533
Views
8
CrossRef citations to date
0
Altmetric
Articles

Project network-oriented materials management policy for complex projects: a Fuzzy Set Theoretic approach

, &
Pages 2904-2920 | Received 05 Feb 2014, Accepted 21 Jul 2014, Published online: 26 Aug 2014

References

  • Abad, P. L. 1996. “Optimal Pricing and Lot-sizing under Conditions of Perishability and Partial Backordering.” Management Science 42 (8): 1093–1104.10.1287/mnsc.42.8.1093
  • Ala-Risku, T., J. Collin, J. Holmström, and J. P. Vuorinen. 2010. “Site Inventory Tracking in the Project Supply Chain: Problem Description and Solution Proposal in a Very Large Telecom Project.” Supply Chain Management: An International Journal 15 (3): 252–260.10.1108/13598541011040008
  • Alfieri, A., T. Tolio, and M. Urgo. 2012. “A Project Scheduling Approach to Production and Material Requirement Planning in Manufacturing-to-order Environments.” Journal of Intelligent Manufacturing 23 (3): 575–585.10.1007/s10845-010-0396-1
  • Bensaou, M. 1999. “Portfolios of Buyer–Supplier Relationships.” Sloan Management Review 40 (4): 35–44.
  • Bonissone, P. P., and K. S. Decker. 1986. “Selecting Uncertainty Calculi and Granularity: An Experiment in Trading-off Precision and Complexity.” Uncertainty in Artificial Intelligence 217–247.10.1016/B978-0-444-70058-2.50021-8
  • Botter, R., and L. Fortuin. 2000. “Stocking Strategy for Service Parts – A Case Study.” International Journal of Operations & Production Management 20 (6): 656–674.10.1108/01443570010321612
  • Buffa, E. S. 1983. Modern Production and Operations Management (Vol. 7). New York: Wiley.
  • Cabrerizo, F. J., S. Alonso, and E. V. Herrera-Viedma. 2009. “A Consensus Model for Group Decision Making Problems with Unbalanced Fuzzy Linguistic Information.” International Journal of Information Technology and Decision Making 8 (1): 109–131.10.1142/S0219622009003296
  • Cakir, O., and M. S. Canbolat. 2008. “A Web-based Decision Support System for Multi-criteria Inventory Classification Using Fuzzy AHP Methodology.” Expert Systems with Applications 35 (3): 1367–1378.10.1016/j.eswa.2007.08.041
  • Chen, Chen-Tung, and S. F. Huang. 2007. “Applying Fuzzy Method for Measuring Criticality in Project Network.” Information Sciences 177 (12): 2448–2458.10.1016/j.ins.2007.01.035
  • Chu, W., Y. Li, C. Liu, W. Mou, and L. Tang. 2014. “A Manufacturing Resource Allocation Method with Knowledge-based Fuzzy Comprehensive Evaluation for Aircraft Structural Parts.” International Journal of Production Research 52 (11): 1–20.
  • Chu, C. W., G. S. Liang, and C.-T. Liao. 2008. “Controlling Inventory by Combining ABC Analysis and Fuzzy Classification.” Computers & Industrial Engineering 55 (4): 841–851.
  • Dhalla, N. 2008. “Evaluating Shortage Cost in a Dynamic Environment.” Thesis (Masters), MIT Sloan School of Management and Engineering Systems Division.
  • Dixit, V., R. K. Srivastava, and A. Chaudhuri. 2013a. “Integrating Materials Management with Project Management of Complex Projects.” Journal of Advances in Management Research 10 (2): 230–278.10.1108/JAMR-05-2013-0031
  • Dixit, V., R. K. Srivastava, and A. Chaudhuri. 2013b. “Procurement Scheduling for Complex Projects with Fuzzy Activity Durations and Lead Times.” Computers & Industrial Engineering. http://dx.doi.org/10.1016/j.cie.2013.12.009.
  • Flores, B. E., and D. C. Whybark. 1986. “Multiple Criteria ABC Analysis.” International Journal of Operations and Production Management 6 (3): 38–46.10.1108/eb054765
  • Herrera, F., and L. Martinez. 2000. “An Approach for Combining Linguistic and Numerical Information Based on the 2-tuple Fuzzy Linguistic Representation Model in Decision Making.” International Journal of Uncertainty, Fuzziness and Knowledge Based Systems 8 (5): 539–562.10.1142/S0218488500000381
  • Herrera, F., L. Martı́nez, and P. J. Sánchez. 2005. “Managing Non-homogeneous Information in Group Decision Making.” European Journal of Operational Research 166 (1): 115–132.10.1016/j.ejor.2003.11.031
  • Huiskonen, J. 2001. “Maintenance Spare Parts Logistics: Special Characteristics and Strategic Choices.” International Journal of Production Economics 71 (1–3): 125–133.10.1016/S0925-5273(00)00112-2
  • Kraljic, P. 1983. “Purchasing Must Become Supply Management.” Harvard Business Review 61 (5): 109–117.
  • Leeuw, S., and J. Fransoo. 2009. “Drivers of Close Supply Chain Collaboration: One Size Fits All?” International Journal of Operations and Production Management 29 (7): 720–739.10.1108/01443570910971397
  • Li, L. 1992. “The Role of Inventory in Delivery-time Competition.” Management Science 38 (2): 182–197.10.1287/mnsc.38.2.182
  • Mamdani, E. H., and S. Assilian. 1975. “An Experiment in Linguistic Synthesis with a Fuzzy Logic Controller.” International Journal of Man-Machine Studies 7 (1): 1–13.10.1016/S0020-7373(75)80002-2
  • Miller, G. A. 1956. “The Magical Number Seven, Plus or Minus Two: Some Limits on Our Capacity for Processing Information.” Psychological Review 63: 81–97.10.1037/h0043158
  • Molenaers, A., H. Baets, L. Pintelon, and G. Waeyenbergh. 2012. “Criticality Classification of Spare Parts: A Case Study.” International Journal of Production Economics 140 (2): 570–578.10.1016/j.ijpe.2011.08.013
  • Oliver, J. 1993. Estimating the EOQ Shortage Cost Parameter: A Partial Backlogging Approach. Philadelphia, PA: Department of Decision Sciences, The Wharton School University of Pennsylvania.
  • Olsen, R. F., and L. M. Ellram. 1997. “A Portfolio Approach to Supplier Relationships.” Industrial Marketing Management 26 (2): 101–113.10.1016/S0019-8501(96)00089-2
  • Ramanathan, R. 2006. “ABC Inventory Classification with Multiple-criteria Using Weighted Linear Optimization.” Computers & Operations Research 3 (3): 695–700.
  • Ronen, B., and D. A. Trietsch. 1988. “A Decision Support System for Purchasing Management of Large Projects.” Operations Research 36 (6): 882–890.10.1287/opre.36.6.882
  • Said, H., and K. El-Rayes. 2011. “Optimizing Material Procurement and Storage on Construction Sites.” Journal of Construction Engineering and Management 137 (6): 421–431.10.1061/(ASCE)CO.1943-7862.0000307
  • San Jose, L. A., J. Sicilia, and L. J. Garcia. 2005. “The Lot Size-reorder Level Inventory System with Customer’s Impatience Functions.” Computers & Industrial Engineering 49 (3): 349–362.
  • Sarker, R., and A. Haque. 2000. “Optimization of Maintenance and Spare Provisioning Policy Using Simulation.” Applied Mathematical Modelling 24 (10): 751–760.10.1016/S0307-904X(00)00011-1
  • Sicilia, J., San Jose, L. A., Garcia, L. J. 2007. “An Inventory Model with -Rational Type- Backlogged Demand Rate and Quadratic Backlogging Cost.” Industrial Engineering and Engineering Management, IEEE International Conference. http://ieeexplore.ieee.org/xpl/login.jsp?tp=&arnumber=4419334&url=http%3A%2F%2Fieeexplore.ieee.org%2Fxpls%2Fabs_all.jsp%3Farnumber%3D4419334.
  • Sicilia, J., L. A. San Jose, and L. J. Garcia. 2009. “An Optimal Replenishment Policy for an EOQ Model with Partial Backordering.” Annals of Operations Research 169 (1): 93–116.
  • Wang, L., Y. Zeng, J. Zhang, W. Huang, and Y. Bao. 2006. “The Criticality of Spare Parts Evaluating Model Using Artificial Neural Network Approach.” Computational Science – ICCS 728–735. http://link.springer.com/chapter/10.1007/11758501_97.
  • Yager, R. R. 1988. “On Ordered Weighted Averaging Aggregation Operators in Multicriteria Decisionmaking.” IEEE Transactions on Systems, Man and Cybernetics 18 (1): 183–190.10.1109/21.87068
  • Yager, R. R. 1996. “Quantifier Guided Aggregation Using OWA Operators.” International Journal of Intelligent Systems 11 (1): 49–73.10.1002/(SICI)1098-111X(199601)11:1<49::AID-INT3>3.3.CO;2-L
  • Yeo, K. T., and J. H. Ning. 2002. “Integrating Supply Chain and Critical Chain Concepts in Engineer-procure-construct (EPC) Projects.” International Journal of Project Management 20 (4): 253–262.10.1016/S0263-7863(01)00021-7
  • Yeo, K. T., and J. H. Ning. 2006. “Managing Uncertainty in Major Equipment Procurement in Engineering Projects.” European Journal of Operational Research 171 (1): 123–134.10.1016/j.ejor.2004.06.036
  • Yu, M. C. 2011. “Multi-criteria ABC Analysis Using Artificial-intelligence-based Classification Techniques.” Expert Systems with Applications 38 (4): 3416–3421.10.1016/j.eswa.2010.08.127

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.