References
- Adler, P. S., B. Goldoftas, and D. I. Levine. 1999. “Flexibility vs. Efficiency? A Case Study of Model Changeovers in the Toyota Production System.” Organization Science 10 (1): 43–68.
- Almgren, H. 1999. “Towards a Framework for Analyzing Efficiency During Start-up: An Empirical Investigation of a Swedish Auto Manufacturer.” International Journal of Production Economics 60–61: 79–86.
- Andress, F. J. 1954. “The Learning Curve as a Production Tool.” Harvard Business Review 32: 87–97.
- Argote, L., and D. Epple. 1990. “Learning Curves in Manufacturing.” Science 247 (4945): 920–924.
- Argote, L., C. A. Insko, N. Yovetich, and A. A. Romero. 1995. “Group Learning Curves: The Effects of Turnover and Task Complexity on Group Performance.” Journal of Applied Social Psychology 25 (6): 512–529.
- Baloff, N. 1971. “Extension of the Learning Curve – Some Empirical Results.” Operational Research Quarterly 22 (4): 329–340.
- Bodde, D. L. 1976. “Riding the Experience Curve.” Technology Review 79 (Mar./Apr.): 53–59.
- Bokranz, R., and K. Landau. 2006. Produktivitätsmanagement von Arbeitssystemen: MTM-Handbuch [Managing Productivity in Work Systems: Handbook of MTM]. Stuttgart: Schäffer-Poeschel.
- Boysen, N., M. Fliedner, and A. Scholl. 2008. “Assembly Line Balancing: Which Model to Use When?” International Journal of Production Economics 111 (2): 509–528.
- Cantley, M. F., and D. Sahal. 1979. Who Learns What? A Conceptual Description of Capability and Learning in Technological Systems. Working Paper # 79–110. Laxenburg, Austria: International Institute for Applied Systems Analysis.
- Carlson, J. G. 1961. “How Management Can Use the Improvement Phenomenon.” California Management Review 3 (2): 83–94.
- Chakravarty, A. K. 1988. “Line Balancing with Task Learning Effects.” IIE Transactions 20 (2): 186–193.
- Chakravarty, A. K., and A. Shtub. 1988. “Modelling the Effect of Learning and Job Enlargement on Assembly Systems with Parallel Lines.” International Journal of Production Research 26 (2): 267–281.
- Chakravarty, A. K., and A. Shtub. 1992. “The Effect of Learning on the Operation of Mixed-model Assembly Lines.” Production and Operations Management 1 (2): 198–211.
- Clark, K. B., and T. Fujimoto. 1991. Product Development Performance: Strategy, Organization and Management in the World Auto Industry. Boston, MA: Harvard Business School Press.
- Cohen, Y. 2012. “Absenteeism as a Major Cause of Bottlenecks in Assembly Lines.” International Journal of Production Research 50 (21): 6072–6080.
- Cohen, Y., and M. E. Dar-El. 1998. “Optimizing the Number of Stations in Assembly Lines under Learning for Limited Production.” Production Planning & Control 9 (3): 230–240.
- Cohen, Y., G. Vitner, and S. Sarin. 2006. “Optimal Allocation of Work in Assembly Lines for Lots with Homogenous Learning.” European Journal of Operational Research 168 (3): 922–931.
- Cohen, Y., G. Vitner, and S. Sarin. 2008. “Work Allocation to Stations with Varying Learning Slopes and without Buffers.” European Journal of Operational Research 184 (2): 797–801.
- Conway, R., and A. Schultz. 1959. “The Manufacturing Progress Function.” Journal of Industrial Engineering 10: 39–53.
- Dutton, J. M., and A. Thomas. 1984. “Treating Progress Functions as a Managerial Opportunity.” Academy of Management Review 9 (2): 235–247.
- Fjällström, S., K. Säfsten, U. Harlin, and J. Stahre. 2009. “Information Enabling Production Ramp-up.” Journal of Manufacturing Technology 20 (2): 178–196.
- Fleszar, K., and K. S. Hindi. 2003. “An Enumerative Heuristic and Reduction Methods for the Assembly Line Balancing Problem.” European Journal of Operational Research 145 (3): 606–620.
- Globerson, S., and A. Shtub. 1984. “The Impact of Learning Curves on the Design of Long Cycle Time Lines.” Industrial Management 26: 5–10.
- Hu, S. J., J. Ko, L. Weyand, H. A. ElMaraghy, T. K. Lien, Y. Koren, H. Bley, G. Chryssolouris, N. Nasr, and M. Shpitalni. 2012. “Assembly System Design and Operations for Product Variety.” CIRP Annals – Manufacturing Technology 60 (2): 715–733.
- Jackson, J. 1956. “A Computing Procedure for a Line Balancing Problem.” Management Science 2 (3): 261–271.
- Joskow, P. L., and G. A. Rozanski. 1979. “The Effects of Learning by Doing on Nuclear Plant Operation Reliability.” The Review of Economics and Statistics 61: 161–168.
- Karni, R., and Y. T. Herer. 1995. “Allocation of Tasks to Stations in Small-batch Assembly with Learning: Basic Concepts.” International Journal of Production Research 33 (11): 2973–2998.
- Liao, S. 1988. “The Learning Curve – Wright’s Model vs. Crawford’s Model.” Issues in Accounting Education (Fall) 3 (2): 302–315.
- Nembhard, D. A. 2000. “The Effects of Task Complexity and Experience on Learning and Forgetting: A Field Study.” Human Factors 42 (2): 272–286.
- Nourie, F. J., and E. R. Venta. 1991. “Finding Optimal Line Balances with OptPack.” Operations Research Letters 10 (3): 165–171.
- Otto, A., and A. Scholl. 2013. “Reducing Ergonomic Risks by Job Rotation Scheduling.” OR Spectrum 35 (3): 711–733.
- Otto, A., C. Otto, and A. Scholl. 2012. How to Design and Analyze Priority Rules: Example of Simple Assembly Line Balancing. Working Papers in Supply Chain Management 03/2012. Friedrich-Schiller-University Jena.
- Otto, A., C. Otto, and A. Scholl. 2013. “Systematic Data Generation and Test Design for Solution Algorithms on the Example of SALBPGen for Assembly Line Balancing.” European Journal of Operational Research 228 (1): 33–45.
- Saltzman, M. J., and I. Baybars. 1987. “A Two-process Implicit Enumeration Algorithm for the Simple Assembly Line Balancing Problem.” European Journal of Operational Research 32 (1): 118–129.
- Scholl, A. 1999. Balancing and Sequencing of Assembly Lines. 2nd ed. Heidelberg: Physica.
- Scholl, A., and C. Becker. 2006. “State-of-the-art Exact and Heuristic Solution Procedures for Simple Assembly Line Balancing.” European Journal of Operational Research 168 (3): 666–693.
- Scholl, A., and R. Klein. 1997. “SALOME: A Bidirectional Branch and Bound Procedure for Assembly Line Balancing.” INFORMS Journal on Computing 9 (4): 319–334.
- Scholl, A., and S. Voß. 1996. “Simple Assembly Line Balancing – Heuristic Approaches.” Journal of Heuristics 2 (3): 217–244.
- Scholl, A., M. Fliedner, and N. Boysen. 2010. “Absalom: Balancing Assembly Lines with Assignment Restrictions.” European Journal of Operational Research 200 (3): 688–701.
- Terwiesch, C., and R. E. Bohn. 2001. “Learning and Process Improvement during Production Ramp-up.” International Journal of Production Economics 70 (1): 1–19.
- Toksarı, M. D., S. K. İşleyen, E. Güner, and Ö. F. Baykoç. 2007. “Simple and U-type Assembly Line Balancing Problems with a Learning Effect.” Applied Mathematical Modelling 32 (12): 2954–2961.
- Tsuji, K. 1982. “Scale, Technology, and the Learning Curve.” In Scale in Production Systems, edited by J. A. Buzacott, M. F. Cantley, V. N. Gladolev, and R. C. Tomlinson. New York: Pergamon Press.
- Wee, T. S., and M. J. Magazine. 1982. “Assembly Line Balancing as Generalized Bin Packing.” Operations Research Letters 1 (2): 56–58.
- Wright, T. 1936. “Factors Affecting the Cost of Airplanes.” Journal of Aeronautical Science 3 (4): 122–128.
- Yelle, L. E. 1979. “The Learning Curve: Historical Review and Comprehensive Survey.” Decision Sciences 10 (2): 302–328.