611
Views
14
CrossRef citations to date
0
Altmetric
Articles

An available-to-promise decision support system for a multi-site make-to-order production system

&
Pages 4253-4266 | Received 05 Jan 2012, Accepted 20 Nov 2013, Published online: 31 Jan 2014

References

  • Akkan, C. 1997. “Finite-capacity Scheduling-based Planning for Revenue-based Capacity Management.” European Journal of Operational Research 100 (1): 170–179.10.1016/S0377-2217(96)00021-5
  • Alemany, M. M. E., F. C. Lario, A. Ortiz, and F. Gómez. 2013. “Available-to-promise Modeling for Multi-plant Manufacturing Characterized by Lack of Homogeneity in the Product: An Illustration of a Ceramic Case.” Applied Mathematical Modelling 37 (5): 3380–3398.10.1016/j.apm.2012.07.022
  • Alfieri, A. 2007. “Due Date Quoting and Scheduling Interaction in Production Lines.” International Journal of Computer Integrated Manufacturing 20 (6): 579–587.10.1080/09511920601079363
  • Arredondo, F., and E. Martinez. 2010. “Learning and Adaptation of a Policy for Dynamic Order Acceptance in Make-to-order Manufacturing.” Computer & Industrial Engineering 58 (1): 70–83.
  • Birman, M., and G. Mosheiov. 2004. “A Note on a Due-date Assignment on a Two-machine Flow-shop.” Computers & Operations Research 31 (3): 473–480.
  • Charnsirisakskul, K., Paul M. Griffin, and P. Keskinocak. 2006. “Pricing and Scheduling Decisions with Leadtime Flexibility.” European Journal of Operational Research 171 (1): 153–169.10.1016/j.ejor.2004.07.062
  • Chen, C. Y., Z. Y. Zhao, and M. O. Ball. 2002. “A Model for Batch Advanced Available-to-promise.” Production and Operations Management 11 (4): 424–440.
  • Cheng, T. C. E., Z.-L. Chen, and N. V. Shakhlevich. 2002. “Common Due Date Assignment and Scheduling with Ready Times.” Computers & Operations Research 29 (14): 1957–1967.
  • Christou, I. T., and S. Ponis. 2009. “A Hierarchical System for Effective Coordination of Available-to-promise Logic Mechanisms.” International Journal of Production Research 47 (11): 3063–3078.10.1080/00207540701810786
  • Corti, D., A. Pozzetti, and M. Zorzini. 2006. “A Capacity-driven Approach to Establish Reliable Due Dates in a MTO Environment.” International Journal of Production Economics 104 (2): 536–554.10.1016/j.ijpe.2005.03.003
  • Ebben, M. J. R., E. W. Hans, and F. M. Olde Weghuis. 2005. “Workload Based Order Acceptance in Job Shop Environments.” OR Spectrum 27 (1): 107–122.10.1007/s00291-004-0171-9
  • Framinan, J. M., and R. Leisten. 2010. “Available-to-promise (ATP) Systems: A Classification and Framework for Analysis.” International Journal of Production Research 48 (11): 3079–3103.10.1080/00207540902810544
  • Gao, L., S. H. Xu, and M. O. Ball. 2012. “Managing an Available-to-promise Assembly System with Dynamic Short-term Pseudo-order Forecast.” Management Science 58 (4): 770–790.10.1287/mnsc.1110.1442
  • Jeong, B., S. B. Sim, H. S. Jeong, and S. W. Kim. 2002. “An Available-to-promise System for TFT LCD Manufacturing in Supply Chain.” Computers & Industrial Engineering 43 (1–2): 191–212.
  • Jung, H. 2010. “An Available-to-promise Model Considering Customer Priority and Variance of Penalty Costs.” International Journal of Advanced Manufacturing Technology 49 (1–4): 369–377.10.1007/s00170-009-2389-9
  • Jung, H. 2012. “An Available-to-promise Process Considering Production and Transportation Uncertainties and Multiple Performance Measures.” International Journal of Production Research 50 (7): 1780–1798.10.1080/00207543.2011.561373
  • Keskinocak, P., and S. Tayur. 2004. “Due-date Management Policies.” In Handbook of Quantitative Analysis: Modeling in an-E-business Era, edited by D. Simchi-Levi, D. Wu, and Z. M. Shen, 485–553. Dordrecht: Kluwer.10.1007/978-1-4020-7953-5
  • Kilger, C., and H. Meyr. 2008. “Demand Fulfilment and ATP.” In Supply Chain Management and Advanced Planning. 4th ed., edited by H. Stadtler and C. Kilger, 181–198. Heidelberg: Springer.10.1007/978-3-540-74512-9
  • Kingsman, B., L. Worden, A. Hendry, A. Mercer, and E. Wilson. 1993. “Integrating Marketing and Production Planning in Make-to-order Companies.” International Journal of Production Economics 30: 53–66.10.1016/0925-5273(93)90081-U
  • Kirche, E. T., S. N. Kadipasaoglu, and B. M. Khumawala. 2005. “Maximizing Supply Chain Profits with Effective Order Management: Integration of Activity-based Costing and Theory of Constraints with Mixed-integer Modelling.” International Journal of Production Research 43 (7): 1297–1311.10.1080/00207540412331299648
  • Lewis, H. F., and S. A. Slotnick. 2002. “Multi-period Job Selection: Planning Work Loads to Maximize Profit.” Computer & Operation Research 29 (8): 1081–1098.
  • Li, C. L., and T. C. E. Cheng. 1999. “Due-date Determination with Resequencing.” IIE Transactions 31 (2): 183–188.
  • Martin, R. K. 1999. Large Scale Linear and Integer Optimization. Norwell, MA: Kluwer Academic Publisher.10.1007/978-1-4615-4975-8
  • Meyr, H. 2009. “Customer Segmentation, Allocation Planning and Order Promising in Make-to-stock Production.” OR Spectrum 31 (1): 229–256.10.1007/s00291-008-0123-x
  • Moses, S. A. 1999. “Due Date Assignment Using Feedback Control with Reinforcement Learning.” IIE Transactions 31 (10): 989–999.
  • Panwalkar, S. S., M. L. Smith, and A. Seidmann. 1982. “Common Due Date Assignment to Minimize Total Penalty for the One Machine Scheduling Problem.” Operations Research 30 (2): 391–399.10.1287/opre.30.2.391
  • Qzdamar, L., and T. Yazgac. 1997. “Capacity Driven Due Date Settings in Make-to-order Production Systems.” International Journal of Production Economics 47 (1): 29–44.10.1016/S0925-5273(96)00116-8
  • Raaymakers, W. H. M., J. W. M. Bertrand, and J. C. Fransoo. 2000. “Using Aggregate Estimation Models for Order Acceptance in a Decentralized Production Control Structure for Batch Chemical Manufacturing.” IIE Transactions 32 (10): 989–998.
  • Roundy, R., D. Chen, P. Chen, M. Çakanyildirim, M. B. Freimer, and V. Melkonian. 2005. “Capacity-driven Acceptance of Customer Orders for a Multi-stage Batch Manufacturing System: Models and Algorithms.” IIE Transactions 37 (12): 1093–1105.10.1080/07408170500288042
  • Saad, S. M., N. Pickett, and K. Kittiaram. 2004. “An Integrated Model for Order Release and Due-date Demand Management.” Journal of Manufacturing Technology Management 15 (1): 76–89.10.1108/09576060410512356
  • Sawik, T. 2006. “Hierarchical Approach to Production Scheduling in Make-to-order Assembly.” International Journal of Production Research 44 (4): 801–830.10.1080/00207540500340969
  • Sawik, T. 2009. “Multi-Objective Due Date Setting in a Make-to-order Environment.” International Journal of Production Research 47 (22): 6025–6231.
  • Schwendinger, J. 1979. “Master Production Scheduling’s Available-to-promise.” In APICS Conference Proceedings, Chicago, IL, 316–330.
  • Slotnick, S. A., and T. E. Morton. 2007. “Order Acceptance with Weighted Tardiness.” Computers & Operations Research 34 (10): 3029–3042.
  • Stadtler, H. 2005. “Supply Chain Management and Advanced Planning – Basics, Overview and Challenges.” European Journal of Operational Research 163 (3): 575–588.10.1016/j.ejor.2004.03.001
  • Tsai, K. M., and S. C. Wang. 2009. “Multi-site Available-to-promise Modeling for Assemble-to-order Manufacturing: An Illustration on TFT-LCD Manufacturing.” International Journal of Production Economics 117 (1): 174–184.10.1016/j.ijpe.2008.10.010
  • Vanderbeck, F. 2000. “On Dantzig–Wolfe Decomposition in Integer Programming and Ways to Perform Branching in a Branch-and-price Algorithm.” Operations Research 48 (1): 111–128.10.1287/opre.48.1.111.12453
  • Venkatadri, U., A. Srinivasan, B. Montreuil, and A. Saraswat. 2006. “Optimization-based Decision Support for Order Promising in Supply Networks.” International Journal of Production Economics 103 (1): 117–130.10.1016/j.ijpe.2005.05.019
  • Wein, L. 1991. “Due Date Setting and Priority Sequencing in a Multiclass M/G/1 Queue.” Management Science 37 (7): 834–850.10.1287/mnsc.37.7.834
  • Wisner, J. D., and S. P. Siferd. 1995. “A Survey of U.S. Manufacturing Practices in Make-to-order Machine Shops.” Production and Inventory Management Journal 36 (1): 1–7.
  • Xiong, M. H., S. B. Tor, R. Bhatnagar, L. P. Khoo, and S. Venkat. 2006. “A DSS Approach to Managing Customer Enquiries for SMEs at the Customer Enquiry Stage.” International Journal of Production Economics 103 (1): 332–346.10.1016/j.ijpe.2005.08.008
  • Yang, W., and R. Y. K. Fung. 2012. “Available-to-promise Model for a Multi-site Supply Chain.” In Proceeding of the IEEE International Conference on Automation and Logistics ICAL2012, 78–83, August 15–17, Zhengzhou, China.
  • You, P. S., and Y. C. Hsieh. 2012. “A Heuristic Approach to a Single Stage Assembly Problem with Transportation Allocation.” Applied Mathematics and Computation 218 (22): 11100–11111.10.1016/j.amc.2012.04.066
  • Zhang, Q., and M. M. Tseng. 2008. “Modelling and Integration of Customer Flexibility in the Order Commitment Process for High Mix Low Volume Production.” International Journal of Production Research 47 (22): 6397–6416.
  • Zhao, Z. Y., M. O. Ball, and M. Kotake. 2005. “Optimization-based Available-to-promise with Multistage Resource Availability.” Annals of Operations Research 135 (1): 65–85.10.1007/s10479-005-6235-7
  • Zschorn, L. 2006. “An Extended Model of ATP to Increase Flexibility of Delivery.” International Journal of Computer Integrated Manufacturing 19 (5): 434–442.10.1080/09511920500399037

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.