perspectivesCIRP Ann: Manufac Technol20025112310.1016/S0007-8506(07)61698-9
- TalebKNGuptaSMDisassembly of multiple product structuresComput Indus Eng19973294996110.1016/S0360-8352(97)00023-5
- TalebKNGuptaSMBrennanLDisassembly of complex product structures with parts and materials commonalityProd Plan Control1997825526910.1080/095372897235316
- WagelmansAHoeselSVKolenAEconomic lot sizing: an O(n log n) algorithm that runs in linear time in the Wagner–Whitin caseOpns Res19924014515610.1287/opre.40.1.S145
- XirouchakisPKiritsisDA generic Petri net model for disassembly planning processesProceedings of Symposium on Tools and Methods for Concurrent Engineering1996523529
- XirouchakisPKiritsisDPetri net model for disassembly process planningProceedings of ASME Conference on Concurrent Product Design and Environmentally Conscious Manufacturing1997255267