190
Views
1
CrossRef citations to date
0
Altmetric
Articles

A novel relational approach for assembly system supply planning under environmental uncertainty

&
Pages 4007-4025 | Received 26 Feb 2013, Accepted 04 Apr 2014, Published online: 07 May 2014

References

  • Arda, Y., and J. C. Hennet. 2006. “Inventory Control in a Multi-supplier System.” International Journal of Production Economics 104 (2): 249–259.10.1016/j.ijpe.2004.09.008
  • Axsäter, S. 2005. “Planning Order Releases for an Assembly System with Random Operations Times.” OR Spectrum 27: 459–470.10.1007/s00291-004-0186-2
  • Axsäter, S. 2006. Inventory Control. 2nd ed. Berlin: Springer.
  • de la Banda, M. G., and P. J. Stuckey. 2007. “Dynamic Programming to Minimize the Maximum Number of Open Stacks.” INFORMS Journal on Computing 19 (4): 607–617.10.1287/ijoc.1060.0205
  • Bortolotti, T., P. Danese, and P. Romano. 2013. “Assessing the Impact of Just-in-time on Operational Performance at Varying Degrees of Repetitiveness.” International Journal of Production Research 51 (4): 1117–1130.10.1080/00207543.2012.678403
  • Danese, P., P. Romano, and T. Bortolotti. 2012. “JIT Production, JIT Supply and Performance: Investigating the Moderating Effects.” Industrial Management & Data Systems 112 (3): 441–465.
  • Dolgui, A., and M.-A. Louly. 2002. “A Model for Supply Planning under Lead Time Uncertainty.” International Journal of Production Economics 78: 145–152.10.1016/S0925-5273(00)00180-8
  • Dolgui, A., and C. Prodhon. 2007. “Supply Planning under Uncertainties in MRP Environments: A State of the Art.” Annual Reviews in Control 31 (2): 269–279.10.1016/j.arcontrol.2007.02.007
  • Dolgui, A., M.-A. Louly, and C. Prodhon. 2005. “A Survey on Supply Planning under Uncertainties in MRP Environments.” In Selected Plenaries, Milestones and Surveys. 16th IFAC World Congress, edited by P. Horacek, M. Simandl, and P. Zitek, 228–239. Elsevier: Oxford, Prague, Czech Republic, July 3–8.
  • Fox, M. S., M. Barbuceanu, and R. Teigen. 2000. “Agent-oriented Supply Chain Management.” International Journal of Flexible Manufacturing Systems 12: 165–188.10.1023/A:1008195614074
  • Fujiwara, O., and D. Sedarage. 1997. “An Optimal (Q, r) Policy for a Multipart Assembly System under Stochastic Part Procurement Lead Times.” European Journal of Operational Research 100: 550–556.10.1016/S0377-2217(96)00230-5
  • Hojati, M. 2004. “Bridging the Gap between Probabilistic and Fuzzy-parameter EOQ Models.” International Journal of Production Economics 91: 215–221.10.1016/j.ijpe.2003.08.011
  • Kadipasaoglu, S. N., and S. V. Sridharan. 1997. “Measurement of Instability in Multi-level MRP Systems.” International Journal of Production Research 35: 713–737.10.1080/002075497195678
  • de Kok, T. G., and J. W. C. H. Visschers. 1999. “Analysis of Assembly Systems with Service Level Constraints.” International Journal of Production Economics 59: 313–326.10.1016/S0925-5273(98)00236-9
  • Louly, M. A., and A. Dolgui. 2008. “An Optimization Approach for Time Phasing in MRP Systems.” Preprints of the Fifteen International Working Seminar on Production Economics, Vol. 3, 273–280, Innsbruck, Austria.
  • Louly, M. A., A. Dolgui, and F. Hnaien. 2008a. “Optimal Supply Planning in MRP Environments for Assembly Systems with Random Component Procurement times.” International Journal of Production Research 46 (19): 5441–5467.10.1080/00207540802273827
  • Louly, M. A., A. Dolgui, and F. Hnaien. 2008b. “Supply Planning for Single-level Assembly System with Stochastic Component Delivery times and Service-level Constraint.” International Journal of Production Economics 115 (1): 236–247.10.1016/j.ijpe.2008.06.005
  • Louly, M. A., A. Dolgui, and A. Al-Ahmari. 2012. “Optimal MRP Offsetting for Assembly Systems with Stochastic Lead times: POQ Policy and Service Level Constraint.” Journal of Intelligent Manufacturing 23: 2485–2495.10.1007/s10845-011-0515-7
  • Molinder, A. 1997. “Joint Optimisation of Lot-sizes, Safety Stocks and Safety Lead times in an MRP System.” International Journal of Production Research 35: 983–994.10.1080/002075497195498
  • Mula, J., R. Poler, J. P. García-Sabater, and F. C. Lario. 2006. “Models for Production Planning under Uncertainty: A Review.” International Journal of Production Economics 103: 271–285.10.1016/j.ijpe.2005.09.001
  • Ould-Louly, M. A., and A. Dolgui. 2002. “Generalized Newsboy Model to Compute the Optimal Planned Lead Times in Assembly Systems.” International Journal of Production Research 40: 4401–4414.10.1080/00207540210158825
  • Ould-Louly, M. A., and A. Dolgui. 2004. “The MPS Parameterization under Lead Time Uncertainty.” International Journal of Production Economics 90: 369–376.10.1016/j.ijpe.2003.08.008
  • Petrovic, D. 2001. “Simulation of Supply Chain Behaviour and Performance in an Uncertain Environment.” International Journal of Production Economics 71: 429–438.10.1016/S0925-5273(00)00140-7
  • Proth, J. M., G. Mauroy, Y. Wardi, and C. Chu. 1997. “Supply Management for Cost Minimization in Assembly Systems with Random Component Yield Times.” Journal of Intelligent Manufacturing 8: 385–403.10.1023/A:1018506232008
  • Rosling, K. 1989. “Optimal Inventory Policies for Assembly Systems under Random Demands.” Operations Research 37: 365–379.
  • Samanta, B., and S. A. Al-Araimi. 2001. “An Inventory Control Model Using Fuzzy Logic.” International Journal of Production Economics 73: 217–226.10.1016/S0925-5273(00)00185-7
  • Xie, J., X. Zhao, and T. S. Lee. 2003. “Freezing the Master Production Schedule under Single Resource Constraint and Demand Uncertainty.” International Journal of Production Economics 83: 65–84.10.1016/S0925-5273(02)00262-1
  • Yano, C. A. 1987. “Setting Planned Lead Times in Serial Production Systems with Tardiness Costs.” Management Science 33 (1): 95–106.10.1287/mnsc.33.1.95
  • Yeung, J. H. Y., W. C. K. Wong, and L. Ma. 1998. “Parameters Affecting the Effectiveness of MRP Systems: A Review.” International Journal of Production Research 36: 313–332.10.1080/002075498193750

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.