691
Views
14
CrossRef citations to date
0
Altmetric
Articles

Assessing the impact of alternative continuous improvement programmes in a flow shop using system dynamics

&
Pages 3014-3031 | Received 10 Feb 2013, Accepted 21 Oct 2013, Published online: 03 Dec 2013

References

  • Adams, M., P. Componation, H. Czarnecki, and B. J. Schroer. 1999. “Simulation as a Tool for Continuous Process Improvement.” In Winter Simulation Conference, Phoenix, AZ.
  • Baines, T. S., and D. K. Harrison. 1999. “An Opportunity for System Dynamics in Manufacturing System Modeling.” Production Planning and Control 10: 542–552.
  • Barad, M., and S. Dror. 2008. “Strategy Maps as Improvement Paths for Enterprises.” International Journal of Production Research 46: 6627–6647.
  • Berger, A. 1997. “Continuous Improvement and Kaizen: Standartization and Organizational Designs.” Integrated Manufacturing Systems 8: 110–117.
  • Biller, S., and S. Meerkov. 2013. “Raw Material Release Rates to Ensure Desired Production Lead Time in Bernoulli Serial Lines.” International Journal of Production Research 51: 4349–4364.
  • Buzacott, J. A., and J. G. Shanthikumar. 1993. Stochastic Models of Manufacturing Systems. Englewood Cliffs, NJ: Prentice-Hall.
  • Caridi, M., R. Cigolini, and V. Farina. 2006. “Designing Unbalanced Paced Lines: A Conceptual Model and an Experimental Campaign.” Production Planning and Control 17: 464–479.
  • Chand, S., H. Moskowitz, A. Novak, I. Pekhi, and G. Sorger. 1996. “Capacity Allocation for Dynamic Process Improvement with Quality and Demand Considerations.” Operations Research 44 (6): 964–975.
  • Dayhoff, J. E., and R. W. Atherton. 1986a. “Signature Analysis of Dispatch Schemes in Wafer Fabrication.” IEEE Transactions on Components, Hybrids and Manufacturing Technology 9: 518–525.
  • Dayhoff, J. E., and R. W. Atherton. 1986b. “Signature Analysis: Simulation of Inventory, Cycle Time and Throughput Tradeoffs in Wafer Fabrication.” IEEE Transactions on Components, Hybrids and Manufacturing Technology 9: 498–507.
  • Domaschke, J., S. Brown, J. Robinson, and F. Leibl. 1998. “Effective Implementation of Cycle Time Reduction Strategies for Semiconductor Back-end Manufacturing.” In Winter Simulation Conference, Washington, DC.
  • Ebert, R. J. 1976. “Aggregate Planning with Learning Curve Productivity.” Management Science 23: 12.
  • Fine, C. H. 1986. “Quality Improvement and Learning in Productive Systems.” Management Technology 32: 1301–1315.
  • Fine, C. H. 1988. “A Quality Control Model with Learning Effects.” Operations Research 36: 437–444.
  • Forrester, J. W. 1962. Industrial Dynamics. Cambridge, MA: MIT Press.
  • Gershwin, S. B. 1994. Manufacturing Systems Engineering. Englewood Cliffs, NJ: Prentice-Hall.
  • Godinho Filho, M., and R. Uzsoy. 2008. “Combining System Dynamics and Factory Physics Approach to Study the Effect of Continuous Improvement on Lot Size – Cycle Time Relationships.” 19th Annual Conference of the Production and Operations Management Society. La Jolla, CA.
  • Godinho Filho, M., and R. Uzsoy. 2011. “The Effect of Shop Floor Continuous Improvement Programs on the Lot Size – Cycle Time Relationship in a MultiProduct Single-machine Environment.” International Journal of Advanced Manufacturing Technology 52: 669–681.
  • Godinho Filho, M., and R. Uzsoy. 2013. “The Impact of Continuous Improvement in Setup and Repair Time on Manufacturing Cycle Time Under Uncertain Conditions.” International Journal of Production Research 51: 447–464.
  • Goldratt, E. M., and J. Cox. 1992. The Goal: A Process of Ongoing Improvement. Great Barrington, MA: North River Press.
  • Goldratt, E., and R. E. Fox. 1986. The Race. Great Barrington, MA: North River Press.
  • Gunasekaran, A. 1999. “Agile Manufacturing: A Framework for Research and Development.” International Journal of Production Economics 62: 87–105.
  • Heijnen, P., and Z. Lukszo. 2006. “Continuous Improvement of Batch Wise Operation – A Decision Support Framework.” Production Planning and Control 17: 355–366.
  • Hiller, R. S., and J. F. Shapiro. 1986. “Optimal Capacity Expansion Planning when there are Learning Effects.” Management Science 32: 11.
  • Hopp, W. J., and M. L. Spearman. 2008. Factory Physics: Foundations of Manufacturing Management. Boston, MA: Irwin/McGraw-Hill.
  • Hopp, W. J., S. M. R. Iravani, and B. Shou. 2007. “A Diagnostic Tree for Improving Production Line Performance.” Production and Operations Management 16: 77–92.
  • Hu, G., L. Wang, S. Fetch, and B. Bidanda. 2008. “A Multi-Objective Model for Project Portfolio Selection to Implement Lean and Six Sigma Concepts.” International Journal of Production Research 46: 6611–6625.
  • Ignizio, J. P. 2009. Optimizing Factory Performance: Cost-Effective Ways to Achieve Significant and Sustainable Improvement. New York: McGraw-Hill.
  • Imai, M. 1986. Kaizen – The Key to Japan’s Competitive Success. New York: Random House.
  • Kadipasaoglu, S. N., W. Xiang, S. F. Hurley, and B. M. Khumawala. 2000. “A Study on the Effect of the Extent and Location of Protective Capacity in Flow Systems.” International Journal of Production Economics 63: 217–228.
  • Kayton, D., T. Teyner, C. Schwartz, and R. Uzsoy. 1997. “Focusing Maintenance Improvement Efforts in a Wafer Fabrication Facility Operating Under Theory of Constraints.” Production and Inventory Management 51–57.
  • Kim, S., and R. Uzsoy. 2008. “Integrated Planning of Production and Engineering Process Improvement.” IEEE Transactions on Semiconductor Manufacturing 21: 390–398.
  • Kim, S., and R. Uzsoy. 2013. “Modeling and Analysis of Integrated Planning of Production and Engineering Process Improvement.” IEEE Transactions on Semiconductor Manufacturing 26: 414–422.
  • Li, J., and S. Meerkov. 2009. Production Systems Engineering. New York: Springer.
  • Li, N., L. Zhang, M. T. Zhang, and L. Zheng. 2005. “Applied Factory Physics Study on Semiconductor Assembly and Test Manufacturing.” In IEEE International Symposium on Semiconductor Manufacturing, San Jose, CA.
  • Liao, W. M. 1979. “Effects of Learning on Resource Allocation Decisions.” Decision Sciences 10: 116–125.
  • Liker, J. 2004. The Toyota Way: 14 Management Principles from the World's Greatest Manufacturer. New York: McGraw-Hill.
  • Lin, C., T. S. Baines, J. O’kane, and D. Link. 1998. “Generic Methodology that Aids the Application of System Dynamics to Manufacturing System Modeling.” IEE Conference Publication 457: 344–349.
  • Lutz, S., H. Loedding, and H. P. Wiendahl. 2003. “Logistics-oriented Inventory Analysis.” International Journal of Production Economics 85: 217–231.
  • Mauri, F., M. Garretti, and M. Gandelli. 2010. A Structured Approach to Process Improvement in Manufacturing Systems Production Planning and Control 21: 695–717.
  • Mayer, M., and M. Nusswald. 2001. “Improving Manufacturing Costs and Lead Times with Quality-oriented Operating Curves.” Journal of Materials Processing Technology 119: 83–89.
  • Nakajima, S. 1988. Introduction to TPM. Portland: Productivity Press.
  • Nyhuis, P. 2007. “Practical Applications of Logistic Operating Curves.” CIRP Annals – Manufacturing Technology 56 (1): 483–486.
  • Pande, P., R. P. Neuman, and R. R. Cavanagh. 2000. The Six Sigma Way: How GE, Motorola and Other Top companies are Honing Their Performance. New York: McGraw-Hill.
  • Patti, A. L., K. Watson, and J. H. Blackstone JR. 2008. “The Shape of Protective Capacity in Unbalanced Production Systems with Unplanned Machine Downtime.” Production Planning and Control 19: 486–494.
  • Reeves, G. R., and J. R. Sweigart. 1981. “Product-mix Models When Learning Effects are Present.” Management Science 27 (2): 204–212.
  • Schoemig, A. K. 1999. “The Corrupting Influence of Variability in Semiconductor Manufacturing.” In Winter Simulation Conference, edited by P. A. Farrington, H. B. Nembhard, D. T. Sturrock, and G. W. Evans, 837–842. Phoenix, AZ: Institute of Electrical and Electronics Engineers (IEEE).
  • Shingo, S. 1986. A Revolution in Manufacturing: The SMED System. Cambridge: Productivity Press.
  • Da Silva, C. R. N., and R. Morabito. 2009. “Performance Evaluation and Capacity Planning in a Metallurgical Job Shop System Using Open Queueing Network Models.” International Journal of Production Research 47: 6589–6609.
  • Stalk, G., and T. M. Hout. 1990. Competing Against Time: How Time-based Competition is Reshaping Global Markets. New York: Free Press.
  • Sterman, J. D. 2000. Business Dynamics: Systems Thinking and Modeling for a Complex World. New York: McGraw-Hill.
  • Storck, J. 2010. “Exploring Improvement Trajectories with Dynamic Process Cost Modeling: A Case from the Steel Industry.” International Journal of Production Research 48: 3493–3511.
  • Sugimori, Y., K. Kusunoki, F. Cho, and S. Uchikawa. 1977. “Toyota Production System and Kanban System: Materialization of Just-in-Time and Respect for Human System.” International Journal of Production Research 15: 553–564.
  • Suri, R. 1998. Quick Response Manufacturing: A Companywide Approach to Reducing Lead Times. Portland: Productivity Press.
  • Terwiesch, C., and R. E. Bohn. 2001. “Learning and Process Improvement during Production Ramp-up.” International Journal of Production Economics 70: 1–19.
  • Thawesaengskulthai, N., and J. D. T. Tannock. 2008. “A Decision Aid for Selecting Improvement Methodologies.” International Journal of Production Research 20: 6721–6737.
  • Voss, C. A. 2005. “Paradigms of Manufacturing Strategy Re-visited.” International Journal of Operations and Production Management 25: 1223–1227.
  • Weber, C. M., and A. Fayed. 2010. “Optimizing your Position on the Operating Curve: How can a Fab Truly Maximize its Performance?” IEEE Transactions on Semiconductor Manufacturing 23: 21–29.
  • Womack, J. P., D. T. Jones, and D. Ross. 1990. The Machine That Changed The World. New York: Harper Perennial.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.