1,228
Views
30
CrossRef citations to date
0
Altmetric
Articles

A job shop scheduling problem with human operators in handicraft production

, &
Pages 3820-3831 | Received 25 Jan 2013, Accepted 19 Jul 2013, Published online: 20 Sep 2013

References

  • Adams, J., E. Balas, and D. Zawack. 1988. “The Shifting Bottleneck Procedure for Job Shop Scheduling.” Management Science 34 (3): 391–401.
  • Agnetis, A., M. Flamini, G. Nicosia, and A. Pacifici. 2010. “A Job-shop Problem with One Additional Resource Type.” Journal of Scheduling 14 (3): 225–237.
  • Artigues, C., M. Gendreau, L. M. Rousseau, and A. Vergnaud. 2009. “Solving an Integrated Employee Timetabling and Job-shop Scheduling Problem via Hybrid Branch-and-bound.” Computers & Operations Research 36 (8): 2330–2340.
  • Baki, M. F., and R. G. Vickson. 2004. “One-operator, Two-machine Open Shop and Flow Shop Problems with Setup Times for Machines and Weighted Number of Tardy Jobs Objective.” Optimization Methods and Software 19 (2): 1–24.
  • Baybars, I. 1986. “A Survey of Exact Algorithms for the Simple Assembly Line Balancing Problem.” Management Science 32 (8): 909–932.
  • Caniato, F., M. Caridi, C. M. Castelli, and R. Golini. 2009. “A Contingency Approach for SC Strategy in the Italian Luxury Industry: Do Consolidated Models Fit?” International Journal of Production Economics 120 (1): 176–189.
  • Caniato, F., M. Caridi, C. M. Castelli, and R. Golini. 2011. “Supply Chain Management in the Luxury Industry: A First Classification of Companies and their Strategies.” International Journal of Production Economics 133 (2): 622–633.
  • Djelic, M. L., and A. Ainamo. 1999. “The Coevolution of New Organizational Forms in the Fashion Industry: A Historical and Comparative Study of France, Italy, and the United States.” Organization Science 10 (5): 622–637.
  • Driebel, R., and L. Mönch. 2012. “An Integrated Scheduling and Material-handling Approach for Complex Job Shops: A Computational Study.” International Journal of Production Research 50 (20): 37–41.
  • Glass, C. A., Y. M. Shafransky, and V. A. Strusevich. 2000. “Scheduling for Parallel Dedicated Machines with a Single Server.” Naval Research Logistics 47 (4): 304–328.
  • Graham, R. L., and E. L. Lawler. 1979. “Optimization and Approximation in Deterministic Sequencing and Scheduling: A Survey.” Annals of Discrete Mathematics 5: 287–326.
  • Guyon, O., P. Lemaire, É. Pinson, and D. Rivreau. 2010. “Cut Generation for an Integrated Employee Timetabling and Production Scheduling Problem.” European Journal of Operational Research 201 (2): 557–567.
  • Guyon, O., P. Lemaire, É. Pinson, and D. Rivreau. 2012. “Solving an Integrated Job-shop Problem with Human Resource Constraints.” Annals of Operations Research May: 1–25.
  • Hall, N. G., C. N. Potts, and C. Sriskandarajah. 2000. “Parallel Machine Scheduling with a Common Server.” Discrete Applied Mathematics 102 (3): 223–243.
  • Kellerer, H., and V. A. Strusevich. 2003. “Scheduling Parallel Dedicated Machines Under a Single Non-shared Resource.” European Journal of Operational Research 147 (2): 345–364.
  • Mencía, R., M. Sierra, C. Mencía, and R. Varela. 2011. “Genetic Algorithm for Job-shop Scheduling with Operators.” In New Challenges on Bioinspired Applications, Volume 6687 of Lecture Notes in Computer Science, edited by J. Ferrández, J. A. Sánchez, F. de la Paz and F. Toledo, 305–314. Berlin: Springer.
  • Ovacik, I. M., and R. Uzsoy. 1997. Decomposition Methods for Complex Factory Scheduling Problems. Dordrecht: Kluwer Academic.
  • Ruiz-Torres, A. J., J. H. Ablanedo-Rosas, and L. D. Otero. 2012. “Scheduling with Multiple Tasks per Job – The Case of Quality Control Laboratories in the Pharmaceutical Industry.” International Journal of Production Research 50 (3): 37–41.
  • Sierra, M., C. Mencía, and R. Varela. 2011. “Optimally Scheduling a Job-shop with Operators and Total Flow Time Minimization.” In Proceedings of the 14th International Conference on Advances in Artificial Intelligence: Spanish Association for Artificial Intelligence, 193–202, CAEPIA’11, Berlin: Springer-Verlag.
  • Wu, J. Z., X. C. Hao, C. F. Chien, and M. Gen. 2011. “A Novel Bi-vector Encoding Genetic Algorithm for the Simultaneous Multiple Resources Scheduling Problem.” Journal of Intelligent Manufacturing 23 (6): 2255–2270.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.