References
- Abdelmaguid , TF , Nassef , AO , Kamal , B and Hassan , MF . 2004 . A hybrid GA/heuristic approach to the simultaneous scheduling of machines and automated guided vehicles . Int. J. Prod. Res. , 42 : 267 – 282 .
- Bilge , U and Tanchoco , JMA . 1997 . AGV systems with multiple-load carriers: basic issues and potential benefits . J. Manufac. Sys. , 16 : 159 – 174 .
- De Koster , R , Le-Anh , T and van der Meer , JR . 2004 . Testing and classifying vehicle dispatching rules in three real world settings . J. Oper. Manag. , 22 : 369 – 386 .
- Dotoli , M and Fanti , MP . 2004 . Coloured timed Petri net model for real-time control of automated guided vehicle systems . Int. J. Prod. Res. , 42 : 4239 – 4260 .
- Egbelu , PJ . 1987 . Pull versus push strategy for automated guided vehicle load movement in a batch manufacturing system . J. Manufac. Sys. , 6 : 209 – 220 .
- Farling , BE , Mosier , CT and Mahmoodi , F . 2001 . Analysis of automated guided vehicle configurations in flexible manufacturing systems . Int. J. Prod. Res. , 39 : 4239 – 4260 .
- Ho , Y and Hsieh , P . 2004 . A machine-to-loop assignment and layout design methodology for tandem AGV systems with multiple-load vehicles . Int. J. Prod. Res. , 42 : 801 – 833 .
- Hoff , EB and Sarker , BR . 1998 . Overview of path design and dispatching methods for automated guided vehicles . Integ. Manu. Sys. , 9 : 296 – 307 .
- Jeong , BH and Randhawa , SU . 2001 . A multi-attribute dispatching rule for automated guided vehicle systems . Int. J. Prod. Res. , 39 : 2817 – 2833 .
- Kelton , WD , Sadowski , RP and Sturrock , DT . 2004 . Simulation with Arena , New York : McGraw-Hill .
- Lee , J , Tangjarukij , M and Zhu , Z . 1996 . Load selection of automated guided vehicles in flexible manufacturing systems . Int. J. Prod. Res. , 34 : 3383 – 3400 .
- Levitin , G and Abezgaouz , R . 2003 . Optimal routing of multiple-load AGV subject to LIFO loading constraints . Comp. Op. Res. , 30 : 397 – 411 .
- Nayyar , P and Khator , KS . 1993 . Operational control of multi-load vehicles in an automated guided vehicle system . Comp. Indus. Eng. , 25 : 503 – 506 .
- Occena , LG and Yokota , T . 1993 . Analysis of the AGV loading capacity in a JIT environment . J. Manufac. Sys. , 12 : 24 – 35 .
- Ozden , M . 1988 . A simulation study of multiple-load-carrying guided vehicles in a flexible manufacturing system . Int. J. Prod. Res. , 26 : 1353 – 1366 .
- Pegden , CD , Shannon , RE and Sadowski , RP . 1995 . Introduction to Simulation Using SIMAN , New York : McGraw-Hill .
- Seifert , RW , Kay , MG and Wilson , JR . 1998 . Evaluation of AGV routing strategies using hierarchical simulation . Int. J. Prod. Res. , 36 : 1961 – 1976 .
- Tanchoco , JMA and Co , CG . 1994 . “ Real-time control strategies for multiple-load AGVs ” . In Material Flow Systems in Manufacturing, chapter 11 , New York : Chapman & Hall .
- Thonemann , UW and Brandeau , ML . 1997 . Designing a zoned automated guided vehicle system with multiple vehicles and multiple load capacity . Op. Res. , 45 : 857 – 873 .
- Veeravalli , B , Rajesh , G and Viswanadham , N . 2002 . Design and analysis of optimal material distribution policies in flexible manufacturing system using a single AGV . Int. J. Prod. Res. , 40 : 2937 – 2955 .
- Yamashita , H . 2001 . Analysis of dispatching rules of AGV systems with multiple vehicles . IIE Trans. , 33 : 889 – 896 .
- Yim , DS and Linn , RJ . 1993 . Push and pull rules for dispatching automated guided vehicles in a flexible manufacturing system . Int. J. Prod. Res. , 31 : 43 – 57 .