110
Views
6
CrossRef citations to date
0
Altmetric
Article

Processing incomplete data for simulation-based production planning in shipbuilding

, , , &
Pages 30-37 | Received 03 Feb 2016, Accepted 16 Nov 2016, Published online: 19 Dec 2017

References

  • GrußRSchlanke UnikatfertigungZweistufiges Taktphasenmodell zur Steigerung der Prozesseffizienz in der Unikatfertigung auf Basis der Lean Production2010WiesbadenGabler Verlag
  • Hinrichs H (2002). Datenqualitätsmanagement in Data Warehouse-Systemen. PhD thesis, Universität Oldenburg.
  • KandelAFuzzy expert systems1991Boca RatonCRC Press
  • Kuhlmann T (1994). Konzeption und Entwicklung eines Systems zur Koordinierung der Produktion komplexer Unikate. PhD thesis, Universität Bremen.
  • LiZIerapetritouMProcess scheduling under uncertainty - Review and challengesComputers & Chemical Engineering2008324–571572710.1016/j.compchemeng.2007.03.001
  • ManziniMUrgoMMakespan estimation of a production process affected by uncertainty: Application on MTO production of NC machine toolsJournal of Manufacturing Systems20153711610.1016/j.jmsy.2015.10.001
  • Schmidt M (2011). Modellierung logistischer Prozesse der Montage. PhD thesis, Leibniz Universität Hannover.
  • Steinhauer D, Hübler M, Wagner L, Esins E, Pester P, Friedewald A and Wandt R (2011). GeneSim—Generisches Daten- und Modellmanagement für die schiffbauliche Produktionssimulation. In: Forschungszentrum Jülich (eds). Statustagung Schifffahrt und Meerestechnik: Rostock, pp 7–23.
  • Steinhauer D (2011). The Simulation Toolkit Shipbuilding—10 Years of Cooperative Development and Interbranch Applications. In: Proceedings of the 10thInternational Conference on Computer and IT Applications in the Maritime Industries (COMPIT), Berlin, pp 453–465.
  • StorchRShip Production1995Centerville, MACornell Maritime Press
  • TolioTUrgoMVánczaJRobust production control against propagation of disruptionsCIRP Annals - Manufacturing Technology201160148949210.1016/j.cirp.2011.03.047
  • WangRYStrongDMBeyond accuracy: What data quality means to data consumersJournal of Management Information Systems199612453310.1080/07421222.1996.11518099
  • WernersBThornJSupply Chain Planning bei NachfrageunsicherheitPPS Management2002725154

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.