589
Views
16
CrossRef citations to date
0
Altmetric
Articles

Available-to-promise-based flexible order allocation in ATO supply chains

&
Pages 6717-6738 | Received 09 Aug 2013, Accepted 24 Mar 2014, Published online: 22 Apr 2014

References

  • Akçay, Y., and S. H. Xu. 2004. “Joint Inventory Replenishment and Component Allocation Optimization in an Assemble-to-order System.” Management Science 50 (1): 99–116.10.1287/mnsc.1030.0167
  • Ball, M. O., M. Chen, and G. Souza. 2006. “Pseudo Order Consideration in Available to Promise (ATP).” Robert H. Smith School Research Paper No. RHS, 06-039. http://dx.doi.org/10.2139/ssrn.928958.
  • Ben-Daya, M., R. As’ad, and M. Seliaman. 2010. “An Integrated Production Inventory Model with Raw Material Replenishment Considerations in a Three Layer Supply Chain.” International Journal of Production Economics 143 (1): 53–61.
  • Cárdenas-Barrón, L. E., and J. D. Porter. 2013. “Supply Chain Models for an Assembly System with Preprocessing of Raw Materials: A Simple and Better Algorithm.” Applied Mathematical Modelling 37 (14–15): 7883–7887.10.1016/j.apm.2013.03.006
  • Cárdenas-Barrón, L. E., and G. Trevino-Garza. 2013. “An Optimal Solution to a Three Echelon Supply Chain Network with Multi-Product and Multi-period.” Applied Mathematical Modelling. http://dx.doi.org/10.1016/j.apm.2013.09.010.
  • Cárdenas-Barrón, L. E., J. T. Teng, G. Treviño-Garza, H. M. Wee, and K. R. Lou. 2012. “An Improved Algorithm and Solution on an Integrated Production-inventory Model in a Three-layer Supply Chain.” International Journal of Production Economics 136 (2): 384–388.10.1016/j.ijpe.2011.12.013
  • Chen, C. T., and S. B. Huang. 2006. “Order-fulfillment Ability Analysis in the Supply-chain System with Fuzzy Operation Times.” International Journal of Production Economics 101 (1): 185–193.10.1016/j.ijpe.2005.05.003
  • Chen, C. Y., Z. Y. Zhao, and M. O. Ball. 2001. “Quantity and Due Date Quoting Available to Promise.” Information Systems Frontiers 3 (4): 477–488.10.1023/A:1012837207691
  • Chen, C. Y., Z. Y. Zhao, and M. O. Ball. 2002. “A Model for Batch Advanced Available-to-promise.” Production and Operations Management 11 (4): 424–440.
  • Christou, I. T., and S. Ponis. 2009. “A Hierarchical System for Effective Coordination of Available-to-promise Logic Mechanisms.” International Journal of Production Research 47 (11): 3063–3078.10.1080/00207540701810786
  • Fan, Y. T., and Y. S. Chen. 2008. “System for Performing Resource Management and Control and Task Scheduling in Grid Computing.” Computer Science and Computational Technology 1 (10): 648–651.
  • Gao, L., S. H. Xu, and M. O. Ball. 2012. “Managing an Available-to-promise Assembly System with Dynamic Short-term Pseudo-order Forecast.” Management Science 58 (4): 770–790.10.1287/mnsc.1110.1442
  • Jeong, B., S. B. Sim, H. S. Jeong, and S. W. Kim. 2002. “An Available-to-promise System for TFT LCD Manufacturing in Supply Chain.” Computers & Industry Engineering 43 (2): 191–212.
  • Jung, H. 2012. “An Available-to-promise Process Considering Production and Transportation Uncertainties and Multiple Performance Measures.” International Journal of Production Research 50 (7): 1780–1798.10.1080/00207543.2011.561373
  • Jung, H., I. Song, B. J. Jeong, and W. Yoo. 2003. “A Optimized ATP System for Make-to-order Company in Supply Chain Environment.” Industrial Engineering-Theory Applications and Practice 10 (5): 367–374.
  • Lin, J. T., and J. H. Chen. 2006. “Enhance Order Promising with ATP Allocation Planning Considering Material and Capacity Constraints.” Journal of the Chinese Institute of Industrial Engineers 22 (4): 282–292.
  • Meyr, H. 2009. “Customer Segmentation, Allocation Planning and Order Promising in Make-to-stock Production.” OR Spectrum 31 (1): 229–256.10.1007/s00291-008-0123-x
  • Moon, C., Y. Seo, Y. Yun, and M. Gen. 2006. “Adaptive Genetic Algorithm for Advanced Planning in Manufacturing Supply Chain.” Journal of Intelligent Manufacturing 17 (4): 509–522.10.1007/s10845-005-0010-0
  • Ni, Y., J. Yao, and J. Li. 2013. “Integrated Optimization of Scheduling and Ordering Based on Semi-finished Goods Delayed Differentiation.” International Journal of Production Research. http://dx.doi.org/10.1080/00207543.2013.774479.
  • Pibernik, R. 2005. “Advanced Available-to-promise: Classification, Selected Methods and Requirements for Operations and Inventory Management.” International Journal of Production Economics 93–94 (8): 239–252.10.1016/j.ijpe.2004.06.023
  • Rahman, M. A. A., and B. R. Sarker. 2007. “Supply Chain Models for an Assembly System with Preprocessing of Raw Materials.” European Journal of Operational Research 181 (2): 733–752.10.1016/j.ejor.2006.08.015
  • Vasko, F. J., M. L. Cregger, L. G. Lutsko, D. D. Newhart, and D. J. Renn. 1990. “A Multiple-attribute-based Expert Support System for Customer/Order Evaluation.” The Journal of the Operational Research Society 41 (11): 1077–1080.
  • Xiong, M., S. B. Tor, Li Pheng Khoo, and C. H. Chen. 2003. “A Web-enhanced Dynamic BOM-based Available-to-promise System.” International Journal of Production Economics 84 (2): 133–147.10.1016/S0925-5273(02)00414-0
  • Yang, W., and Y. K. Fung. 2014. “An Available-to-promise Decision Support System for a Multi-site Make-to-order Production System.” International Journal of Production Research. http://dx.doi.org/10.1080/00207543.2013.877612.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.