References
- Arinez, J., et al. 2010. “Quantity/quality improvement in an automotive paint shop: A case study.” IEEE Transactions on Automation Science and Engineering 7(4): 755–761.
- Buzacott, J. A. 1967. “Automatic transfer lines with buffer stocks.” International Journal of Production Research 5(3): 183–200.
- Buzacott, J. A., and J. G. Shantikumar. 1993. Stochastic models of manufacturing systems. Engelwood Cliffs, NJ: Prentice Hall.
- Chiang, S.-Y., C.-T. Kuo, and S. M. Meerkov. 2000a. “DT-bottlenecks in serial production lines: Theory and application.” IEEE Transactions on Robotics and Automation 16(5): 567–580.
- Chiang, S.-Y., et al. 2000b. “Improvability of assembly systems II: Improvability indicators and case study.” Mathematical Problems in Engineering 6: 359–393.
- Chiang, S.-Y., C.-T. Kuo, and S. M. Meerkov. 2001. “C-Bottlenecks in serial production lines: Identification and application.” Mathematical Problems in Engineering 7: 543–578.
- Dallery, Y., R. David, and X.-L. Xie. 1988. “An efficient algorithm for analysis of transfer lines with unreliable machines and finite buffers.” IIE Transactions 20(3): 280–283.
- Dallery, Y., and S. B. Gershwin. 1992. “Manufacturing flow line systems: A review of models and analytical results.” Queuing Systems 12(1/2): 3–94.
- Dolgui, A., et al. 2006. “MIP approach to balancing transfer lines with blocks of parallel operations.” IIE Transactions 38(10): 869–882.
- Dolgui, A., A. V. Eremeev, and V. S. Sigaev. 2007. “HBBA: Hybrid algorithm for buffer allocation in tandem production lines.” Journal of Intelligent Manufacturing 18(3): 411–420.
- Dolgui, A., and I. Ihnatsenka. 2009. “Branch and bound algorithm for a transfer line design problem: Stations with sequentially activated multi-spindle heads.” European Journal of Operational Research 197(3): 1119–1132.
- Gershwin, S. B. 1987. “An efficient decomposition method for the approximate evaluation of tandem queues with finite storage space and blocking.” Operations Research 35(2): 291–305.
- Gershwin, S. B. 1994. Manufacturing systems engineering. Engelwood Cliffs, NJ: PTR Prentice Hall.
- Gershwin, S. B., and J. E. Shore. 2000. “Efficient algorithms for buffer space allocation.” Annals of Operations Research 93(1–4): 117–144.
- Kuo, C.-T., J.-T. Lim, and S. M. Meerkov. 1996. “Bottlenecks in serial production lines: A system-theoretic approach.” Mathematical Problems in Engineering 2: 233–276.
- Li, J. 2004. “Throughput analysis in automotive paint shops: A case study.” IEEE Transactions on Automation Sciences and Engineering 1(1): 90–98.
- Li, J., and S. M. Meerkov. 2001. “Customer demand satisfaction in production systems: A due-time performance approach.” IEEE Transactions on Robotics and Automation 17(4): 472–482.
- Li, J., and N. Huang. 2005. “Modeling and analysis of a multiple product manufacturing system with split and merge.” International Journal of Production Research 43(19): 4049–4066.
- Li, J., and D. E. Blumenfeld. 2006. “Quantitative analysis of a transfer production line with Andon.” IIE Transactions 38(10): 837–846.
- Li, J., and S. M. Meerkov. 2009. Production systems engineering. New York: Springer.
- Li, J., D. E. Blumenfeld, and S. P. Marin. 2007. “Manufacturing system design to improve quality buy rate: An automotive paint shop application study.” IEEE Transactions on Automation Science and Engineering 4(1): 75–79.
- Li, J., D. E. Blumenfeld, and S. P. Marin. 2008. “Production system design for quality robustness.” IIE Transactions 40(3): 162–176.
- Li, J., D. E. Blumenfeld, N. Huang, and J. M. Alden. 2009. “Throughput Analysis of Production Systems: Recent Advances and Future Topics.” International Journal of Production Research 47 (14): 3823–3851.
- Li, J., S. M. Meerkov, and L. Zhang. 2013. Production systems engineering for factory floor management. Forthcoming.
- Liker, J. K. 2004. The Toyota way: 14 management principles from the world's greatest manufacturer. New York: McGraw-Hill.
- Lim, J.-T., S. M. Meerkov, and F. Top. 1990. “Homogeneous asymptotically reliable serial production lines: Theory and a case study.” IEEE Transactions on Automatic Control 35(5): 524–534.
- Monden, Y. 1997. Toyota production system: An integrated approach to just-in-time. 3rd ed. Norcross, GA: Engineering & Management Press.
- Papadopoulos, H. T., C. Heavey, and J. Browne. 1993. Queueing theory in manufacturing systems analysis and design. London: Chapman & Hall.
- Papadopoulos, H. T., and C. Heavey. 1996. “Queueing theory in manufacturing systems analysis and design: A classification of models for production and transfer lines.” European Journal of Operational Research 92(1): 1–27.
- Sawik, T. J. 1993. “A scheduling algorithm for flexible flow lines with limited intermediate buffers.” Applied Stochastic Models and Data Analysis 9(2): 127–138.
- Tiwari, M. K., J. Antony, and D. C. Montgomery. 2008. “Editorial note for the special issue on ‘Effective decision support to implement lean and six sigma methodologies in the manufacturing and service sectors’.” International Journal of Production Research 46(23): 6563–6566.
- Viswanadham, N., and Y. Narahari. 1992. Performance modeling of automated manufacturing system. Englewood Cliffs, NJ: Prentice Hall.
- Wang, C., and J. Li. 2010. “Approximate analysis of re-entrant lines with Bernoulli reliability models.” IEEE Transactions on Automation Science and Engineering 7(3): 708–715.
- Wang, J., Y. Hu, and J. Li. 2010. “Transient analysis to design buffer capacity in dairy filling and packing production lines.” Journal of Food Engineering 98(1): 1–12.
- Wang, J., et al. 2012. “Indicators for quality improvability and bottleneck sequence in flexible manufacturing systems with batch productions.” International Journal of Production Research 50(22): 6388–6402.
- Xie, X., and J. Li. 2012. “Modeling, analysis and continuous improvement of food production systems: A case study at a meat shaving and packaging line.” Journal of Food Engineering 113(2): 344–350.