572
Views
22
CrossRef citations to date
0
Altmetric
Articles

Integrated production, distribution and scheduling in the aluminium industry: a continuous-time MILP model and decomposition method

Pages 5912-5930 | Received 10 Jun 2014, Accepted 01 Feb 2015, Published online: 01 Apr 2015

References

  • Agarwal, R., and O. Ergun. 2008. “Ship Scheduling and Network Design for Cargo Routing in Liner Shipping.” Transportation Science 42 (2): 175–196.10.1287/trsc.1070.0205
  • Alizadeh, A., and N. Nomikos. 2009. Shipping Derivatives and Risk Management. Basingstoke: Palgrave Macmillan.10.1057/9780230235809
  • Alonso-Ayuso, A., L. F. Escudero, and C. Pizarro. 2009. “On SIP Algorithms for Minimizing the Mean-risk Function in the Multi-period Single-source Problem Under Uncertainty.” Annals of Operations Research 166 (1): 223–242.10.1007/s10479-008-0411-5
  • Amorim, P., H.-O. Günther, and B. Almada-Lobo. 2012. “Multi-objective Integrated Production and Distribution Planning of Perishable Products.” International Journal of Production Economics 138 (1): 89–101.10.1016/j.ijpe.2012.03.005
  • Azoury, K. S., and J. Miyaoka. 2013. “Managing Production and Distribution for Supply Chains in the Processed Food Industry.” Production and Operations Management 22 (5): 1250–1268.
  • Cardarelli, F. 2008. Materials Handbook: A Concise Desktop Reference. 2nd ed. London: Springer.
  • Chang, Y.-C., K.-H. Chang, and T.-K. Chang. 2013. “Applied Column Generation-based Approach to Solve Supply Chain Scheduling Problems.” International Journal of Production Research 51 (13): 4070–4086.10.1080/00207543.2013.774476
  • Dillenberger, C., L. F. Escudero, A. Wollensak, and W. Zhang. 1994. “On Practical Resource Allocation for Production Planning and Scheduling with Period Overlapping Setups.” European Journal of Operational Research 75 (2): 275–286.10.1016/0377-2217(94)90074-4
  • Ekşioğlu, S. D., B. Ekşioğlu, and H. E. Romeijn. 2007. “A Lagrangean Heuristic for Integrated Production and Transportation Planning Problems in a Dynamic, Multi-item, Two-layer Supply Chain.” IIE Transactions 39 (2): 191–201.
  • Escudero, L. F., and J. Salmeron. 2005. “On a Fix-and-relax Framework for a Class of Project Scheduling Problems.” Annals of Operations Research 140 (1): 163–188.10.1007/s10479-005-3970-8
  • Federgruen, A., J. Meissner, and M. Tzur. 2007. “Progressive Interval Heuristics for Multi-item Capacitated Lot-sizing Problems.” Operations Research 55 (3): 490–502.10.1287/opre.1070.0392
  • Ferreira, D., R. Morabito, and S. Rangel. 2009. “Solution Approaches for the Soft Drink Integrated Production Lot Sizing and Scheduling Problem.” European Journal of Operational Research 196 (2): 697–706.10.1016/j.ejor.2008.03.035
  • GAMS. 2012. GAMS – The Solver Manuals. Distribution 23.8. Washington, DC: CreateSpace Independent Publishing Platform.
  • Hwang, H. S., S. Visoldilokpun, and J. M. Rosenberger. 2008. “A Branch-and-price-and-cut Method for Ship Scheduling with Limited Risk.” Transportation Science 42 (3): 336–351.10.1287/trsc.1070.0218
  • Lim, A., F. Wang, and Z. Xu. 2006. “A Transportation Problem with Minimum Quantity Commitment.” Transportation Science 40 (1): 117–129.10.1287/trsc.1050.0123
  • Low, C., R.-K. Li, and C.-M. Chang. 2013. “Integrated Scheduling of Production and Delivery with Time Windows.” International Journal of Production Research 51 (3): 897–909.10.1080/00207543.2012.677071
  • Marinelli, F., S. Nocella, F. Rossi, and S. Smriglio. 2011. “A Lagrangian Heuristic for Satellite Range Scheduling with Resource Constraints.” Computers & Operations Research 38 (11): 1572–1583.
  • Meyr, H., and M. Mann. 2013. “A Decomposition Approach for the General Lotsizing and Scheduling Problem for Parallel Production Lines.” European Journal of Operational Research 229 (3): 718–731.10.1016/j.ejor.2013.03.036
  • Mohammadi, M., and S. M. T. Fatemi Ghomi. 2010. “Relax and Fix Heuristics for Simultaneous Lot Sizing and Sequencing the Permutation Flow Shops with Sequence-dependent Setups.” International Journal of Industrial Engineering & Production Research 21 (3): 147–153.
  • Mohammadi, M., and N. Jafari. 2011. “A New Mathematical Model for Integrating Lot Sizing, Loading, and Scheduling Decisions in Flexible Flow Shops.” The International Journal of Advanced Manufacturing Technology 55 (5–8): 709–721.10.1007/s00170-010-3101-9
  • Mohammadi, M., S. M. T. Fatemi Ghomi, B. Karimi, and S. A. Torabi. 2010. “Rolling-horizon and Fix-and-relax Heuristics for the Multi-product Multi-level Capacitated Lotsizing Problem with Sequence-dependent Setups.” Journal of Intelligent Manufacturing 21 (4): 501–510.10.1007/s10845-008-0207-0
  • Mohammadi, G., A. Karampourhaghghi, and F. Samaei. 2012. “A Multi-objective Optimisation Model to Integrating Flexible Process Planning and Scheduling Based on Hybrid Multi-objective Simulated Annealing.” International Journal of Production Research 50 (18): 5063–5076.10.1080/00207543.2011.631602
  • Mokhtari, H., I. N. K. Abadi, and M. R. Amin-Naseri. 2012. “Production Scheduling with Outsourcing Scenarios: A Mixed Integer Programming and Efficient Solution Procedure.” International Journal of Production Research 50 (19): 5372–5395.10.1080/00207543.2011.627687
  • Noor-E-Alam, M. D., and J. Doucette. 2012. “Relax-and-fix Decomposition Technique for Solving Large Scale Grid-based Location Problems.” Computers & Industrial Engineering 63 (4): 1062–1073.
  • Ouhimmou, M., S. D’Amours, R. Beauregard, D. Ait-Kadi, and S. Chauhan. 2008. “Furniture Supply Chain Tactical Planning Optimization Using a Time Decomposition Approach.” European Journal of Operational Research 189 (3): 952–970.10.1016/j.ejor.2007.01.064
  • Safaei, A. S., S. M. Moattar Husseini, R. Z.-Farahani, F. Jolai, and S. H. Ghodsypour. 2010. “Integrated Multi-site Production-distribution Planning in Supply Chain by Hybrid Modelling.” International Journal of Production Research 48 (14): 4043–4069.10.1080/00207540902791777
  • Salema, M. I. G., A. P. B. Póvoa, and A. Q. Novais. 2009. “A Strategic and Tactical Model for Closed-loop Supply Chains.” OR Spectrum 31 (3): 573–599.10.1007/s00291-008-0160-5
  • Stadtler, H. 2003. “Multilevel Lot Sizing with Setup times and Multiple Constrained Resources: Internally Rolling Schedules with Lot-sizing Windows.” Operations Research 51 (3): 487–502.10.1287/opre.51.3.487.14949
  • Stadtler, H., and F. Sahling. 2012. “A Lot-sizing and Scheduling Model for Multi-stage Flow Lines with Zero Lead times.” European Journal of Operational Research 225 (3): 404–419.
  • Steinrücke, M. 2011. “An Approach to Integrate Production-transportation Planning and Scheduling in an Aluminium Supply Chain Network.” International Journal of Production Research 49 (21): 6559–6583.10.1080/00207543.2010.528461
  • Steinrücke, M., and M. Jahr. 2012. “Tactical Planning in Supply Chain Networks with Customer Oriented Single Sourcing.” The International Journal of Logistics Management 23 (2): 259–279.10.1108/09574091211265387
  • Stopford, M. 2009. Maritime Economics. 3rd ed. London: Routledge.10.4324/9780203891742
  • Uggen, K. T., M. Fodstad, and V. S. Nørstebø. 2013. “Using and Extending Fix-and-relax to Solve Maritime Inventory Routing Problems.” TOP 21 (2): 355–377.10.1007/s11750-011-0174-z
  • Ullrich, C. A. 2013. “Integrated Machine Scheduling and Vehicle Routing with Time Windows.” European Journal of Operational Research 227 (1): 152–165.10.1016/j.ejor.2012.11.049
  • Weerts, W. 2008. “Arbeitsplattform Binnenschifffahrt [Working Platform Inland Water Transport].” In Grundlagen Der Schiffsfinanzierung [Basics of Ship Finance], edited by H. Winter, C. Hennig, and M. Gerhard, 883–905. Frankfurt: Frankfurt School Verlag.
  • Wu, T., L. Shi, and J. Song. 2012. “An MIP-based Interval Heuristic for the Capacitated Multi-level Lot-sizing Problem with Setup times.” Annals of Operations Research 196 (1): 635–650.10.1007/s10479-011-1026-9
  • Wu, T., K. Akartunali, J. Song, and L. Shi. 2013. “Mixed Integer Programming in Production Planning with Backlogging and Setup Carryover: Modeling and Algorithms.” Discrete Event Dynamic Systems 23 (2): 211–239.10.1007/s10626-012-0141-3

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.