Smart production scheduling with time-dependent and machine-dependent electricity cost by considering distributed energy resources and energy storage

&
Pages 3922-3939 | Received 26 Feb 2013, Accepted 23 Oct 2013, Published online: 16 Dec 2013

References

  • Achuthan, N. R., and A. Hardjawidjaja. 2001. “Project Scheduling under Time Dependent Costs -- A Branch and Bound Algorithm.” Annals of Operations Research 108: 55–74.
  • Alidaee, B., and N. K. Womer. 1999. “Scheduling with Time Dependent Processing Times: Review and Extensions.” Journal of the Operational Research Society 50: 711–720.
  • Castro, P. M., I. Harjunkoski, and I. E. Grossmann. 2009. “New Continuous-time Scheduling Formulation for Continuous Plants under Variable Electricity Cost.” Industrial & Engineering Chemistry Research 48: 6701–6714.
  • Cheng, T. C. E., Q. Ding, and B. M. T. Lin. 2004. “A Concise Survey of Scheduling with Time-dependent Processing Times.” European Journal of Operational Research 152: 1–13.
  • Gao, J., M. Gen, L. Sun, and X. Zhao. 2007. “A Hybrid of Genetic Algorithm and Bottleneck Shifting for Multiobjective Flexible Job Shop Scheduling Problems.” Computers & Industrial Engineering 53 (1): 149–162.
  • Garey, M. R., and D. S. Johnson. 1979. Computers and Intractability: A Guide to the Theory of NP-completeness. San Francisco, CA: W.H. Freeman and Company.
  • Garey, M. R., D. S. Johnson, and R. Sethi. 1976. “The Complexity of Flow Shop and Job-shop Scheduling.” Mathematics of Operations Research 1: 117–129.
  • Ghobeity, A., and A. Mitsos. 2010. “Optimal Time-dependent Operation of Seawater Reverse Osmosis.” Desalination 263: 76–88.
  • Ho, N. B., J. C. Tay, M. Edmund, and K. Lai. 2007. “An Effective Architecture for Learning and Evolving Flexible Job Shop Schedules.” European Journal of Operational Research 179: 316–333.
  • Kelbel, J., and Z. Hanzalek. 2011. “Solving Production Scheduling with Earliness Tardiness Penalties by Constraint Programming.” Journal of Intelligent Manufacturing 22: 553–562.
  • Li, N., L. Chen, and S. H. Low. 2011. “Optimal Demand Response Based on Utility Maximization in Power Networks.” Paper presented at the Power and Energy Society General Meeting, 2011 IEEE, San Diego, CA.
  • Moghaddam, A. A., A. Seifi, T. Niknam, and M. R. A. Pahlavani. 2011. “Multi-objective Operation Management of a Renewable MG (micro-grid) Back-up Micro-turbine/Fuel cell/Battery Hybrid Power Source.” Energy 36 (11): 6490–6507.
  • Moon, J. Y., H. Na, B. K. Choi, and J. Park. 2011. “Modeling and Optimization of Unrelated Parallmachine Scheduling Problem with Time-dependent and Machine-dependent Electricity Cost.” Paper presented at the International Conference on the Advances in Production Management Systems, Stavanger, Norway, September 26--28.
  • Moradi, E., S. M. T. Fatemi Ghomi, and M. Zandieh. 2011. “Bi-objective Optimization Research on Integrated Fixed Time Interval Preventive Maintenance and Production for Scheduling Flexible Job-shop Problem.” Expert Systems with Applications 38 (6): 7169–7178.
  • Nilsson, K. 1993. “Industrial Production Planning with Optimal Electricity Cost.” Energy Conversion and Management 34 (3): 153–158.
  • Nilsson, K., and M. Soderstrom. 1993. “Industrial Applications of Production Planning with Optimal Electricity Demand.” Applied Energy 46 (2): 181–192.
  • Pazzella, F., G. Morganti, and G. Ciaschetti. 2007. “A Genetic Algorithm for the Flexible Job-shop Scheduling Problem.” Computers and Operations Research 35 (10): 3202–3212.
  • Sanseverino, E. R., M. L. D. Silvestre, M. G. Ippolito, A. D. Paola, and G. L. Re. 2011. “An Execution, Monitoring and Replanning Approach for Optimal Energy Management in Micro Grids.” Energy 36 (5): 3429–3436.
  • Xia, W. J., and Z. M. Wu. 2005. “An Effective Hybrid Optimization Approach for Multi-objective Flexible Job-shop Scheduling Problems.” Computers & Industrial Engineering 48 (2): 409–425.
  • Yusta, J. M., F. Torres, and H. M. Khodr. 2010. “Optimal Methodology for a Machining Process Scheduling in Spot Electricity Markets.” Energy Convers Manage 51: 2647–2654.
  • Zhang, G., X. Shao, P. Li, and L. Gao. 2009. “An Effective Hybrid Particle Swarm Optimization Algorithm for Multi-objective Flexible Job-shop Scheduling Problem.” Computers & Industrial Engineering 56: 1309–1318.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.