REFERENCES
- ALARCON , LUIS F. , DAVID B. ASHLEY ,“ Modeling Project Performance for Decision Making ,” Journal of Construction Engineering and Management , ASCE , Vol. 122 , No. 3 . pp. 265 – 273 .
- BACON , ROBERT W. , JOHN E. BESANT-JONES , JAMISHID HEIDARIAN ,“ Estimating Construction Costs and Schedules Experience with Power Generation Projects in Developing Countries ,” The World Bank , Washington , D.C .
- BHARATH , R. and J. DROSEN , Neural Network Computing , Windcrest/McGraw-Hill , lue Ridge Summi t, PA , 1994 .
- BRANDON , PETER S. , (Ed.) Quantity Surveying Techniques New Directions. Blackwell Scientific Publications . London . U.K . 1992 .
- CROWLEY , LARRY G. , DONN E. HANCHER ,“ Risk Assessment of Competitive Procurement ,” Journal of Construction Engineering and Management , ASCE Vol. 121 , No. 2 , 1995 , pp. 230 – 237 .
- CROWLEY , LARRY G. ,“ Robust Statistical Estimators for Use Within Competitive Bid Data ,” Journal of Construction Engineering and Management , ASCE , Vol. 123 . No. I. 1997 , pp. 53 – 63 .
- FLOOD , I. , and KARTAM , N. “ Neural Networks in Civil Engineering. 1 Principals and Understanding ,” Journal of Computing in Civil Engineering , ASCE , Vol. 8 , No. 2 , 1994 , pp. 131 – 148 .
- GATES. MARVIN. “ Bidding Strategies and Probabilities .” Journal of the Construction Division , Proceedings of the American Society of Civil Engineers, ASCE. Vol. 93 No. 1 . 1967 , pp. 75 – 107 .
- GROGAN , T. ,;“ Cost Indexes Listed in ENR's January 4.1999 Issue ” http//www.enr.com/cost/cost2.asp (I Feb 1999 )
- HAJAK. MAKARAND , DANI EL W. HALPIN , JORGE VANEGES ,“ COMPASS - New Paradigm for Project Cost Control Strategy and Planning ,” Journal of Construction Engineering and Management , ASCE . Vol. 122 , No. 3 , 1996 , pp. 254 – 263 .
- MENDENHALL , WILLIAM and TERRY SINCICH , A Second Course in StatisticsRegression Analysis , Prentice Hall, Upper Saddle River . NJ , 1996 .
- OSTWALD , PHILLIP F. , Construction Cost Analysis and Estimating , Prentice Hall, Upper Saddle River , NJ , 2001 .
- PEDWELL , KEITH , FRANCIS T. HARTMAN , GEORGE F. JERGEAS ,“ Project Capital Cost Risk and Contracting Strategies ,” Cost Engineering , AACE , 1998 .
- SMITH , ALICE E. , MASON , ANTHONY K. ,“ Cost Estimation Predictive Modeling Regression Versus Neural Network ,” The Engineering Economist ,Vol. 42 , No. 2 , 1997 , pp. 137 – 161 .
- SPSS and Recognition Systems , Inc. Neural Connection 1.0 User's Guide . SPSS , Chicago . IL , 1995 .
- TOURAN , ALL “ Probablistic Cost Estimating with Subjective Correlations ,” Journal of Construction Engineering and Management , ASCE Vol. 119 , No. 1 , 1993 , pp. 57 – 71 .
- WILLIAMS , T. , J. MILES , and C. MOORE ,“ Modeling Cost Increases in Competitively Bid Construction Projects ,” Proceedings of the Construction and Building Research Conference 1998 ,Vol. 1 , The Royal Institution of Chartered Surveyors, Oxford, U.K., September 1998 , pp. 102 – 110 .
- ZACK , JAMES G. ,“ Claimsmanship Current Perspective ,” Journal of Construction Engineering and Management , ASCE Vol. 119 , No. 3 . pp. 480 – 497 .