An innovative approach for job pre-allocation to parallel unrelated machines in the case of a batch sequence dependent manufacturing environment

, , , &
Pages 4353-4376 | Received 11 May 2010, Accepted 15 Nov 2010, Published online: 10 Mar 2011

References

  • Akkiraju , R . 2001 . An agent-based approach for scheduling multiple machines . Applied Intelligence , 14 ( 2 ) : 135 – 144 .
  • Allahverdi , A , Gupta , JND and Aldowaisan , T . 1999 . A review of scheduling research involving setup considerations . The International Journal of Management Science , 27 ( 2 ) : 219 – 239 .
  • Allahverdi , A . 2008 . A survey of scheduling problems with setup times or costs . European Journal of Operational Research , 187 ( 3 ) : 985 – 1032 .
  • Arnaout , J-P , Rabadi , G and Mun , JH . 2006 . A dynamic heuristic for the stochastic unrelated parallel machine scheduling problem . International Journal of Operations Research , 3 ( 2 ) : 136 – 143 .
  • Berning , G . 2002 . An integrated system solution for supply chain optimization in the chemical process industry . OR Spectrum , 24 ( 4 ) : 371 – 401 .
  • Celano , G , Costa , A and Fichera , S . 2008 . Scheduling of unrelated parallel manufacturing cells with limited human resources . International Journal of Production Research , 46 ( 2 ) : 405 – 427 .
  • Chang , P-T . 2008 . Ant colony optimization system for a multi-quantitative and qualitative objective job-shop parallel-machine-scheduling problem . International Journal of Production Research , 46 ( 20 ) : 5719 – 5759 .
  • Cheng , TCE , Gupta , JND and Wang , G . 2000 . A review of flowshop scheduling research setup times . Production and Operations Management , 9 ( 3 ) : 262 – 282 .
  • Chuang, M.-C., Liao, C.-J., and Chao, C.-W., 2010. Parallel machine scheduling with preference of machines. International Journal of Production Research, 48(14), 4139–4152.
  • Clark , AR and Clark , SJ . 2000 . Rolling-horizon lot-sizing when setup times are sequence-dependent . International Journal of Production Research , 38 ( 10 ) : 2287 – 2307 .
  • Drexl , A and Kimms , A . 1997 . Lotsizing and scheduling-survey and extensions . European Journal of Operational Research , 99 ( 2 ) : 221 – 235 .
  • Fandel , G and Stammen-Hegene , C . 2006 . Simultaneous lotsizing and scheduling for multi-product multi-level production . International Journal of Production Economics , 104 ( 2 ) : 308 – 316 .
  • Gamberini, R., et al., 2005. A framework for addressing job shop scheduling in a real industrial context. In: 7th international conference on the “modern information technology in the innovation processes of the industrial enterprises” (MITIP), 8–9 September 2005, Genova, Italy.
  • Hu , X , Bao , J-S and Jin , Y . 2010 . Minimising makespan on parallel machines with precedence constraints and machine eligibility restrictions . International Journal of Production Research , 48 ( 6 ) : 1639 – 1651 .
  • Jeong , B , Kim , S-W and Lee , YJ . 2001 . An assembly scheduler for TFT LCD manufacturing . Computers and Industrial Engineering , 41 ( 1 ) : 37 – 58 .
  • Kang , S , Malik , K and Thomas , LJ . 1999 . Lotsizing and scheduling on parallel machines with sequence-dependent setup costs . Management Science , 45 ( 2 ) : 273 – 289 .
  • Karimi , B , Fatemi Ghomi , SMT and Wilson , JM . 2003 . The capacitated lotsizing problem: a review of models and algorithms . Omega , 31 ( 5 ) : 365 – 378 .
  • Kim , D-W . 2002 . Unrelated parallel machine scheduling wit setup times using simulated annealing . Robotics and Computer-Integrated Manufacturing , 18 ( 3 ) : 223 – 231 .
  • Kim , D-W , Na , D-G and Chen , FF . 2003 . Unrelated parallel machines scheduling with setup times and a total weighted tardiness objective . Robotics and Computer-Integrated Manufacturing , 19 ( 1–2 ) : 173 – 181 .
  • Kim , D-W . 2006 . Simulated annealing and genetic algorithm for unrelated parallel machine scheduling considering setup times . International Journal of Computer Applications in Technology , 26 ( 1–2 ) : 28 – 36 .
  • Liaee , MM and Emmons , H . 1997 . Scheduling families of jobs with setup times . International Journal of Production Economics , 51 ( 3 ) : 165 – 176 .
  • Meyr , H . 2002 . Simultaneous lotsizing and scheduling on parallel machines . European Journal of Operational Research , 139 ( 2 ) : 277 – 292 .
  • Monkman , SK , Morrice , DJ and Bard , JF . 2008 . A production scheduling heuristic for an electronics manufacturer with sequence-dependent setup costs . European Journal of Operational Research , 187 ( 3 ) : 1100 – 1114 .
  • Pinto , JM and Grossmann , IE . 1998 . Assignment and sequencing models for the scheduling of process systems . Annals of Operations Research , 81 : 433 – 466 .
  • Potts , CN and Kovalyov , MY . 2000 . Scheduling with batching: a review . European Journal of Operational Research , 120 ( 2 ) : 228 – 249 .
  • Salomon , M . 1991 . Some extensions of the discrete lotsizing and scheduling problem . Management Science , 37 ( 7 ) : 801 – 812 .
  • Yang , WH and Liao , CJ . 1998 . Batching and sequencing of jobs with order availability at a single facility . International Journal of Systems Science , 29 ( 1 ) : 13 – 20 .

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.