1,698
Views
44
CrossRef citations to date
0
Altmetric
Articles

Pricing and production planning for reverse supply chain: a review

&
Pages 6972-6989 | Received 13 Nov 2012, Accepted 12 Aug 2013, Published online: 02 Oct 2013

References

  • Akçalı, E., and S. Çetinkaya. 2011. “Quantitative Models for Inventory and Production Planning in Closed-loop Supply Chains.” International Journal of Production Research 49(8): 2373–2407.
  • Atasu, A., M. Sarvary, and L. N. Wassenhove. 2008. “Remanufacturing As a Marketing Strategy.” Management Science 54(10): 1731–1746.
  • Atasu, A., and G. C. Souza. 2013. “How Does Product Recovery Affect Quality Choice?.” Production and Operations Management 22(4): 991–1010.
  • Azar, J., V. Berko-Boateng, P. Calkins, E. deJong, J. George, and H. Hilbert. “Agent of Change: Xerox Design-for-environment Program.” In Electronics and the Environment, 1995. ISEE., Proceedings of the 1995 IEEE International Symposium on, 51–61.
  • Bass, F. M. 1969. “A New Product Growth Model for Consumer Durables.” Management Science 15(5): 215–227.
  • Benedito, Ernest, and Albert Corominas. 2013. “Optimal Manufacturing Policy in a Reverse Logistic System with Dependent Stochastic Returns and Limited Capacities.” International Journal of Production Research 51(1): 189–201.
  • Benoit, J. P., and V. Krishna. 1987. “Dynamic Duopoly: Prices And Quantities.” The Review of Economic Studies 54(1): 23–35.
  • Bitran, G. R., and R. Caldentey. 2003. “An Overview of Pricing Models For Revenue Management.” Manufacturing & Service Operations Management 5(3): 203–229.
  • Boothroyd, G., and L. Alting. 1992. “Design for Assembly And Disassembly.” CIRP Annals-Manufacturing Technology 41(2): 625–636.
  • Boothroyd, G., and P. Dewhurst. 1987. Product Design for Assembly Handbook. Wakefield, RI: Boothroyd Dewhurst.
  • Bostel, N., P. Dejax, and Z. Lu. 2005. “The Design, Planning, and Optimization of Rreverse Logistics Networks.” In Logistics Systems: Design and Optimization, edited by A. Langevin and D. Riope, 171–212. New York: Springer.
  • Bras, B., and R. Hammond. 1996. “Towards Design for Remanufacturing–metrics for Assessing Remanufacturability.” In Proceedings of the 1st International Workshop on Reuse, 11–13. Netherlands: Eindhoven.
  • Bras, B., and M. W. McIntosh. 1999. “Product, Process, And Organizational Design for Remanufacture – An Overview of Research.” Robotics and Computer-Integrated Manufacturing 15(3): 167–178.
  • Bureau of Economic Analysis, US Government, 2012. “Value Added by Sector as a Percentage of GDP.” Accessed Septemeber 2012. http://www.bea.gov/iTable/index_industry.cfm/
  • Canon., 2012. “Business Copier Remanufacturing Program.” Accessed Septemeber 2012. http://www.usa.canon.com/cusa/about_canon/community_environment/environmental_commitment/environmentally_conscious_programs/business_copier_remanufacturing_program/
  • Carless, J., 2008. “Remanufacturing and Recycling Programs are Good for Business, Good for the Environment.” Accessed Septemeber 2012. https://learningnetwork.cisco.com/docs/DOC-1976.
  • Chen, J. M., and C. I. Chang. 2011. “The Economics of a Closed-loop Supply Chain With Remanufacturing.” Journal of the Operational Research Society 63(10): 1323–1335.
  • Clegg, A. J., and D. J. Williams. 1994. “The Strategic and Competitive Implications of Recycling and Design for Disassembly in the Electronics Industry.” In Proc 1994 IEEE Int Symp on Electronics and the Environment, 6–12. San Francisco, CA.
  • Clegg, A. J., D. J. Williams, and R. Uzsoy. 1995. “Production Planning for Companies With Remanufacturing Capability.” In Proceedings of the 1995 IEEE International Symposium on Electronics and the Environment, 186–191.
  • Das, K. 2012. “Integrating Reverse Logistics into the Strategic Planning of a Supply Chain.” International Journal of Production Research 50(5): 1438–1456.
  • Debo, L. G., L. B. Toktay, and L. N. Van Wassenhove. 2005. “Market Segmentation and Product Technology Selection for Remanufacturable Products.” Management Science 51 (8): 1193–1205.
  • Debo, L. G., L. B. Toktay, and L. N. Van Wassenhove. 2006. “Joint Life-cycle Dynamics of new and Remanufactured Products.” Production and Operations Management 15 (4): 498–513.
  • Denizel, M., M. E. Ferguson, and G. C. Souza. 2010. “Multiperiod Remanufacturing Planning with Uncertain Quality of Inputs.” IEEE Transactions on Engineering Management 57(3): 394–404.
  • DePuy, G. W., J. S. Usher, R. L. Walker, and G. D. Taylor. 2007. “Production Planning for Remanufactured Products.” Production Planning and Control 18(7): 573–583.
  • Dolgui, A., and J. M. Proth. 2010. “Pricing Strategies and Models.” Annual Reviews in Control 34(1): 101–110.
  • European Union. 2011a. “End of Life Vehicle.” Accessed Septemeber 2012a. http://ec.europa.eu/environment/waste/elv_index.htm
  • European Union. 2011b. “Waste Electrical and Electronic Equipment.” Accessed September 2012. http://ec.europa.eu/environment/waste/weee/legis_en.htm
  • Ferguson, M. E., and L. B. Toktay. 2006. “The Effect of Competition on Recovery Strategies.” Production and Operations Management 15(3): 351–368.
  • Ferrer, G. 1996. Market Segmentation and Product Line Design in Remanufacturing. Fontainebleau: INSEAD.
  • Ferrer, G., and J. M. Swaminathan. 2006. “Managing New and Remanufactured Products.” Management Science 52(1): 15–26.
  • Ferrer, G., and J. M. Swaminathan. 2010. “Managing New and Differentiated Remanufactured Products.” European Journal of Operational Research 203(2): 370–379.
  • Ferrer, G., and D. Whybark. 2001. “Material Planning for a Remanufacturing Facility.” Production and Operations Management 10(2): 112–124.
  • Fleischmann, M. 2001. Reverse Logistics Network Structures and Design. ERIM Report Series Reference No. ERS-2001-52-LIS.
  • Fleischmann, M., H. R. Krikke, R. Dekker, and S. D. P. Flapper. 2000. “A Characterisation of Logistics Networks for Product Recovery.” Omega 28(6): 653–666.
  • Fleischmann, M., J. A. E. E. Nunen, and B. Gräve. 2003. “Integrating Closed-loop Supply Chains and Spare-parts Management at IBM.” Interfaces 33(6): 44–56.
  • Flood, M. M. 1956. “The Traveling-salesman Problem.” Operations Research 4(1): 61–75.
  • Ford. 2012. “Remanufactured Gas Engine Assemblies.” Accessed Septemeber 2012. http://www.fordparts.com/products/powertrainproducts-remanufacturedgasengineassemblies.aspx.
  • Galbreth, M. R., and J. D. Blackburn. 2006. “Optimal Acquisition and Sorting Policies for Remanufacturing.” Production and Operations Management 15(3): 384–392.
  • Geyer, R., L. N. Wassenhove, and A. Atasu. 2007. “The Economics of Remanufacturing Under Limited Component Durability and Finite Product Life Cycles.” Management Science 53(1): 88.
  • Giutini, R., and K. Gaudette. 2003. “Remanufacturing: The Next Great Opportunity for Boosting us Productivity.” Business Horizons 46(6): 41–48.
  • Golany, B., J. Yang, and G. Yu. 2001. “Economic Lot-sizing with Remanufacturing Options.” IIE Transactions 33(11): 995–1003.
  • González-Ramírez, R. G., N. R. Smith, and R. G. Askin. 2011. “A Heuristic Approach for a Multi-product Capacitated Lot-sizing Problem with Pricing.” International Journal of Production Research 49(4): 1173–1196.
  • Guide Jr, V. D. R. 2000. “Production Planning and Control for Remanufacturing: Industry Practice and Research Needs.” Journal of Operations Management 18(4): 467–483.
  • Guide Jr, V. D. R., and V. Jayaraman. 2000. “Product Acquisition Management: Current Industry Practice and a Proposed Framework.” International Journal of Production Research 38(16): 3779–3800.
  • Guide Jr, V. D. R., V. Jayaraman, and R. Srivastava. 1999. “Production Planning and Control for Remanufacturing: A State-of-the-art Survey.” Robotics and Computer-Integrated Manufacturing 15(3): 221–230.
  • Guide Jr, V. D. R., G. C. Souza, and E. Laan. 2005. “Performance of Static Priority Rules for Shared Facilities in a Remanufacturing Shop With Disassembly and Reassembly.” European Journal of Operational Research 164(2): 341–353.
  • Guide Jr, V. D. R., and R. Srivastava. 1998. “Inventory Buffers in Recoverable Manufacturing.” Journal of Operations Management 16(5): 551–568.
  • Guide Jr, V. D. R., R. H. Teunter, and L. N. Wassenhove. 2003. “Matching Demand and Supply to Maximize Profits From Remanufacturing.” Manufacturing & Service Operations Management 5(4): 303–316.
  • Güngör, A., and S. M. Gupta. 2001. “Disassembly Sequence Plan Generation Using a Branch-and-bound Algorithm.” International Journal of Production Research 39(3): 481–509.
  • Han, S. H., M. Y. Dong, S. X. Lu, S. C. H. Leung, and M. K. Lim. 2012. “Production Planning for Hybrid Remanufacturing and Manufacturing System with Component Recovery. ” Journal of the Operational Research Society. http://dx.doi.org/10.1057/jors.2012.106
  • Ijomah, W. L., C. A. McMahon, G. P. Hammond, and S. T. Newman. 2007. “Development of Robust Design-for-Remanufacturing Guidelines to Further the Aims of Sustainable Development.” International Journal of Production Research 45 (18–19): 4513–4536.
  • Ilgin, M. A., and S. M. Gupta. 2010. “Environmentally Conscious Manufacturing and Product Recovery (Ecmpro): A Review of the State of the Art.” Journal of Environmental Management 91(3): 563–591.
  • Inderfurth, K., A. G. Kok, and S. D. P. Flapper. 2001. “Product Recovery in Stochastic Remanufacturing Systems with Multiple Reuse Options.” European Journal of Operational Research 133(1): 130–152.
  • Ishii, K., C. F. Eubanks, and P. Marco. 1994. “Design for Product Retirement and Material Life-cycle.” Materials & Design 15(4): 225–233.
  • Jayaraman, V. 2006. “Production Planning for Closed-loop Supply Chains With Product Recovery and Reuse: An Analytical Approach.” International Journal of Production Research 44(5): 981–998.
  • Jayaraman, V., V. D. R. Guide Jr, and R. Srivastava. 1999. “A Closed-loop Logistics Model for Remanufacturing.” Journal of the Operational Research Society 50 (5): 497–508.
  • Junior, M. L., and M. G. Filho. 2012. “Production Planning and Control for Remanufacturing: Literature Review and Analysis.” Production Planning & Control 23(6): 419–435.
  • Kelle, P., and E. A. Silver. 1989. “Forecasting the Returns of Reusable Containers.” Journal of Operations Management 8(1): 17–35.
  • Kim, H. J., D. H. Lee, and P. Xirouchakis. 2007. “Disassembly Scheduling: Literature Review and Future Research Directions.” International Journal of Production Research 45(18–19): 4465–4484.
  • Kim, T., and S. K. Goyal. 2011. “Determination of the Optimal Production Policy and Product Recovery Policy: The Impacts of Sales Margin of Recovered Product.” International Journal of Production Research 49(9): 2535–2550.
  • Krikke, H. R., A. Harten, and P. C. Schuur. 1998. “On a Medium Term Product Recovery and Disposal Strategy for Durable Assembly Products.” International Journal of Production Research 36(1): 111–140.
  • Krupp, J. A. G. 1992. “Core Obsolescence Forecasting in Remanufacturing.” Production and Inventory Management Journal 33(2): 12–17.
  • Kumar, S., and S. Craig. 2007. “Dell, Inc.’s Closed Loop Supply Chain for Computer Assembly Plants.” Information, Knowledge, Systems Management 6(3): 197–214.
  • Kumar, V., P. S. Shirodkar, J. A. Camelio, and J. W. Sutherland. 2007. “Value Flow Characterization During Product Lifecycle to Assist in Recovery Decisions.” International Journal of Production Research 45(18–19): 4555–4572.
  • Kwak, M. J., and H. M. Kim. 2011. “Assessing Product Family Design From an End-of-life Perspective.” Engineering Optimization 43(3): 233–255.
  • Lambert, A. J. D. 1997. “Optimal Disassembly of Complex Products.” International Journal of Production Research 35(9): 2509–2524.
  • Lambert, A. J. D. 2003. “Disassembly Sequencing: A Survey.” International Journal of Production Research 41(16): 3721–3759.
  • Lambert, A. J. D., and S. M. Gupta. 2005. Disassembly Modeling for Assembly, Maintenance, Reuse, and Recycling. Boca Raton, FL: CRC Press.
  • Lehr, Christian B., Jörn-Henrik Thun, and Peter M. Milling. 2013. “From Waste to Value-a System Dynamics Model for Trategic Decision-making in Closed-loop Supply Chains.” International Journal of Production Research 51(13): 4105–4116.
  • Levin, Y., J. McGill, and M. Nediak. 2009. “Dynamic Pricing in the Presence of Strategic Consumers and Oligopolistic Competition.” Management Science 55(1): 32–46.
  • Li, Chong. 2013. “An Integrated Approach to Evaluating the Production System in Closed-loop Supply Chains.” International Journal of Production Research 51(13): 4045–4069.
  • Listeş, O. 2007. “A Generic Stochastic Model for Supply-and-Return Network Design.” Computers & Operations Research 34(2): 417–442.
  • Lund, R. T. 1996. The Remanufacturing Industry: Hidden Giant. Boston, MA: Boston University.
  • Lund, R. T., and W. M. Hauser. 2010. “Remanufacturing – An American Perspective.” In 5th International Conference on Responsive Manufacturing-Green Manufacturing. 1–6,
  • Maglaras, C., and J. Meissner. 2006. “Dynamic Pricing Strategies for Multiproduct Revenue Management Problems.” Manufacturing & Service Operations Management 8(2): 136–148.
  • Majumder, P., and H. Groenevelt. 2001. “Competition in Remanufacturing.” Production and Operations Management 10(2): 125–141.
  • Mangun, D., and D. L. Thurston. 2002. “Incorporating Component Reuse, Remanufacture, and Recycle into Product Portfolio Design.” IEEE Transactions on Engineering Management 49(4): 479–490.
  • Maples, G. E., R. B. Heady, and Z. Zhu. 2005. “Parts Remanufacturing in the Oilfield Industry.” Industrial Management & Data Systems 105(8): 1070–1083.
  • McGovern, S. M., and S. M. Gupta. 2007. “Combinatorial Optimization Analysis of the Unary NP-complete Disassembly Line Balancing Problem.” International Journal of Production Research 45(18–19): 4485–4511.
  • McGovern, S. M., and S. M. Gupta. 2011. The Disassembly Line: Balancing and Modeling. New York: McGraw-Hill.
  • Mercedes-Benz. 2012. Genuine Mercedes-Benz Remanufactured Parts. Accessed September 2012. http://www.mbusa.com/mercedes/service_and_parts/remanufacturedparts.
  • Minner, S., and R. Kleber. 2001. “Optimal Control of Production and Remanufacturing in a Simple Recovery Model with Linear Cost Functions.” OR Spectrum 23(1): 3–24.
  • Moorthy, K. S. 1984. “Market Segmentation, Self-selection, and Product Line Design.” Marketing Science 3(4): 288–307.
  • Moorthy, K. S., and I. P. L. Png. 1992. “Market Segmentation, Cannibalization, and the Timing of Product Introductions.” Management Science 38(3): 345–359.
  • Moyer, L., and M. G. Surendra. 1997. “Environmental Concerns and Recycling/Disassembly Efforts in the Electronics Industry.” Journal of Electronics Manufacturing 7(1): 1–22.
  • Murayama, T., M. Yoda, T. Eguchi, and F. Oba. 2006. “Production Planning and Simulation for Reverse Supply Chain.” JSME International Journal Series C 49(2): 281–286.
  • Nakashima, K., H. Arimitsu, T. Nose, and S. Kuriyama. 2004. “Optimal Control of a Remanufacturing System.” International Journal of Production Research 42(17): 3619–3625.
  • Navin-Chandra, D. 1994. “The Recovery Problem in Product Design.” Journal of Engineering Design 5(1): 65–86.
  • Ottman, J. 1998. Green Marketing: Opportunity for Innovation. 2nd ed. New York: McGraw-Hil.
  • Ovchinnikov, A. 2011. “Revenue and Cost Management for Remanufactured Products.” Production and Operations Management 20(6): 824–840.
  • Özceylan, Eren, and Turan Paksoy. 2013. “A Mixed Integer Programming Model for a Closed-loop Supply-chain Network.” International Journal of Production Research 51(3): 718–734.
  • Phlips, L.1983. The Economics of Price Discrimination. Cambridge: Cambridge University Press.
  • Realff, M. J., J. C. Ammons, and D. Newton. 2000. “Strategic Design of Reverse Production Systems.” Computers & Chemical Engineering 24(2): 991–996.
  • Reimann M., and G. Lechner. 2012. “Production and Remanufacturing Strategies in a Closed-Loop Supply Chain: A Two-Period Newsvendor Problem.” In Handbook of Newsvendor Problems, edited by Tsan-Ming Choi, 219–248. New York: Springer.
  • Rezaei, J., and M. Davoodi. 2012. “A Joint Pricing, Lot-sizing, and Supplier Selection Model.” International Journal of Production Research 50(16): 4524–4542.
  • Roberts, J. A. 1996. “Green Consumers in the 1990s: Profile and Implications for Advertising.” Journal of Business Research 36(3): 217–231.
  • Robotis, A., S. Bhattacharya, and L. N. Wassenhove. 2012. “Lifecycle Pricing for Installed Base Management with Constrained Capacity and Remanufacturing.” Production and Operations Management 21(2): 236–252.
  • Rogers, D. S., and R. S. Tibben-Lembke. 1999. Going Backwards: Reverse Logistics Trends and Practices. Vol. 2. Pittsburgh, PA: Reverse Logistics Executive Council.
  • Rose, C. M., and K. Ishii. 1999. “Product End-of-life Strategy Categorization Design Tool.” Journal of Electronics Manufacturing 9(1): 41–52.
  • Sarin, S. C., H. D. Sherali, and A. Bhootra. 2006. “A Precedence-constrained Asymmetric Traveling Salesman Model for Disassembly Optimization.” IIE Transactions 38(3): 223–237.
  • Sarin, S. C., and D. W. Steeneck. In-house Process Improvement for Dex. Technical Report, 2012.
  • Sarin, S. C., and S. T. Zaloga. Environmentally Conscious Manufacturing and Design. Technical Report, 1998.
  • Schulz, T. 2011. “A New Silver-meal Based Heuristic for the Single-item Dynamic Lot Sizing Problem with Returns and Remanufacturing.” International Journal of Production Research 49(9): 2519–2533.
  • Shimizu, Y., K. Tsuji, and M. Nomura. 2007. “Optimal Disassembly Sequence Generation Using a Genetic Programming.” International Journal of Production Research 45(18–19): 4537–4554.
  • Srivastava, S. K. 2007. “Green Supply-Chain Management: A State-of-the-Art Literature Review.” International Journal of Management Reviews 9(1): 53–80.
  • Stahel, W. R. 1995. “Caterpillar Remanufactured Products Group.” Accessed Septemeber 2012. http://www.product-life.org/en/archive/case-studies/caterpillar-remanufactured-products-group.
  • Tang, O., and R. H. Teunter. 2006. “Economic Lot Scheduling Problem with Returns.” Production and Operations Management 15(4): 488–497.
  • Teunter, R. H. 2001. “Economic Ordering Quantities for Recoverable Item Inventory Systems.” Naval Research Logistics 48(6): 484–495.
  • Teunter, R. H., Z. P. Bayindir, and W. Heuvel. 2006. “Dynamic Lot Sizing with Product Returns and Remanufacturing.” International Journal of Production Research 44(20): 4377–4400.
  • Teunter, R. H., O. Tang, and K. Kaparis. 2009. “Heuristics for the Economic Lot Scheduling Problem with Returns.” International Journal of Production Economics 118(1): 323–330.
  • Tibben-Lembke, R. S. 2002. “Life After Death: Reverse Logistics and the Product Life Cycle.” International Journal of Physical Distribution & Logistics Management 32(3): 223–244.
  • Laan, E., and M. Salomon. 1997. “Production Planning and Inventory Control with Remanufacturing and Disposal.” European Journal of Operational Research 102(2): 264–278.
  • Vorasayan, J., and S. M. Ryan. 2009. “Optimal Price and Quantity of Refurbished Products.” Production and Operations Management 15(3): 369–383.
  • Wang, Hsiao-Fan, and Yen-Shan Huang. 2013. “A Two-stage Robust Programming Approach to Demand-driven Disassembly Planning for a Closed-loop Supply Chain System.” International Journal of Production Research 51(8): 2414–2432.
  • Warnecke H. J., M. Schwelzer, and M. Kahmeyer. 1992. “Flexible Disassembly with Industrial Robots”. In Proceedings of the International Symposium on Industrial Robots, Vol. 23. 547–547.
  • Zhao, Y., V. Pandey, H. Kim, and D. Thurston. 2010. “Varying Lifecycle Lengths Within a Product Take-back Portfolio.” Journal of Mechanical Design 132 (9): 1–10.
  • Zhou, Yu, and Gendao Li Xiong. 2013. “The Bright Side of Manufacturing-remanufacturing Conflict in a Decentralised Closed-Loop Supply Chain.” International Journal of Production Research 51 (9): 2639–2651.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.