References
- Buzacott, J. A. 2013. “Then and Now – 50 Years of Production Research.” International Journal of Production Research. doi:10.1080/00207543.2013.778434.
- Carrie, A. S. 1980. “Computer Aided Layout Planning – The Way Ahead.” International Journal of Production Research 18 (3): 283–294.10.1080/00207548008919668
- Chun, Y., and B. Bidanda. 2013. “Sustainable Manufacturing and the Role of the International Journal of Production Research.” International Journal of Production Research. doi:10.1080/00207543.2012.762135.
- Dudley, N. A. 1970. “Research Note: Comparative Productivity Analysis – Study in the United Kingdom West Midlands Engineering and Metal Working Industries.” International Journal of Production Research 8 (4): 397–403.10.1080/00207547008929856
- Ebrahimi, M., and M. Sadeghi. 2013. “Quality Management and Performance: an Annotated Review.” International Journal of Production Research 51 (18): 5625–5643.10.1080/00207543.2013.793426
- Eilon, S. 1961. “Two Inventory Control Models.” International Journal of Production Research 1 (1): 48–55.10.1080/00207546108943073
- Golhar, D. Y., and C. L. Stamm. 1991. “The Just-in-time Philosophy: A Literature Review.” International Journal of Production Research 29 (4): 657–676.10.1080/00207549108930094
- Gregory, G. 1961. “A Note on a Method of Estimating the Precision of Time Study Observation.” International Journal of Production Research 1 (1): 63–65.10.1080/00207546108943075
- Gunasekaran, A. 1998. “Agile Manufacturing: Enablers and an Implementation Strategy.” International Journal of Production Research 36 (5): 1223–1247.10.1080/002075498193291
- Hills, R. 1961. “An Electrical Analogue for Solving Transportation Problems.” International Journal of Production Research 1 (1): 56–62.10.1080/00207546108943074
- Kendrick, C. 1961. “Estimation of Service Requirements for Production Purpose.” International Journal of Production Research 1 (1): 1–12.10.1080/00207546108943069
- Mansoor, E. M. 1961. “Selective Assembly – Its Analysis and Applications.” International Journal of Production Research 1 (1): 13–14.10.1080/00207546108943070
- Mason-Jones, R., B. Naylor, and D. R. Towill. 2000. “Lean, Agile or Leagile? Matching Your Supply Chain to the Marketplace.” International Journal of Production Research 38 (17): 4061–4070.10.1080/00207540050204920
- O’Brien, C. 2002. “Global Manufacturing and the Sustainable Economy.” International Journal of Production Research 40 (15): 3867–3877.10.1080/00207540210157169
- Pentland, W., J. L. Wennberg, and C. L. Mehl. 1961. “Research in Machining High Strength Materials at Elevated Temperatures.” International Journal of Production Research 1 (1): 25–43.10.1080/00207546108943071
- Rohmert, W., and W. Laurig. 1971. “Work Measurement Psychological and Physiological Techniques for Assessing Operator Work Load.” International Journal of Production Research 9 (1): 157–168.10.1080/00207547108929868
- Sugimori, Y., K. Kusunoki, F. Cho, and S. Uchikawa. 1997. “Toyota Production System and Kanban System Materialization of Just-in-time and Respect-for-human System.” International Journal of Production Research 15 (6): 553–564.
- Villa, A. 2002. “Emerging Trends in Large-scale Supply Chain Management.” International Journal of Production Research 40 (15): 3487–3498.10.1080/00207540210131833
- White, D. J. 1961. “Optimal Revision Periods.” International Journal of Production Research 1 (1): 44–47.10.1080/00207546108943072