377
Views
19
CrossRef citations to date
0
Altmetric
Articles

An exploratory study of disaggregated clearing functions for production systems with multiple products

, &
Pages 5301-5322 | Received 11 Feb 2013, Accepted 20 Jan 2014, Published online: 07 Apr 2014

References

  • Albey, E. 2012. Capacity Modeling in Aggregate Production Planning: Multi-dimensional Clearing Functions and Iterative Linear Programming-simulation Approaches. PhD diss., Bogazici University, Istanbul.
  • Albey, E., and U. Bilge. 2011. “A Hierarchical Approach to FMS Planning and Control with Simulation-based Capacity Anticipation.” International Journal of Production Research 49: 3319–3342.10.1080/00207543.2010.482570
  • Al-Khayyal, F. A. 1992. “Generalized Bilinear Programming: Part I. Models, Applications and Linear Programming Relaxation.” European Journal of Operational Research 60: 306–314.10.1016/0377-2217(92)90082-K
  • Anli, O. M., M. Caramanis, and I. C. Paschalidis. 2007. “Tractable Supply Chain Production Planning, Modeling Nonlinear Lead Time and Quality of Service Constraints.” Journal of Manufacturing Systems 26: 116–134.10.1016/j.jmsy.2008.05.001
  • Askin, R. G., and C. R. Standridge. 1993. Modeling and Analysis of Manufacturing Systems. New York: John Wiley.
  • Asmundsson, J. M., R. L. Rardin, C. H. Turkseven, and R. Uzsoy. 2009. “Production Planning with Resources Subject to Congestion.” Naval Research Logistics 56: 142–157.10.1002/nav.v56:2
  • Asmundsson, J. M., R. L. Rardin, and R. Uzsoy. 2006. “Tractable Nonlinear Production Planning Models for Semiconductor Wafer Fabrication Facilities.” IEEE Transactions on Semiconductor Manufacturing 19: 95–111.10.1109/TSM.2005.863214
  • Bang, J. Y., and Y. D. Kim. 2010. “Hierarchical Production Planning for Semiconductor Wafer Fabrication Based on Linear Programming and Discrete-event Simulation.” IEEE Transactions on Automation Science and Engineering 7: 326–336.10.1109/TASE.2009.2021462
  • Byrne, M. D., and M. A. Bakir. 1999. “Production Planning Using a Hybrid Simulation – Analytical Approach.” International Journal of Production Economics 59: 305–311.10.1016/S0925-5273(98)00104-2
  • Byrne, M. D., and M. M. Hossain. 2005. “Production Planning: An Improved Hybrid Approach.” International Journal of Production Economics 93–94: 225–229.10.1016/j.ijpe.2004.06.021
  • Cambini, A., J. P. Crouzeix, and L. Martein. 2002. “On the Pseudoconvexity of a Quadratic Fractional Function.” Optimization 51: 677–687.10.1080/0233193021000030779
  • Coleman, T. F., and Y. Li. 1996. “An Interior Trust Region Approach for Nonlinear Minimization Subject to Bounds.” SIAM Journal on Optimization 6: 418–445.10.1137/0806023
  • Elmaghraby, S. E. 1991. “Manufacturing Capacity and Its Measurement: A Critical Evaluation.” Computers & Operations Research 18: 615–627.10.1016/0305-0548(91)90071-X
  • Elmaghraby, S. E. 2010. “Production Capacity: Its Bases, Functions and Measurement.” In Planning Production and Inventories in the Extended Enterprise: A State of the Art Handbook, edited by K. G. Kempf, P. Keskinocak, and R. Uzsoy, 119–166. New York: Springer.
  • Godinho Filho, M., and R. Uzsoy. 2011. “The Effect of Shop Floor Continuous Improvement Programs on the Lot Size–Cycle Time Relationship in a Multi-product Single-machine Environment.” The International Journal of Advanced Manufacturing Technology 52: 669–681.10.1007/s00170-010-2770-8
  • Graves, S. C. 1986. “A Tactical Planning Model for a Job Shop.” Operations Research 34: 522–533.
  • Hopp, W. J., and M. L. Spearman. 2001. Factory Physics: Foundations of Manufacturing Management. Boston, MA: Irwin/McGraw-Hill.
  • Hung, Y. F., and R. C. Leachman. 1996. “A Production Planning Methodology for Semiconductor Manufacturing Based on Iterative Simulation and Linear Programming Calculations.” IEEE Transactions on Semiconductor Manufacturing 9: 257–269.10.1109/66.492820
  • Irdem, D. F., N. B. Kacar, and R. Uzsoy. 2010. “An Exploratory Analysis of Two Iterative Linear Programming-simulation Approaches for Production Planning.” IEEE Transactions on Semiconductor Manufacturing 23: 442–455.10.1109/TSM.2010.2051751
  • Johnson, L. A., and D. C. Montgomery. 1974. Operations Research in Production Planning. New York: Scheduling and Inventory Control.
  • Kacar, N. B., D. F. Irdem, and R. Uzsoy. 2012. “An Experimental Comparison of Production Planning Using Clearing Functions and Iterative Linear Programming-simulation Algorithms.” IEEE Transactions on Semiconductor Manufacturing 25: 104–117.10.1109/TSM.2011.2176560
  • Kacar, N. B., L. Monch, and R. Uzsoy. 2013. “Planning Wafer Starts Using Nonlinear Clearing Functions: A Large-scale Experiment.” IEEE Transactions on Semiconductor Manufacturing 26: 602–612.10.1109/TSM.2013.2283038
  • Kacar, N. B., and R. Uzsoy. 2013. “A Comparison of Multiple Linear Regression Approaches for Fitting Clearing Functions to Empirical Data.” International Journal of Production Research 1–21. doi: 10.1080/00207543.2013.864052.
  • Kang, Y. H., E. Albey, S. Hwang, and R. Uzsoy. Forthcoming. “The Impact of Lot-Sizing in Multiple Product Environments with Congestion.” Journal of Manufacturing Systems.
  • Karmarkar, U. S. 1989. “Capacity Loading and Release Planning with Work-in-progress (WIP) and Lead-times.” Journal of Manufacturing and Operations Management 2: 105–123.
  • Kim, B., and S. Kim. 2001. “Extended Model for a Hybrid Production Planning Approach.” International Journal of Production Economics 73: 165–173.10.1016/S0925-5273(00)00172-9
  • Linderoth, J. 2005. “A Simplicial Branch-and-bound Algorithm for Solving Quadratically Constrained Quadratic Programs.” Mathematical Programming Series B 103: 251–282.
  • Marquardt, D. 1963. “An Algorithm for Least-squares Estimation of Nonlinear Parameters.” Journal of the Society for Industrial and Applied Mathematics 11: 431–441.10.1137/0111030
  • Medhi, J. 1991. Stochastic Models in Queuing Theory. Boston, MA: Academic Press.
  • Mikati, N. 2010. “Dependence of Lead Time on Batch Size Studied by a System Dynamics Model.” International Journal of Production Research 48: 5523–5532.10.1080/00207540903164628
  • Missbauer, H. 2002. “Aggregate Order Release Planning for Time-varying Demand.” International Journal of Production Research 40: 688–718.
  • Missbauer, H. 2009. “Models of the Transient Behaviour of Production Units to Optimize the Aggregate Material Flow.” International Journal of Production Economics 118: 387–397.10.1016/j.ijpe.2008.11.014
  • Missbauer, H., and R. Uzsoy. 2010. “Optimization Models of Production Planning Problems.” In Book Planning Production and Inventories in the Extended Enterprise: A State of the Art Handbook, edited by K. G. Kempf, P. Keskinocak, and R. Uzsoy, vol. 2, 437–509. Norwell, MA: Springer.
  • Pahl, J., S. Voß, and D. L. Woodruff. 2005. “Production Planning with Load Dependent Lead Times.” 4OR: A Quarterly Journal of Operations Research 3: 257–302.
  • Pahl, J., S. Voß, and D. L. Woodruff. 2007. “Production Planning with Load Dependent Lead Times: An Update of Research.” Annals of Operations Research 153: 297–345.
  • Selçuk, B., J. C. Fransoo, and A. G. de Kok. 2007. “Work in Process Clearing in Supply Chain Operations Planning.” IIE Transactions 40: 206–220.
  • Spearman, M. L. 1991. “An Analytic Congestion Model for Closed Production Systems with IFR Processing Times.” Management Science 37: 1015–1029.10.1287/mnsc.37.8.1015
  • Srinivasan, A., M. Carey, and T. E. Morton. 1988. Resource Pricing and Aggregate Scheduling in Manufacturing Systems. Pittsburgh, PA: Graduate School of Industrial Administration, Carnegie-Mellon University.
  • Tawarmalani, M., and N. V. Sahinidis. 2005. “A Polyhedral Branch-and-cut Approach to Global Optimization.” Mathematical Programming 103: 225–249.10.1007/s10107-005-0581-8
  • Thürer, M., M. Stevenson, and C. Silva. 2011. “Three Decades of Workload Control Research: A Systematic Review of the Literature.” International Journal of Production Research 49: 6905–6935.10.1080/00207543.2010.519000
  • Vollmann, T. E., W. L. Berry, D. C. Whybark, and F. R. Jacobs. 2005. Manufacturing Planning and Control for Supply Chain Management. New York: McGraw-Hill.
  • Voss, S., and D. L. Woodruff. 2003. Introduction to Computational Optimization Models for Production Planning in a Supply Chain. Berlin: Springer.10.1007/978-3-540-24764-7
  • Wilcoxon, F. 1945. “Individual Comparisons by Ranking Methods.” Biometrics Bulletin 1: 80–83.10.2307/3001968

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.