573
Views
13
CrossRef citations to date
0
Altmetric
Original Articles

Integrated workforce capacity and inventory management under labour supply uncertainty

, &
Pages 4281-4304 | Received 18 Jan 2007, Accepted 26 Oct 2007, Published online: 15 May 2009

References

  • Alp , O and Tan , T . 2007 . Tactical capacity management under capacity flexibility in make-to-stock systems . IIE Transactions , 40 ( 3 ) : 221 – 237 .
  • Angelus , A and Porteus , EL . 2002 . Simultaneous capacity and production management of short-life-cycle, produce-to-stock goods under stochastic demand . Management Science , 48 ( 3 ) : 399 – 413 .
  • Atamtürk , A and Hochbaum , DS . 2001 . Capacity acquisition, subcontracting, and lot sizing . Management Science , 47 ( 8 ) : 1081 – 1100 .
  • Barnes-Schuster , D , Bassok , Y and Anupindi , R . 2002 . Coordination and flexibility in supply contracts with options . Manufacturing & Service Operations Management , 4 ( 3 ) : 171 – 207 .
  • Beckers , I . 2005 . “ Fewer flexible workers ” . In Web Magazine Available from http://www.cbs.nl/en-gb/menu/themas/arbeid-inkomen-sociale-zekerheid/ arbeidsmarkt/publicaties/artikelen/2005-1616-wm.htm [Accessed 9 March 2006]
  • Cachon , GP . 2003 . Supply chain coordination with contracts , Edited by: de Kok , AG and Graves , SC . Vol. 11 , 229 – 339 . Amsterdam : Elsevier: Handbooks in OR & MS .
  • Ciarallo , FW , Akella , R and Morton , TE . 1994 . A periodic review, production planning model with uncertain capacity and uncertain demand-optimality of extended myopic policies . Management Science , 40 ( 3 ) : 320 – 332 .
  • Dallaert , N and de Kok , T . 2004 . Integrating resource and production decisions in a simple multi-stage assembly system . International Journal of Production Economics , 90 : 281 – 294 .
  • Holt , CC . 1960 . Planning production, inventories and workforce , Englewood Cliffs, NJ : Prentice-Hall .
  • Hu , JQ , Vakili , P and Huang , L . 2004 . Capacity and production management in a single product manufacturing system . Annals of Operations Research , 125 : 191 – 204 .
  • Iida , T . 2002 . A non-stationary periodic review production-inventory model with uncertain production capacity and uncertain demand . European Journal of Operational Research , 140 : 670 – 683 .
  • Kouvelis , P and Milner , JM . 2002 . Supply chain capacity and outsourcing decisions: the dynamic interplay of demand and supply uncertainty . IIE Transactions , 34 : 717 – 728 .
  • Milner , JM and Pinker , EJ . 2001 . Contingent labor contracting under demand and supply uncertainty . Management Science , 47 ( 8 ) : 1046 – 1062 .
  • Mincsovics , G , Tan , T and Alp , O . 2006 . “ Integrated capacity and inventory management with capacity acquisition lead times ” . In Beta Technical Report WP 191. , Technische Universiteit Eindhoven .
  • Pac , MF . 2006 . “ Integrated flexible capacity and inventory management under flexible capacity uncertainty ” . In Thesis (MSc) , Bilkent University .
  • Pinker , EJ and Larson , RC . 2003 . Optimizing the use of contingent labor when demand is uncertain . European Journal of Operational Research , 144 : 39 – 55 .
  • Schmitt , A and Snyder , VL . 2006 . “ Infinite-horizon models for inventory control under yield uncertainty and disruptions ” . In Department of Industrial and Systems Engineering , Lehigh University .
  • Tan , B . 2004 . Subcontracting with availability guarantees: production control and capacity decisions . IIE Transactions , 36 ( 8 ) : 711 – 724 .
  • Tan , B and Gershwin , SB . 2004 . Production and subcontracting strategies for manufacturers with limited capacity and volatile demand . Annals of Operations Research , 125 : 205 – 232 .
  • Tan , T and Alp , O . 2005 . “ An integrated approach to inventory and flexible capacity management subject to fixed costs and non-stationary stochastic demand. OR Spectrum, to appear, DOI: 10.1007/s00291-008-0122-y ” .
  • Turkish Statistical Institute . 2006 . Labour force survey , Available from http://www.turkstat.gov.tr [Accessed 20 June 2006]
  • US Bureau of Labor Statistics . 2006 . Contingent and alternative employment arrangements . Available from http://www.bls.gov/cps [Accessed 10 June 2006]
  • Van Mieghem , JA . 2003 . Capacity management, investment, and hedging: review and recent developments . Manufacturing & Service Operations Management , 5 ( 4 ) : 269 – 302 .
  • Wild , B and Shneeweiss , C . 1993 . Manpower capacity planning–a hierarchical approach . International Journal of Production Economics , 30/31 : 95 – 106 .
  • Yang , J , Qi , X and Xia , Y . 2005 . A production-inventory system with Markovian capacity and outsourcing option . Operations Research , 53 ( 2 ) : 328 – 349 .
  • Yano , CA and Lee , HL . 1995 . Lot sizing with random yields: a review . Operations Research , 42 ( 2 ) : 311 – 334 .

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.