- Asada, H., and A. B. By. 1985. “Kinematic Analysis of Workpart Fixturing for Flexible Assembly with Automatically Reconfigurable Fixtures.” IEEE Journal of Robotics and Automation RA-1(2): 86–94.
- Cai, W., S. J. Hu, and J. X. Yuan. 1997. “A Variational Method of Robust Fixture Configuration Design for 3-D Workpieces.” ASME, Journal of Manufacturing Science and Engineering 119(4A): 593–602.
- Chen, W. F., L. J. Ni, and J. B. Xue. 2008. “Deformation Control through Fixture Layout Design and Clamping Force Optimization.” International Journal of Advanced Manufacturing Technology 38(9–10): 860–867.
- Chou, Y. C., V. Chandru, and M. M. Barash. 1989. “A Mathematical Approach to Automatic Configuration of Machining Fixtures: Analysis and Synthesis.” ASME Journal of Engineering for Industry 111(11): 299–306.
- Chu, Y. X. 1999. “Workpiece Localization: Theory, Algorithms and Implementation.” PhD Thesis, Hong Kong University of Science and Technology, Hong Kong.
- Hong, M., S. Payandeh, and W. A. Gruver. 1996. “Modeling and Analysis of Flexible Fixturing Systems for Agile Manufacturing.” IEEE International Conference on Systems, Man, and Cybernetics, Beijing, China, 2 (14–17): 1231–1236, October.
- Kang, Y. Z. 2001. “Computer Aided Fixture Design Verification.” PhD Thesis, Worcester Polytechnic Institute, Massachusetts.
- Padmanaban, K. P., K. P. Arulshri, and G. Prabhakaran. 2010. “Machining Fixture Layout Design Using Ant Colony Algorithm Based Continuous Optimization Method.” International Journal of Advanced Manufacturing Technology 45(9–10): 922–934.
- Qin, G. H., and W. H. Zhang. 2007. “Modeling and Analysis of Workpiece Stability Based on the Linear Programming Method.” International Journal of Advanced Manufacturing Technology 32(1–2): 78–91.
- Qin, G. H., W. H. Zhang, and M. Wan. 2006. “A Mathematical Approach to Analysis and Optimal Design of Fixture Locating Scheme.” International Journal of Advanced Manufacturing Technology 29(3–4): 349–359.
- Qin, G. H., W. H. Zhang, and M. Wan. 2008. “A Machining Dimension-based Approach to Locating Scheme Design.” ASME Journal of Manufacturing Science and Engineering 130(5): 0510101–0510108.
- Rong, Y. M., and Y. X. Zhu. 1999. Computer Aided Fixture Design. New York: Marcel Dekker.
- Rong, Y. M., S. H. Huang, and Z. K. Hou. 2005. Advanced Computer-aided Fixture Design. Orlando, FL: Elsevier Academic Press.
- Song, H., and Y. Rong. 2005. “Locating Completeness Evaluation and Revision in Fixture Plan.” Robotics and Computer-Integrated Manufacturing 21(4–5): 368–378.
- Trappey, A. J. C., and C. R. Liu. 1992. “An Automatic Workholding Verification System.” Robotics and Computer-Integrated Manufacturing 9(4/5): 321–326.
- Wang, M. Y. 2002. “Tolerance Analysis for Fixture Layout Design.” International Journal of Assembly Automation 22(2): 153–162.