References
- AlidaeeBRosaDScheduling parallel machines to minimize total weighted and unweighted tardinessComput Opns Res19972477578810.1016/S0305-0548(96)00080-9
- AzizogluMKircaOTardiness minimization on parallel machinesInt J Prod Econom19985516316810.1016/S0925-5273(98)00034-6
- AzizogluMKircaOScheduling jobs on unrelated parallel machines to minimize regular total cost functionIIE Trans199931153159
- ChengTCEChenZLParallel-machine scheduling problems with earliness and tardiness penaltiesJ Opl Res Soc19944568569510.1057/jors.1994.106
- DogramaciASurkisJEvaluation of a heuristic for scheduling independent jobs on parallel identical processorsMngt Sci1979251208121610.1287/mnsc.25.12.1208
- EmmonsHOne-machine sequencing to minimize certain functions of job tardinessOprns Res19691770171510.1287/opre.17.4.701
- GuptaJNDRuiz-TorresAJWebsterSMinimizing maximum tardiness and number of tardy jobs on parallel machines subject to minimum flow-timeJ Opl Res Soc2003541263127410.1057/palgrave.jors.2601638
- HoJCChangYLHeuristics for minimizing mean tardiness for m parallel machinesNav Res Log19913836738110.1002/1520-6750(199106)38:3<367::AID-NAV3220380307>3.0.CO;2-I
- KimYDOn the superiority of a backward approach in list scheduling algorithms for multi-machine makespan problemsInt J Prod Res1987251751175910.1080/00207548708919866
- KimYDA backward approach in list scheduling algorithms for multi-machine tardiness problemsComput Opns Res19952230731910.1016/0305-0548(94)00045-A
- KoHHBaekJKKangYHKimSSA scheduling scheme for restricted parallel machines with cycling processJ Korean Inst Ind Eng200430107119
- KondakciSKircaOAzizogluMAn efficient algorithm for the single machine tardiness problemInt J Prod Econ19943621321910.1016/0925-5273(94)90026-4
- KoulamasCPDecomposition and hybrid simulated annealing heuristics for the parallel-machine total tardiness problemNav Res Log19974410912510.1002/(SICI)1520-6750(199702)44:1<109::AID-NAV7>3.0.CO;2-E
- LeeYHPinedoMScheduling jobs on parallel machines with sequence-dependent setup timesEur J Opl Res199710046447410.1016/S0377-2217(95)00376-2
- LiawCFLinYKChengCYChenMScheduling unrelated parallel machines to minimize total weighted tardinessComput Opns Res2003301777178910.1016/S0305-0548(02)00105-3
- PanwalkarSSSmithMLKoulamasCPA heuristic for the single machine tardiness problemEur J Opl Res19937030431010.1016/0377-2217(93)90241-E
- ParkMWA genetic algorithm for the parallel-machine total weighted tardiness problemJ Korean Inst Ind Eng200026183192
- PottsCNVan WassenhoveLNA branch and bound algorithm for the total weighted tardiness problemOpns Res19853336337710.1287/opre.33.2.363
- RachamaduguRMVA note on the weighted tardiness problemOpns Res19873545045210.1287/opre.35.3.450
- VepsalainenAMortonTPriority rules for job shops with weighted tardiness costsMngt Sci1987331035104710.1287/mnsc.33.8.1035
- YalaouiFChuCParallel machine scheduling to minimize total tardinessInt J Prod Econom20027626527910.1016/S0925-5273(01)00175-X