References
- BeasleyJEKrishnamoorthyMSharaihaYMAbramsonDScheduling aircraft landings—The static caseTransp Sci20003418019710.1287/trsc.34.2.180.12302
- BeasleyJESonanderJHavelockPScheduling aircraft landings at London Heathrow using a population heuristicJ Opl Res Soc20015248349310.1057/palgrave.jors.2601129
- BeasleyJEKrishnamoorthyMSharaihaYMAbramsonDDisplacement problem and dynamically scheduling aircraft landingsJ Opl Res Soc200455546410.1057/palgrave.jors.2601650
- BiancoLRicciardelliSRinaldiGSassanoAScheduling tasks with sequence-dependent processing timesNav Res Log19883517718410.1002/1520-6750(198804)35:2<177::AID-NAV3220350203>3.0.CO;2-V
- BiancoLDell'OlmoPGiordaniSMinimizing total completion time subject to release dates and sequence-dependent processing timesAnn Opns Res19998639341510.1023/A:1018975323093
- BoeselJSimulating aircraft delay absorptionProceedings of the 2003 Winter Simulation Conference200316631669
- Brentnall AR (2006). Aircraft arrival management. PhD thesis, University of Southampton.
- BrentnallARChengRCHDrewAStatistical analysis of an air traffic control problemJ Simul Syst Sci Technol200452632
- CarrollRJRuppertDTransformation and Weighting in Regression1988
- D'AgostinoRBStephensMAGoodness-of-Fit Techniques1986
- DavisonACStatistical Models. Cambridge Series in Statistical and Probabilistic Mathematics2003
- DearRGSherifYSAn algorithm for computer-assisted sequencing and scheduling of terminal area operationsTrans R A19912512913910.1016/0191-2607(91)90132-A
- EfronBTibshiraniRJAn Introduction to the Bootstrap1998
- ErnstATKrishnamoorthyMStorerRHHeuristic and exact algorithms for scheduling aircraft landingsNetworks19993422924110.1002/(SICI)1097-0037(199910)34:3<229::AID-NET8>3.0.CO;2-W
- Eurocontrol (2000). AMAN feasibility study (part 2) literature study and site visit reports. Technical report, Eurocontrol, Brussells, Belgium.
- Eurocontrol (2006). Summary report of the EVP AMAN Rome real time simulation 2004. Technical report, Eurocontrol, Brussells, Belgium.
- Fahle T, Feldmann R, Gotz S, Grothklags S and Monien B (2003). The aircraft sequencing problem. In: Klein R, Six H, Wegner L, (eds). Lecture Notes in Computer Science Vol. 2598. Springer: Berlin, pp 152–166.
- GravesDUK Air Traffic Control1998
- HopkinsDHuman Factors in Air Traffic Control1995
- Performance Review Unit (1999). An ATM measurement system—Key performance areas. Technical report, Eurocontrol, Brussells, Belgium.
- Performance Review Unit (2007). An assessment of Air Traffic Management in Europe during the calendar year 2006. Technical report, Eurocontrol, Brussells, Belgium.
- PinedoMScheduling Theory, Algorithms, and Systems1995
- PsaraftisHNA dynamic-programming approach for sequencing groups of identical jobsOpns Res1980281347135910.1287/opre.28.6.1347
- RiceJAMathematical Statistics and Data Analysis1995
- STATFOR (2007). Eurocontrol medium-term forecast: IFR flight movements 2007–2013, Vol. 1. Technical report, Eurocontrol, Brussells, Belgium.
- VenkatakrishnanCSBarnettAOdoniARLandings at Logan-airport—Describing and increasing airport capacityTransp Sci19932721122710.1287/trsc.27.3.211