529
Views
20
CrossRef citations to date
0
Altmetric
Original Articles

Rescheduling strategies for integrating rush orders with preventive maintenance in a two-machine flow shop

&
Pages 5783-5794 | Received 07 Mar 2011, Accepted 23 Sep 2011, Published online: 14 Dec 2011

References

  • Aghezzaf , EH and Najid , NM . 2008 . Integrated production planning and preventive maintenance in deteriorating production systems . Information Sciences , 178 ( 17 ) : 3382 – 3392 .
  • Baraz , D and Mosheivo , G . 2008 . A note on a greedy heuristic for flow-shop makespan minimization with no machine with no machine idle-time . European Journal of Operational Research , 184 ( 2 ) : 810 – 813 .
  • Cassady , RC and Kutanoglu , E . 2005 . Integrating preventive maintenance planning and production scheduling for a single machine . IEEE Transactions on Reliability , 54 ( 2 ) : 304 – 309 .
  • Cheng , CY and Chen , MC . 2003 . The periodic preventive maintenance policy for deteriorating system by using improvement factor model . International Journal of Applied Science and Engineering , 1 ( 2 ) : 114 – 122 .
  • Church , LK and Uzsoy , R . 1992 . Analysis of periodic and event-driven rescheduling policies in dynamic shops . International Journal of Computer Integrated Manufacturing , 5 ( 3 ) : 153 – 163 .
  • Hu , YJ , Yan , F and Yu , J . 2005 . Flow shop rescheduling problem under rush orders . Journal of Zhejiang University SCIENCE , 6A ( 10 ) : 1040 – 1046 .
  • Li , H . 2000 . A production rescheduling expert simulation system . European Journal of Operational Research , 124 ( 2 ) : 283 – 293 .
  • Masuchun , R and Ferrell , WG . 2004 . Dynamic rescheduling with stability . In: Proceedings of the 5th Asian control conference . 20–23 July 2004 , Melbourne . Australia
  • Najid , NM , Alaoui-Selsouli , M and Mohafid , A . 2011 . An integrated production and maintenance planning model with time windows and shortage cost . International Journal of Production Research , 49 ( 8 ) : 2165 – 2283 .
  • Pongpech , J and Murthy , DNP . 2006 . Optimal periodic preventive maintenance policy for leased equipment . Reliability Engineering and System Safety , 91 ( 7 ) : 772 – 777 .
  • Rajendran , C and Ziegler , H . 1997 . An efficient heuristic for scheduling in a flow shop to minimize total weighted flow time of jobs . European Journal of Operational Research , 103 ( 1 ) : 129 – 138 .
  • Ruiz , R , García-Díaz , JC and Maroto , C . 2007 . Considering scheduling and preventive maintenance in the flow-shop sequencing problem . Computers & Operations Research , 34 ( 11 ) : 3314 – 3330 .
  • Sanmarti , E , Espuna , A and Puigjaner , L . 1997 . Batch production and preventive maintenance scheduling under equipment failure uncertainty . Computers & Chemical Engineering , 21 ( 10 ) : 1157 – 1168 .
  • Sortrakul , N , Nachtmann , HL and Cassady , CR . 2005 . Genetic algorithms for integrated preventive maintenance planning and production scheduling for a single machine . Computers in Industry , 56 ( 2 ) : 161 – 168 .
  • van Foreest , ND , Wijngaard , J and van der Vaart , T . 2010 . Scheduling and order acceptance for the customized stochastic lot scheduling problem . International Journal of Production Research , 48 ( 12 ) : 3561 – 3578 .
  • Vieira , GE , Herrmann , JW and Lin , E . 2003 . Rescheduling manufacturing systems: a framework of strategies, policies and methods . Journal of Scheduling , 6 ( 1 ) : 39 – 62 .
  • Wang , WP and Chen , Z . 2007 . A neuro-fuzzy based forecasting approach for rush order control applications . Expert Systems with Applications , 35 ( 1/2 ) : 223 – 234 .
  • Wu , MC and Chen , SY . 1996 . A cost model for justifying the acceptance of rush orders . International Journal of Production Research , 34 ( 7 ) : 1963 – 1974 .
  • Wu , SD , Storer , RH and Chang , P-C . 1993 . One machine rescheduling heuristics with efficiency and stability as criteria . Computer Operation Research , 20 ( 1 ) : 1 – 14 .
  • Yang , DL , Hsu , CJ and Kuo , WH . 2008 . A two-machine flow shop scheduling problem with a separated maintenance constraint . Computers & Operations Research , 35 ( 3 ) : 876 – 883 .
  • Zhang , Q and Rao , YQ . 2003 . Study on dynamic scheduling method for job shop . Mechanical Manufacturing , 6 ( 10 ) : 39 – 41 .
  • Zhou , BH . 2007 . Integrated production and preventive maintenance scheduling algorithm for flow shops . Journal of Dalian Maritime University , 33 ( 3 ) : 32 – 35 .

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.