7,923
Views
4
CrossRef citations to date
0
Altmetric
Articles

Family-based dispatching with parallel machines

Pages 5837-5856 | Received 09 Jul 2014, Accepted 26 Nov 2014, Published online: 16 Feb 2015

References

  • Allahverdi, A., J. N. D. Gupta, and T. Alsdowaisan. 1999. “A Review of Scheduling Research Involving set-up Considerations.” Omega 27 (2): 219–239.
  • Allahverdi, A., C. T. Ng, T. C. E. Cheng, and M. Y. Kovalyov. 2008. “A Survey of Scheduling Problems with Setup Times or Costs.” European Journal of Operational Research 187: 985–1032.10.1016/j.ejor.2006.06.060
  • Blackstone, J. H., D. T. Phillips, and G. L. Hogg. 1982. “A State-of-the-Art Survey of Dispatching Rules for Manufacturing Job Shop Operations.” International Journal of Production Research 20 (1): 27–45.10.1080/00207548208947745
  • Chern, C. C., and Y. L. Liu. 2003. “Family-based Scheduling Rules of a Sequence-dependent Wafer Fabrication System.” IEEE Transactions on Semiconductor Manufacturing 16 (1): 15–25.10.1109/TSM.2002.807742
  • Ciavotta, M., P. Detti, C. Meloni, and M. Pranzo. 2008. “A Bi-objective Coordination Setup Problem in a Two-stage Production System.” European Journal of Operational Research 189: 734–745.10.1016/j.ejor.2006.09.102
  • Ciavotta, M., C. Meloni, and M. Pranzo. 2009. “Scheduling Dispensing and Counting in Secondary Pharmaceutical Manufacturing.” AIChE Journal 55 (5): 1161–1170.10.1002/aic.v55:5
  • Ciavotta, M., C. Meloni, and M. Pranzo. 2013. “Minimising General Setup Costs in a Two-stage Production System.” International Journal of Production Research 51 (8): 2268–2280.10.1080/00207543.2012.716172
  • Detti, P., C. Meloni, and M. Pranzo. 2007. “Minimizing and Balancing Setups in a Serial Production System.” International Journal of Production Research 45 (24): 5769–5788.10.1080/00207540701636306
  • Flynn, B. B. 1987. “Repetitive Lots: The Use of a Sequence-dependent Set-up Time Scheduling Procedure in Group Technology and Traditional Shops.” Journal of Operations Management 7 (1–2): 203–216.10.1016/0272-6963(87)90017-9
  • Frazier, G. V. 1996. “An Evaluation of Group Scheduling Heuristics in a Flow-line Manufacturing Cell.” International Journal of Production Research 34 (4): 959–976.10.1080/00207549608904945
  • Gavett, J. W. 1965. “Three Heuristic Rules for Sequencing Jobs to a Single Production Facility.” Management Science 11 (8): B-166–B-176.10.1287/mnsc.11.8.B166
  • Groover, M. P. 2008. Automation, Production Systems, and Computer-Integrated Manufacturing. 3rd ed. New York: Prentice Hall.
  • Hopp, W. J., and M. L. Spearman. 2008. Factory Physics. 3rd ed. Boston, MA: McGrawHill.
  • IBM. 2008. SPSS 22.0 for Windows Software Package. Chicago, IL.
  • Jayamohan, M. S., and C. Rajendran. 2000. “New Dispatching Rules for Shop Scheduling: A Step Forward.” International Journal of Production Research 38 (3): 563–586.10.1080/002075400189301
  • Jensen, J. B., M. K. Malhotra, and P. R. Philipoom. 1996. “Machine Dedication and Process Flexibility in a Group Technology Environment.” Journal of Operations Management 14 (1): 19–39.10.1016/0272-6963(95)00030-5
  • Jensen, J. B., M. K. Malhotra, and P. R. Philipoom. 1998. “Family-based Scheduling of Shops with Functional Layouts.” International Journal of Production Research 36 (10): 2687–2700.10.1080/002075498192436
  • Kannan, V. R. 1998. “Analysing the Trade-off between Efficiency and Flexibility in Cellular Manufacturing Systems.” Production Planning & Control 9 (6): 572–579.
  • Kochhar, S., and R. J. T. Morris. 1987. “Heuristic Methods for Flexible Flow Line Scheduling.” Journal of Manufacturing Systems 6 (4): 299–314.10.1016/0278-6125(87)90006-9
  • Law, A. M., and W. D. Kelton. 2000. Simulation Modeling and Analysis. Boston, MA: McGraw-Hill.
  • Mahmoodi, F., and K. J. Dooley. 1991. “A Comparison of Exhaustive and Non-exhaustive Group Scheduling Heuristics in a Manufacturing Cell.” International Journal of Production Research 29 (9): 1923–1939.10.1080/00207549108948058
  • Mahmoodi, F., K. J. Dooley, and P. J. Starr. 1990. “An Investigation of Dynamic Group Scheduling Heuristics in a Job Shop Manufacturing Cell.” International Journal of Production Research 28 (9): 1695–1711.10.1080/00207549008942824
  • Marsh, R. F., S. M. Shafer, and J. R. Meredith. 1999. “A Comparison of Cellular Manufacturing Research Presumptions with Practice.” International Journal of Production Research 37 (14): 3119–3138.10.1080/002075499190202
  • McKay, K. M., F. R. Safayeni, and J. A. Buzacott. 1988. “Job-shop Scheduling Theory: What is Relevant?” Interfaces 18 (4): 84–90.10.1287/inte.18.4.84
  • Mizrak, P., and G. Bayhan. 2006. “Comparative Study of Dispatching Rules in a Real-life Job Shop Environment.” Applied Artificial Intelligence 20: 585–607.10.1080/08839510600779738
  • Mosier, C. T., D. A. Elvers, and D. Kelly. 1984. “Analysis of Group Technology Scheduling Heuristics.” International Journal of Production Research 22 (5): 857–875.10.1080/00207548408942505
  • Nomden, G., and D. J. van der Zee. 2008. “Virtual Cellular Manufacturing: Configuring Routing Flexibility.” International Journal of Production Economics 112 (1): 439–451.10.1016/j.ijpe.2007.04.010
  • Nomden, G., D. J. van Der Zee, and J. Slomp. 2008. “Family-based Dispatching: Anticipating Future Jobs.” International Journal of Production Research 46 (1): 73–97.10.1080/00207540500517749
  • Pickardt, C. W., and J. Branke. 2012. “Setup-oriented Dispatching Rules – A Survey.” International Journal of Production Research 50 (20): 5823–5843.
  • Pinedo, M. 1995. Scheduling: Theory, Algorithms, and Systems. Englewood Cliffs, NJ: Prentice-Hall.
  • Pinedo, M. 2005. Planning and Scheduling in Manufacturing and Services. New York: Springer.
  • Ponnambalam, S. G., P. Aravindan, and K. R. R. Reddy. 1999. “Analysis of Group-scheduling Heuristics in a Manufacturing Cell.” The International Journal of Advanced Manufacturing Technology 15 (12): 914–932.10.1007/s001700050149
  • Robinson, J. K., J. W. Fowler, and J. F. Bard. 1995. “The Use of Upstream and Downstream Information in Scheduling Semiconductor Batch Operations.” International Journal of Production Research 33 (7): 1343–1369.
  • Ruben, R. A., C. T. Mosier, and F. Mahmoodi. 1993. “A Comprehensive Analysis of Group Scheduling Heuristics in a Job Shop Cell.” International Journal of Production Research 31 (6): 1343–1369.10.1080/00207549308956795
  • Russell, G. R., and P. R. Philipoom. 1991. “Sequencing Rules and Due Date Setting Procedures in Flow Line Cells with Family Setups.” Journal of Operations Management 10 (4): 524–545.10.1016/0272-6963(91)90009-M
  • Sarin, S. C., A. Varadarajan, and L. Wang. 2011. “A Survey of Dispatching Rules for Operational Control in Wafer Fabrication.” Production Planning & Control 22 (1): 4–24.
  • Shambu, G., N. C. Suresh, and C. C. Pegels. 1996. “Performance Evaluation of Cellular Manufacturing Systems: A Taxonomy and Review of Research.” International Journal of Operations and Production Management 16 (8): 81–103.10.1108/01443579610125796
  • Siemens PLM Software. 2011. Plant SimulationTM 10.0. Stuttgart.
  • Stuber, F. 1998. “Approaches to Shop Floor Scheduling – A Critical Review.” In Shop Floor Control – A Systems Perspective, edited by E. Scherer, 201–220. Berlin: Springer.
  • Van der Zee, D. J. 2002. “Adaptive Scheduling of Batch Servers in Flow Shops.” International Journal of Production Research 40 (12): 2811–2833.10.1080/00207540210136559
  • Van der Zee, D. J. 2010. “Non-exhaustive Family Based Dispatching Heuristics–Exploiting Variances of Processing and Set-up Times.” International Journal of Production Research 48 (13): 3783–3802.10.1080/00207540902927926
  • Van der Zee, D. J., G. J. C. Gaalman, and G. Nomden. 2011. “Family Based Dispatching in Manufacturing Networks.” International Journal of Production Research 49 (23): 7059–7084.10.1080/00207543.2010.537704
  • Wemmerlov, U. 1992. “Fundamental Insights into Part Family Scheduling: The Single Machine Case.” Decision Sciences 23 (3): 565–595.10.1111/deci.1992.23.issue-3
  • Wemmerlov, U., and A. J. Vakharia. 1991. “Job and Family Scheduling of a Flow-Line Manufacturing Cell: A Simulation Study.” IIE Transactions 23 (4): 383–393.10.1080/07408179108963871

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.