600
Views
9
CrossRef citations to date
0
Altmetric
Articles

Labour productivity in modular assembly: a study of automotive module suppliers

, &
Pages 6954-6970 | Received 04 Apr 2012, Accepted 15 Apr 2014, Published online: 21 May 2014

References

  • Alford, D., P. Sackett, and G. Nelder. 2000. “Mass Customisation – An Automotive Perspective.” International Journal of Production Economics 65 (1): 99–110.10.1016/S0925-5273(99)00093-6
  • Andrian, E., M. Coronado, and Andrew C.L. Lyons. 2008. “Investigating the Implications of Extending Synchronized Sequencing in Automotive Supply Chains: The Case of Suppliers in the European Automotive Sector.” International Journal of Production Research 46 (11): 2867–2888.
  • Baldwin, C. Y., and K. B. Clark. 1997. “Managing in the Age of Modularity.” Harvard Business Review 75: 84–93.
  • Boysen, N., M. Fliedner, and A. Scholl. 2008. “Assembly Line Balancing: Which Model to Use When?” International Journal of Production Economics 111 (2): 509–528.10.1016/j.ijpe.2007.02.026
  • Bukchin, J., E. Darel, and J. Rubinovitz. 1997. “Team-oriented Assembly System Design: A New Approach.” International Journal of Production Economics 51 (1–2): 47–57.10.1016/S0925-5273(97)00060-1
  • Calcagno, M. 2002. “Dynamics of Modularity. A Critical Approach.” Euram Conference, Stockholm, May, 9–11, 1–11.
  • Chryssolouris, G., N. Papakostas, and D. Mavrikios. 2008. “A Perspective on Manufacturing Strategy: Produce More with Less.” CIRP Journal of Manufacturing Science and Technology 1 (1): 45–52.10.1016/j.cirpj.2008.06.008
  • Doran, D. 2002. “Manufacturing for Synchronous Supply: A Case Study of Ikeda Hoover Ltd.” Integrated Manufacturing Systems 13 (1): 18–24.10.1108/09576060210411477
  • Engström, T., D. Jonsson, and L. Medbo. 1998. “The Volvo Uddevalla Plant and Interpretations of Industrial Design Processes.” Integrated Manufacturing Systems 9 (5): 279–295.10.1108/09576069810230392
  • Faria, J. A. 2008. “A Canonical Model for the Analysis of Manufacturing Systems.” Production Planning & Control 19 (7): 632–644.10.1080/09537280802571522
  • Fredriksson, P. 2002. “Modular Assembly in the Car Industry – An Analysis of Organizational forms’ Influence on Performance.” European Journal of Purchasing & Supply Management 8 (4): 221–233.
  • Fredriksson, P. 2006. “Operations and Logistics Issues in Modular Assembly Processes: Cases from the Automotive Sector.” Journal of Manufacturing Technology Management 17 (2): 168–186.10.1108/17410380610642250
  • Fredriksson, P., and L. E. Gadde. 2005. “Flexibility and Rigidity in Customization and Build-to-Order Production.” Industrial Marketing Management 34 (7): 695–705.10.1016/j.indmarman.2005.05.010
  • Ghosh, S., and R. J. Gagnon. 1989. “A Comprehensive Literature Review and Analysis of the Design, Balancing and Scheduling of Assembly Systems.” International Journal of Production Research 27 (4): 637–670.10.1080/00207548908942574
  • Groover, M. P. 2008. Automation, Production Systems, and Computer-integrated Manufacturing. Singapore: Prentice Hall.
  • Helper, S., J. P. MacDuffie, and C. Sabel. 2000. “Pragmatic Collaborations: Advancing Knowledge While Controlling Opportunism.” Industrial and Corporate Change 9 (3): 443–488.10.1093/icc/9.3.443
  • Johnson, D. J. 2005. “Converting Assembly Lines to Assembly Cells at Sheet Metal Products: Insights on Performance Improvements.” International Journal of Production Research 43 (7): 1483–1509.10.1080/00207540412331299594
  • Kim, S., and B. Jeong. 2007. “Product Sequencing Problem in Mixed-Model Assembly Line to Minimize Unfinished Works.” Computers & Industrial Engineering 53 (2): 206–214.10.1016/j.cie.2007.06.011
  • Larsson, A. 2002. “The Development and Regional Significance of the Automotive Industry: Supplier Parks in Western Europe.” International Journal of Urban and Regional Research 26 (4): 767–784.10.1111/ijur.2002.26.issue-4
  • Law, A. M., and W. D. Kelton. 2000. Simulation Modelling and Analysis. Singapore: McGraw-Hill.
  • McAlinden, S. P., B. C. Smith, and B. F. Swiecki. 2000. The Future of Modular Automotive Systems: Where Are the Economic Efficiencies in the Modular Assembly Concept. Report No. 2000-24-1. Ann Arbor, MI: University of Michigan Transportation Research Institute.
  • Sako, M. 2003. “Modularity and Outsourcing: The Nature of Co-evolution of Product Architecture and Organization Architecture in the Global Automotive Industry.” In The Business of Systems Integration, edited by A. Prencipe, A. Davies and M. Hobday, 29–253. Oxford: Oxford University Press.
  • Sako, M., and F. Murray. 1999. “Modules in Design, Production and Use: Implications for the Global Automotive Industry.” International Motor Vehicle Program (IMVP) Annual Sponsors Meeting, Cambridge, MA, October 5–7, 1999.
  • Sako, M., and M. Warburton. 1999. “MIT International Motor Vehicle Programme Modularization and Outsourcing Project Preliminary Report of European Research Team.” International Motor Vehicle Program (IMVP) Annual Forum, Boston, MA, October 6–7, 1999.
  • Scholl, A. 1999. Balancing and sequencing assembly lines. 2nd rev ed. Heidelberg: Physica-Verlag.
  • Sengupta, K., and F. R. Jacobs. 2004. “Impact of Work Teams: A Comparison Study of Assembly Cells and Assembly Line for a Variety of Operating Environments.” International Journal of Production Research 42 (19): 4173–4193.10.1080/00207540410001720421
  • Starr, M. K. 1965. “Modular Production – A New Concept.” Harvard Business Review 43 (6): 131–142.
  • Suer, G. A., and R. R. Tummaluri. 2008. “Multi-period Operator Assignment Considering Skills, Learning and Forgetting in Labour-intensive Cells.” International Journal of Production Research 46 (2): 469–493.10.1080/00207540601138551
  • Veloso, F., and R. Kumar. 2002. “The Automotive Supply Chain: Global Trends and Asian Perspectives.” Asian Development Bank ERD Working Paper Series, January, 3.
  • Yamada, T., K. Satomi, and M. Matsui. 2006. “Strategic Selection of Assembly Systems under Viable Demands.” Assembly Automation 26 (4): 335–342.10.1108/01445150610705254

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.