194
Views
6
CrossRef citations to date
0
Altmetric
Articles

On a multi-product lot scheduling problem subject to an imperfect process with standby modules

, , , &
Pages 2243-2257 | Received 07 Jun 2012, Accepted 10 Sep 2013, Published online: 12 Nov 2013

References

  • Ben-Daya, M., and M. Hariga. 2000. “Economic Lot Scheduling Problem with Imperfect Production Processes.” Journal of the Operational Research Society 51 (7): 875–881.
  • Chung, K. J., and K. L. Hou. 2003. “An Optimal Production Run Time with Imperfect Production Processes and Allowable Shortages.” Computers & Operations Research 30 (4): 483–490.
  • Dobson, G. 1987. “The Economic Lot-scheduling Problem: Achieving Feasibility Using Time-varying Lot Sizes.” Operations Research 35 (5): 764–771.
  • Drozda, T. J., and C. Wick. 1983. Tool and Manufacturing Engineers Handbook. vol. 1. Dearborn, MI: Society of Mechanical Engineers.
  • Elmaghraby, S. E. 1978. “The Economic Lot Scheduling Problem (ELSP): Review and Extensions.” Management Science 24 (6): 587–598.
  • Gallego, G., and M. Queyranne. 1995. “Inventory Coordination and Pricing Decisions: Analysis of Simple Heuristics.” In Optimization in Industries. vol. 3, edited by A. Sciomachen, 83–107. New York: Wiley.
  • Gallego, G., and D. X. Shaw. 1997. “Complexity of the ELSP with General Cyclic Schedules.” IIE Transactions 29 (2): 109–113.
  • Giri, B. C., and T. Dohi. 2007. “Inspection Scheduling for Imperfect Production Processes under Free Repair Warranty Contract.” European Journal of Operational Research 183 (1): 238–252.
  • Giri, B. C., I. Moon, and W. Y. Yun. 2003. “Scheduling Economic Lot Sizes in Deteriorating Production Systems.” Naval Research Logistics 50 (6): 650–661.
  • Haji, R., and M. Mansuri. 1995. “Optimum Common Cycle for Scheduling a Single Machine Multiproduct System with a Budgetary Constraint.” Production Planning & Control 6 (2): 151–156.
  • Hsieh, C. C., and Z. Z. Lee. 2005. “Joint Determination of Production Run Length and Number of Standbys in a Deteriorating Production Process.” European Journal of Operational Research 162 (2): 359–371.
  • Johnson, P. F., M. R. Leenders, and A. E. Flynn. 2011. Purchasing and Supply Management. 4th ed. New York: McGraw-Hill.
  • Kuhn, H., and T. Liske. 2011. “Simultaneous Supply and Production Planning.” International Journal of Production Research 49 (13): 3795–3813.
  • Lin, G. C., D. E. Kroll, and C. J. Lin. 2006. “Determining a Common Production Cycle Time for an Economic Lot Scheduling Problem with Deteriorating Items.” European Journal of Operational Research 173 (2): 669–682.
  • Lo, S. T., H. M. Wee, and W. C. Huang. 2007. “An Integrated Production-inventory Model with Imperfect Production Processes and Weibull Distribution Deterioration under Inflation.” International Journal of Production Economics 106 (1): 248–260.
  • Moon, I., B. C. Giri, and K. Choi. 2002. “Economic Lot Scheduling Problem with Imperfect Production Processes and Setup Times.” Journal of the Operational Research Society 53 (6): 620–629.
  • Moon, I., E. A. Silver, and S. Choi. 2002. “Hybrid Genetic Algorithm for the Economic Lot Scheduling Problem.” International Journal of Production Research 40 (4): 809–824.
  • Moon, I. K., B. C. Cha, and H. C. Bae. 2006. “Hybrid Genetic Algorithm for Group Technology Economic Lot Scheduling Problem.” International Journal of Production Research 44 (21): 4551–4568.
  • Osman, H., and K. Demirli. 2012. “Economic Lot and Delivery Scheduling Problem for Multi-stage Supply Chain.” International Journal of Production Economics 136 (2): 275–286.
  • Pinedo, M. L. 2009. Planning and Scheduling in Manufacturing and Services. 2nd ed. New York: Springer.
  • Porteus, E. L. 1986. “Optimal Lot Sizing, Process Quality Improvement, and Setup Cost Reduction.” Operations Research 34 (1): 137–144.
  • Rosenblatt, M. J., and H. L. Lee. 1986. “Economic Production Cycles with Imperfect Production Processes.” IIE Transactions 18 (1): 48–55.
  • Sana, S. S. 2010. “An Economic Production Lot Size Model in an Imperfect Production System.” European Journal of Operational Research 201 (1): 158–170.
  • Schweitzer, P. J., and E. A. Silver. 1983. “Mathematical Pitfalls in the One Machine Multi-product Lot Scheduling Problem.” Operations Research 31 (2): 401–405.
  • Silver, E. A., D. F. Pyke, and R. Peterson. 1998. Inventory Management and Production Planning and Scheduling. 3rd ed. New York: Wiley.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.