References
- AgnihothriSRMishraAKSimmonsDEWorkforce cross-training decisions in field service systems with two job typesJ Opl Res Soc20035441041810.1057/palgrave.jors.2601535
- AlfaresHKAn efficient two-phase algorithm for cyclic days-off schedulingComput Opns Res19972591392310.1016/S0305-0548(98)00033-1
- AronsonJEThe multiperiod assignment problem: a multicommodity network flow model and specialized branch and bound algorithmEur J Opl Res19862336738110.1016/0377-2217(86)90302-4
- AykinTOptimal shift scheduling with multiple break windowsMngt Sci19964259160210.1287/mnsc.42.4.591
- BardJFStaff scheduling in high volume service facilities with downgradingIIE Transac Schedul Logis20043698599710.1080/07408170490487812
- BardJFBiniciCdeSilvaAHStaff scheduling at the United States Postal ServiceComput Opns Res20033074577110.1016/S0305-0548(02)00048-5
- BardJFFeoTAAn algorithm for the manufacturing equipment selection problemIIE Transac199123839210.1080/07408179108963843
- BardJFWanLWeekly scheduling in the service industry: an application to mail processing & distribution centersIIE Transac Schedul Logis20053737939610.1080/07408170590885288
- Bard JF and Wan L (2005b). Workforce design with movement restrictions between workstation groups. Working paper, Graduate Program in Operations Research & Industrial Engineering, University of Texas, Austin, Texas.
- BardJFWanLThe task assignment problem for unrestricted movement between workstation groupsJ Schedul2006931534110.1007/s10951-006-7038-7
- BechtoldSEJacobsLWImplicit modeling of flexible break assignments in optimal shift schedulingMngt Sci1990361339135110.1287/mnsc.36.11.1339
- BermanOLarsonRCPinkerEScheduling workforce and workflow in a high volume factoryMngt Sci19974315817210.1287/mnsc.43.2.158
- BerradaIFerlandJAMichelonPA multi-objective approach to nurse scheduling with both hard and soft constraintsSocio-Economic Plan Sci19963018319310.1016/0038-0121(96)00010-9
- BillionnetAInteger programming to schedule a hierarchical workforce with variable demandsEur J Opl Res199911410511410.1016/S0377-2217(98)00182-9
- BruscoMJJacobsLWPersonal tour scheduling when starting time restrictions are presentMngt Sci19984453454710.1287/mnsc.44.4.534
- BurkeEKCausmaeckerPDVanden BergheGA hybrid tabu search algorithm for the nurse rostering problemSimulated Evolution and Learning1999187194
- BurkeEKCausmaeckerPDVanden BergheGVan LandeghemHThe state of the art of nurse rosteringJ Schedul2004744149910.1023/B:JOSH.0000046076.75950.0b
- BurnsRNCarterMWWork force size and single shift schedules with variable demandsMngt Sci19853159960710.1287/mnsc.31.5.599
- CapraraAMonaciMTothPModels and algorithms for a staff scheduling problemMath Program Ser B20039844547610.1007/s10107-003-0413-7
- CampbellGMDiabyMDevelopment and evaluation of an assignment heuristic for allocating cross-trained workersEur J Opl Res200213892010.1016/S0377-2217(01)00107-2
- DawidHKonigJStraussCAn enhanced rostering model for airline crewsComput Opns Res20012867168810.1016/S0305-0548(00)00002-2
- EastonFFRossinDFOvertime schedules for full time service workersOmega19972528529910.1016/S0305-0483(96)00063-1
- ErnstATJiangHKrishnamoorthyMSierDStaff scheduling and rostering: a review of applications, methods and modelsEur J Opl Res2004153131710.1016/S0377-2217(03)00095-X
- FranzLSMillerJLScheduling medical residents to rotations: solving the large-scale multi-period staff assignment problemOpns Res19934126927910.1287/opre.41.2.269
- GilbertKCHofstraRBMultidimensional assignment problemsDec Sci19881930632110.1111/j.1540-5915.1988.tb00269.x
- JarrahAIZBardJFdeSilvaAHSolving large-scale tour scheduling problemsMngt Sci1994401124114510.1287/mnsc.40.9.1124
- MollemanESlompJFunctional flexibility and team performanceInt J Product Res1999371837185810.1080/002075499191021
- PierskallaWPThe multidimensional assignment problemOpns Res19681542243110.1287/opre.16.2.422
- QuanVRetail labor schedulingOR/MS Today20043163235
- ShowalterMJKrajewskiLJRitzmanLPManpower allocation in US Postal facilitiesComput Opns Res: a heuristic approach1977425726910.1016/0305-0548(77)90024-7
- WolseyLAInteger Programming1998
- ZhangXBardJFEquipment scheduling at mail processing and distribution centersIIE Transac Schedul Logis20053717518710.1080/07408170590885657