References
- BakerKRAn experimental study of the effectiveness of rolling schedules in production planningDecision Sci19778192710.1111/j.1540-5915.1977.tb01065.x
- Birge JR and Louveaux F (1997). Introduction to Stochastic Programming. Springer Series in Operations Research. Springer: New York.
- BookbinderJHTanJYStrategies for the probabilistic lot-sizing problem with service-level constraintsMngt Sci19883491096110810.1287/mnsc.34.9.1096
- ChandSRolling horizon procedures for the facilities in series inventory model with nested schedulesMngt Sci19832923724910.1287/mnsc.29.2.237
- ChelbiAAït-KadiDSpare provisioning strategy for preventively replaced systems subjected to random failureInt J Prod Econ20017418318910.1016/S0925-5273(01)00125-6
- ChenXSimchi-LeviDCoordinating inventory control and pricing strategies with random demand and fixed ordering cost: The finite horizon caseOpns Res20045288789610.1287/opre.1040.0127
- GravesSCA single-item inventory model for a nonstationary demand processManuf Serv Opns Mngt199915061
- HuaZSZhangBYangJTanDSA new approach of forecasting intermittent demand for spare parts inventories in the process industriesJ Opl Res Soc2007581526110.1057/palgrave.jors.2602119
- KabirAZAl-OlayanASA stocking policy for spare part provisioning under age based preventive replacementEur J Opl Res19969017118110.1016/0377-2217(94)00246-0
- KimDMabertVACycle scheduling for discrete shipping and dynamic demandsComput Indust Eng20003821523310.1016/S0360-8352(00)00002-4
- MartelADiabyMBoctorFMultiple items procurement under stochastic nonstationary demandsEur J Opl Res199587749210.1016/0377-2217(94)00019-9
- ÖzbanAYSome new variants of Newton's methodAppl Math Lett20041767768210.1016/S0893-9659(04)90104-8
- RaghunathanSInformation sharing in a supply chain: a note on its value when demand is nonstationaryMngt Sci20014760561010.1287/mnsc.47.4.605.9833
- SilverEAInventory control under a probabilistic time-varying demand patternAIIE Trans19781037137910.1080/05695557808975228
- SoxCRDynamic lot sizing with random demand and non-stationary costsOpl Res Lett19972015516410.1016/S0167-6377(97)00005-9
- TarimSAKingsmanBGThe stochastic dynamic production/inventory lot-sizing problem with service-level constraintsInt J Prod Econ20048810511910.1016/S0925-5273(03)00182-8
- TarimSAKingsmanBGModelling and computing (Rn,Sn) policies for inventory systems with non-stationary stochastic demandEur J Opl Res200617458159910.1016/j.ejor.2005.01.053
- van den HeuvelWWagelmansAPMA comparison of methods for lot-sizing in a rolling horizon environmentOpl Res Lett20053348649610.1016/j.orl.2004.10.001
- VaughanTSFailure replacement and preventive maintenance spare parts ordering policyEur J Opl Res200516118319010.1016/j.ejor.2003.06.026