References
- Atkins, D. R., and P. O. Iyogun. 1988. “Periodic Versus ‘Can-order’ Policies for Coordinated Multi-Item Inventory Systems.” Management Science 34(6): 791–796.
- Balintfy, J. L. 1964. “On a Basic Class of Multi-Item Inventory Problems.” Management Science 10(2): 287–297.
- Bartholdi III, J. J., and D. D. Eisenstein. 1996. “A Production Line that Balances Itself.” Operations Research 44(1): 21–34.
- Buxey, G. 2005. “Aggregate Planning for Seasonal Demand: Reconciling Theory with Practice.” International Journal of Operations & Production Management 25(11): 1083–1100.
- Buzacott, J. A. 1967. “Automatic Transfer Lines with Buffer Stocks.” International Journal of Production Research 5(3): 183–200.
- Buzacott, J. A. 1971. “The Role of Inventory Banks in Flow-Line Production Systems.” International Journal of Production Research 9(4): 425–436.
- Buzacott, J. A. 1976. “The Production Capacity of Job Shops with Limited Storage Space.” International Journal of Production Research 14(5): 579–605.
- Buzacott, J. A. 1990. “Abandoning the Moving Assembly Line: Models of Human Operators and Job Sequencing.” International Journal of Production Research 28(5): 821–839.
- Buzacott, J. A. 1999. “Dynamic Inventory Targets Revisited.” Journal of the Operational Research Society 50(7): 697–703.
- Buzacott, J. A. 2002. “The Impact of Worker Differences on Production System Output.” International Journal of Production Economics 78(1): 37–44.
- Buzacott, J. A. 2004. “Modelling Teams and Workgroups in Manufacturing.” Annals of Operations Research 126(1–4): 215–230.
- Buzacott, J. A., and J. G. Shanthikumar. 1980. “Models for Understanding Flexible Manufacturing Systems.” AIIE Transactions 12(4): 339–349.
- Buzacott, J. A., and J. G. Shanthikumar. 1992. “A General Approach for Coordinating Production in Multiple-Cell Manufacturing Systems.” Production & Operations Management 1(1): 34–52.
- Chaouch, A. B., and J. A. Buzacott. 1994. “The Effect of Lead Time on Plant Timing and Size.” Productions and Operations Management 3(1): 38–54.
- Chen, Y. F., J. K. Ryan, and D. Simchi-Levi. 2000. “The Impact of Exponential Smoothing Forecasts on the Bullwhip Effect.” Naval Research Logistics 47(4): 269–286.
- Chen, Y. F., et al. 2000. “Quantifying the Bullwhip Effect in a Simple Supply Chain: The Impact of Forecasting, Lead Times and Information.” Management Science 46(3): 436–443.
- Christiansen, M., K. Fagerholt, and D. Ronen. 2004. “Ship Routing and Scheduling: Status and Perspectives.” Transportation Science 38(1): 1–18.
- Conway, R. W., W. L. Maxwell, and L. W. Miller. 1967. Theory of Scheduling. Boston: Addison-Wesley.
- Elmaleh, J., and S. Eilon. 1974. “A New Approach to Production Smoothing.” International Journal of Production Research 12(6): 673–681.
- Gardner, D. T., and J. A. Buzacott. 1999. “Hedging Against Uncertainty in New Technology Development: The Case of Direct Steelmaking.” IEEE Transactions in Engineering Management 46(2): 177–189.
- Hunter, J. E., F. L. Schmidt, and M. K. Judiesch. 1990. “Individual Differences in Output Variability as a Function of Job Complexity.” Journal of Applied Psychology 75(1): 28–42.
- Kimura, O., and H. Terada. 1981. “Design and Analysis of Pull System, a Method of Multi-Stage Production Control.” International Journal of Production Research 19(3): 241–253.
- McKay, K. N., Safayeni, F. R., and Buzacott, J. A., 1995a. “‘Common Sense’ Realities of Planning and Scheduling in Printed Circuit Board Production.” International Journal of Production Research, 33 (6): 1587–1603.
- McKay, K. N., F. R. Safayeni, and J. A. Buzacott. 1995b. “A Review of Hierarchical Production Planning and Its Applicability for Modern Manufacturing.” Production Planning and Control 6(5): 384–394.
- Murrell, K. F. H. 1962. “Operator Variability and its Industrial Consequences.” International Journal of Production Research 1(3): 39–55.
- Orlicky, J. A. 1975. Material Requirements Planning. New York: McGraw-Hill.
- Orr, D. 1962. “A Random Walk Production-Inventory Policy: Rationale and Implementation.” Management Science 9(1): 108–122.
- Pil, F. K., and T. Fujimoto. 2007. “Lean and Reflective Production: The Dynamic Nature of Production Models.” International Journal of Production Research 45(16): 3741–3761.
- Ronen, D. 2002. “Marine Inventory Routing: Shipments Planning.” Journal of the Operational Research Society 53(1): 108–114.
- Rosengren, L.-G. 1981. “Potential Performance of Dock Versus Line Assembly.” International Journal of Production Research 19(2): 139–152.
- Silver, E. A. 1974. “A Control System for Coordinated Inventory Replenishment.” International Journal of Production Research 12(6): 647–671.
- Silver, E. A., D. F. Pyke, and R. Peterson. 1998. Inventory Management and Production Planning and Scheduling. New York: Wiley.
- Tabe, T., R. Muramatsu, and Y. Tanaka. 1980. “Analysis of Production Ordering Quantities and Inventory Variations in a Multi-Stage Production Ordering System.” International Journal of Production Research 18(2): 245–257.