Publication Cover
The Engineering Economist
A Journal Devoted to the Problems of Capital Investment
Volume 65, 2020 - Issue 4
164
Views
10
CrossRef citations to date
0
Altmetric
Articles

Non-equal-life asset replacement under evolving technology: A multi-cycle approach

ORCID Icon, ORCID Icon &

References

  • Al-Chalabi, H., Lundberg, J., Ahmadi, A., & Jonsson, A. (2015). Case study: Model for economic lifetime of drilling machines in the Swedish mining industry. The Engineering Economist, 60(2), 138–154. doi:10.1080/0013791X.2014.952466
  • Bean, J. C., Lohmann, J. R., & Smith, R. L. (1984). A dynamic infinite horizon replacement economy decision model. The Engineering Economist, 30(2), 99–120. doi:10.1080/00137918408902899
  • Bean, J. C., Lohmann, J. R., & Smith, R. L. (1994). Equipment replacement under technological change. Naval Research Logistics, 41(1), 117–128. doi:10.1002/1520-6750(199402)41:1<117::AID-NAV3220410108>3.0.CO;2-U
  • Bean, J. C., & Smith, R. L. (1984). Conditions for the existence of planning horizons. Mathematics of Operations Research, 9(3), 391–401. doi:10.1287/moor.9.3.391
  • Bellman, R. (1955). Equipment replacement policy. Journal of the Society for Industrial and Applied Mathematics, 3(3), 133–136. doi:10.1137/0103011
  • Bethuyne, G. (1998). Optimal replacement under variable intensity of utilization and technological progress. The Engineering Economist, 43(2), 85–106. doi:10.1080/00137919808903191
  • Büyüktahtakın, I. E., & Hartman, J. C. (2016). A mixed-integer programming approach to the parallel replacement problem under technological change. International Journal of Production Research, 54(3), 680–695. doi:10.1080/00207543.2015.1030470
  • Christer, A. H., & Scarf, P. A. (1994). A robust replacement model with applications to medical equipment. Journal of the Operational Research Society, 45(3), 261–275. doi:10.1057/jors.1994.39
  • Des-Bordes, E., & Büyüktahtakın, I. E. (2017). Optimizing capital investments under technological change and deterioration: A case study on MRI machine replacement. The Engineering Economist, 62(2), 105–131. doi:10.1080/0013791X.2015.1126775
  • Elton, E. J., & Gruber, M. J. (1976). On the optimality of an equal life policy for equipment subject to technological improvement. Journal of the Operational Research Society, 27(1), 93–99. doi:10.1057/jors.1976.9
  • Fitzpatrick, A. (2017, July 3). Hand me that wrench: Farmers and Apple fight over the toolbox. Times, p. 20–21.
  • Goetz, R., Hritonenko, N., & Yatsenko, Y. (2008). The optimal economic lifetime of vintage capital in the presence of operating cost, technological progress, and learning. Journal of Economic Dynamics and Control, 32(9), 3032–3053. doi:10.1016/j.jedc.2007.12.003
  • Grinyer, P. (1973). The effects of technological change on the economic life of capital equipment. AIIE Transactions, 5, 203–213.
  • Hartman, J. (2007). Engineering economy and the decision-making process. Upper Saddle River, New Jersey: Pearson Prentice Hall.
  • Hartman, J., & Murphy, A. (2006). Finite horizon equipment replacement analysis. IIE Transactions, 38(5), 409–419. doi:10.1080/07408170500380054
  • Hartman, J., & Tan, C. H. (2014). Equipment replacement analysis: A literature review and directions for future research. The Engineering Economist, 59(2), 136–153. doi:10.1080/0013791X.2013.862891
  • Hilten, O. V. (1991). The optimal lifetime of capital equipment. Journal of Economic Theory, 55, 449–454.
  • Hritonenko, N., & Yatsenko, Y. (2007). Optimal equipment replacement without paradoxes: A continuous analysis. Operations Research Letters, 35(2), 245–250. doi:10.1016/j.orl.2006.03.001
  • Jovanovic, B., & Yatsenko, Y. (2012). Investment in vintage capital. Journal of Economic Theory, 147(2), 551–569. doi:10.1016/j.jet.2010.10.017
  • Liu, L., Keoleian, G. A., & Saitou, K. (2017). Replacement policy of residential lighting optimized for cost, energy, and greenhouse gas emissions. Environmental Research Letters, 12(11), 114034–114010. doi:10.1088/1748-9326/aa9447
  • Malcomson, J. M. (1975). Replacement and the rental value of capital equipment subject to obsolescence. Journal of Economic Theory, 10(1), 24–41. doi:10.1016/0022-0531(75)90059-9
  • Mardin, F., & Takeshi, A. (2012). Capital equipment replacement under technological change. The Engineering Economist, 57(2), 119–129. doi:10.1080/0013791X.2012.677112
  • Newman, D., Eschenbach, T., & Lavelle, J. (2004). Engineering economic analysis (9th ed.). New York: Oxford University Press.
  • Oakford, R. V., Lohmann, J. R., & Salazar, A. (1984). A dynamic replacement economy decision model. IIE Transactions, 16(1), 65–72. doi:10.1080/07408178408974669
  • Prat, J., & Walter, B. (2018). An equilibrium model of the market for bitcoin mining. CESifo Working Paper Series No. 6865. Retrieved from https://ssrn.com/abstract=3143410.
  • Raposo, H., Farinha, J. T., Ferreira, L., & Galar, D. (2018). Dimensioning reserve bus fleet using life cycle cost models and condition based/predictive maintenance: A case study. Public Transport, 10(1), 169–190. doi:10.1007/s12469-017-0167-x
  • Regnier, E., Sharp, G., & Tovey, C. (2004). Replacement under ongoing technological progress. IIE Transactions, 36(6), 497–508. doi:10.1080/07408170490438401
  • Richardson, S., Kefford, A., & Hodkiewicz, M. (2013). Optimised asset replacement strategy in the presence of lead time uncertainty. International Journal of Production Economics, 141(2), 659–667. doi:10.1016/j.ijpe.2012.10.006
  • Scarf, P. A., & Bouamra, O. (1999). A capital equipment replacement model for a fleet with variable size. Journal of Quality in Maintenance Engineering, 5(1), 40–49. doi:10.1108/13552519910257050
  • Scarf, P. A., Dwight, R., McCusker, A., & Chan, A. (2007). Asset replacement for an urban railway using a modified two-cycle replacement model. Journal of the Operational Research Society, 58(9), 1123–1137. doi:10.1057/palgrave.jors.2602288
  • Scarf, P. A., & Hashem, M. (1997). On the application of an economic life model with a fixed planning horizon. International Transactions in Operational Research, 4(2), 139–150. doi:10.1111/j.1475-3995.1997.tb00070.x
  • Scarf, P. A., & Hashem, M. (2002). Characterization of optimal policies for capital replacement models. IMA Journal of Management Mathematics, 13(4), 261–271. doi:10.1093/imaman/13.4.261
  • Seif, J., & Rabbani, M. (2014). Component based life cycle costing in replacement decisions. Journal of Quality in Maintenance Engineering, 20(4), 436–452. doi:10.1108/JQME-08-2013-0053
  • Sethi, S., & Chand, S. (1979). Planning horizon procedures in machine replacement models. Management Science, 25(2), 140–151. doi:10.1287/mnsc.25.2.140
  • Tan, C. H., & Hartman, J. (2010). Equipment replacement analysis with an uncertain finite horizon. IIE Transactions, 42(5), 342–353. doi:10.1080/07408170903394363
  • Thuesen, G., & Fabrycky, W. (1993). Engineering economy (8th ed.). Englewood Cliffs, NJ: Prentice-Hall.
  • Wagner, H. M. (1975). Principles of operations research. Englewood Cliffs, NJ: Prentice-Hall.
  • Yatsenko, Y., & Hritonenko, N. (2005). Optimization of the lifetime of capital equipment using integral models. Journal of Industrial and Management Optimization, 1(4), 415–432. doi:10.3934/jimo.2005.1.415
  • Yatsenko, Y., & Hritonenko, N. (2008). Properties of optimal machine service life under technological change. International Journal of Production Economics, 114(1), 230–238. doi:10.1016/j.ijpe.2008.02.008
  • Yatsenko, Y., & Hritonenko, N. (2009). Technological breakthroughs and asset replacement. The Engineering Economist, 54(2), 81–100. doi:10.1080/00137910902893656
  • Yatsenko, Y., & Hritonenko, N. (2010). Discrete-continuous analysis of optimal equipment replacement. International Transactions in Operational Research, 17(5), 577–593. doi:10.1111/j.1475-3995.2009.00747.x
  • Yatsenko, Y., & Hritonenko, N. (2011). Economic life replacement under improving technology. International Journal of Production Economics, 133(2), 596–602. doi:10.1016/j.ijpe.2011.04.027
  • Yatsenko, Y., & Hritonenko, N. (2015). Algorithms for asset replacement under limited technological forecast. International Journal of Production Economics, 160, 26–33. doi:10.1016/j.ijpe.2014.08.020
  • Yatsenko, Y., & Hritonenko, N. (2016). Asset replacement under improving operating and capital costs: A practical approach. International Journal of Production Research, 54(10), 2922–2933. doi:10.1080/00207543.2015.1135259
  • Yatsenko, Y., & Hritonenko, N. (2017). Two-cycle optimization in replacement models with non-exponential technological improvement. IMA Journal of Management Mathematics, 28, 359–372.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.