References
- CowlingPRezigWIntegration of continuous caster and hot strip mill planning for steel productionJ Scheduling2000318520810.1002/1099-1425(200007/08)3:4<185::AID-JOS42>3.0.CO;2-G
- Dupont L, Rézard H and Allaili A (1997). Ordonnancement sous contraintes d'un laminoir à chaud, Deuxième Congrès International Franco-Québécois de Génie Industriel. École des Mines d'Albi-Carmaux, Albi, 1997.
- Fang H-L and Tsai C-H (1998). A genetic algorithm approach to hot strip mill rolling scheduling problems. In: Proceedings of the Tenth IEEE International Conference on Tools with Artificial Intelligence. IEEE Computer Society Press, Piscataway, NJ, pp 264–271.
- Frontini GF and Bonhomme J (1999). Optimizing asset utilization in aluminum hot rolling mills. In: Langevin A, Ropel D and Ladet P (eds). 3iéme Congrès International de Génie Industriel, Presses Internationales Polytechnique, Montreal, Canada.
- LopezLCarterMWGendreauMThe hot strip mill production scheduling problem: a tabu search approachEur J Opl Res199810631733510.1016/S0377-2217(97)00277-4
- MayrandÉLefrançoisPKettaniOJobinM-HA genetic search algorithm to optimize job sequencing under a technological constraint in a rolling-mill facilityOR Spektrum19951718319110.1007/BF01719263
- StaufferLLieblingTMRolling horizon scheduling in a rolling-millAnn Opns Res19976932334910.1023/A:1018993331077
- Tamaki H, Mori M and Araki M (1994). Multi-criteria optimization by genetic algorithms: a case of scheduling in hot rolling process. In: Fushimi M and Tone K (eds). Proceedings of APORS'94, Association of Asia-Pacific Operational Research Societies, World Scientific, Singapore, pp 374–381.
- TangLLiuJRongAYangZA multiple traveling salesman problem model for hot rolling scheduling in Shanghai Baoshan Iron & Steel ComplexEur J Opl Res200012426728210.1016/S0377-2217(99)00380-X