450
Views
3
CrossRef citations to date
0
Altmetric
Articles

Stochastic economic lot sizing and scheduling problem with pitch interval, reorder points and flexible sequence

, &
Pages 5948-5961 | Received 31 Mar 2014, Accepted 01 Mar 2015, Published online: 21 Apr 2015

References

  • Arruda, Edilson F., and João Bosco R. do Val. 2008. “Stability and Optimality of a Multi-product Production and Storage System under Demand Uncertainty.” European Journal of Operational Research 188 (2): 406–427.10.1016/j.ejor.2007.04.028
  • Bazaraa, M. S., H. D. Sherali, and C. M. Shetty. 2006. Nonlinear Programming. 3rd ed. Hoboken, NJ: Wiley.10.1002/0471787779
  • Bensoussan, Alain, R. H. Liu, and Suresh P. Sethi. 2005. “Optimality of an (s, S) Policy with Compound Poisson and Diffusion Demands: A Quasi-variational Inequalities Approach.” SIAM Journal on Control and Optimization 44 (5): 1650–1676.10.1137/S0363012904443737
  • Bertolini, Massimo, Marcello Braglia, Giovanni Romagnoli, and Francesco Zammori. 2013. “Extending Value Stream Mapping: The Synchro-MRP Case.” International Journal of Production Research 51 (18): 5499–5519.10.1080/00207543.2013.784415
  • Bomberger, Earl E. 1966. “A Dynamic Programming Approach to a Lot Size Scheduling Problem.” Management Science 12 (11): 778–784. doi:10.1287/mnsc.12.11.778.
  • Bozer, Yavuz A., and David D. Ciemnoczolowski. 2013. “Performance Evaluation of Small-batch Container Delivery Systems Used in Lean Manufacturing – Part 1: System Stability and Distribution of Container Starts.” International Journal of Production Research 51 (2): 555–567.10.1080/00207543.2012.656330
  • Brander, Pär, Erik Levén, and Anders Segerstedt. 2005. “Lot Sizes in a Capacity Constrained Facility – A Simulation Study of Stationary Stochastic Demand.” International Journal of Production Economics 93–94: 375–386.10.1016/j.ijpe.2004.06.034
  • Brander, Pär, and Rolf Forsberg. 2006. “Determination of Safety Stocks for Cyclic Schedules with Stochastic Demands.” International Journal of Production Economics 104 (2): 271–295.10.1016/j.ijpe.2004.11.009
  • Chen, Hong, and Avi Mandelbaum. 1991. “Discrete Flow Networks: Bottleneck Analysis and Fluid Approximations.” Mathematics of Operations Research 16 (2): 408–446.10.1287/moor.16.2.408
  • Ciemnoczolowski, David D., and Yavuz A. Bozer. 2013. “Performance Evaluation of Small-batch Container Delivery Systems used in Lean Manufacturing – Part 2: Number of Kanban and Workstation Starvation.” International Journal of Production Research 51 (2): 568–581.10.1080/00207543.2012.656331
  • Doll, C. L., and D. C. Whybark. 1973. “An Iterative Procedure for the Single-machine Multi-product Lot Scheduling Problem.” Management Science 20 (1): 50–55.10.1287/mnsc.20.1.50
  • Eisenstein, Donald D. 2005. “Recovering Cyclic Schedules Using Dynamic Produce-up-to Policies.” Operations Research 53 (4): 675–688. doi:10.1287/opre.1040.0201.
  • Elmaghraby, Salah E. 1978. “The Economic Lot Scheduling Problem (ELSP): Review and Extensions.” Management Science 24 (6): 587–598. doi:10.1287/mnsc.24.6.587.
  • Eppen, Gary D., and R. Kipp Martin. 1988. “Determining Safety Stock in the Presence of Stochastic Lead Time and Demand.” Management Science 34 (11): 1380–1390. doi:10.1287/mnsc.34.11.1380.
  • Faccio, Maurizio, Mauro Gamberi, and Alessandro Persona. 2013. “Kanban Number Optimisation in a Supermarket Warehouse Feeding a Mixed-model Assembly System.” International Journal of Production Research 51 (10): 2997–3017.10.1080/00207543.2012.751516
  • Federgruen, Awi, and Ziv Katalan. 1996. “The Stochastic Economic Lot Scheduling Problem: Cyclical Base-stock Policies with Idle Times.” Management Science 42 (6): 783–796. doi:10.1287/mnsc.42.6.783.
  • Gallego, Guillermo. 1990. “Scheduling the Production of Several Items with Random Demands in a Single Facility.” Management Science 36 (12): 1579–1592. doi:10.1287/mnsc.36.12.1579.
  • Gupta, Shaman, and Sanjiv Kumar Jain. 2013. “A Literature Review of Lean Manufacturing.” Review of International Journal of Management Science and Engineering Management 8 (4): 241–249.
  • Hajek, Bruce. 1984. “Optimal Control of Two Interacting Service Stations.” IEEE Transactions on Automatic Control 29 (6): 491–499.10.1109/TAC.1984.1103577
  • Krieg, Georg N. 2005. Kanban-controlled Manufacturing Systems, Lecture Notes in Economics and Mathematical Systems. Berlin: Springer-Verlag.
  • Krieg, Georg N., and Heinrich Kuhn. 2001. “Production Planning of Multi-product Kanban Systems with Significant Setup Times.” In Operations Research Proceedings, edited by B. Fleischmann, R. Lasch, U. Derigs, W. Domschke, and U. Rieder, 316–321. Berlin: Springer.
  • Levén, Erik, and Anders Segerstedt. 2007. “A Scheduling Policy for Adjusting Economic Lot Quantities to a Feasible Solution.” European Journal of Operational Research 179 (2): 414–423.10.1016/j.ejor.2006.03.038
  • Lian, Y. H., and H. Van Landeghem. 2007. “Analysing the Effects of Lean Manufacturing Using a Value Stream Mapping-based Simulation Generator.” International Journal of Production Research 45 (13): 3037–3058.10.1080/00207540600791590
  • Luenberger, David G., and Yinyu Ye. 2008. Linear and Nonlinear Programming. 3rd ed. New York: Springer Science.
  • Marchwinski, Chet, and John Shook, eds. 2014. Lean Lexicon: A Graphical Glossary for Lean Thinkers. 5th ed. Cambridge, MA: Lean Enterprise Institute.
  • Marodin, Giuliano Almeida, and Tarcisio Abreu Saurin. 2013. “Implementing Lean Production Systems: Research Areas and Opportunities for Future Studies.” International Journal of Production Research 51 (22): 6663–6680.10.1080/00207543.2013.826831
  • Matzka, Judith, Maria Di Mascolo, and Kai Furmans. 2012. “Buffer Sizing of a Heijunka Kanban System.” Journal of Intelligent Manufacturing 23 (1): 49–60.10.1007/s10845-009-0317-3
  • Mentzer, John T., and R. Krishnan. 1985. “The Effect of the Assumption of Normality on Inventory Control/Customer Service.” Review of Journal of Business Logistics 6 (1): 101–112.
  • Meyn, Sean. 1997. “Stability and Optimization of Queueing Networks and Their Fluid Models.” In Mathematics of Stochastic Manufacturing Systems: AMS-SIAM Summer Seminar in Applied Mathematics, edited by George Yin and Quing Zhang, 175–200. Williamsburg: American Mathematical Society.
  • Moors, J. J. A., and L. W. G. Strijbosch. 2002. “Exact Fill Rates for (R, s, S) Inventory Control with Gamma Distributed Demand.” Journal of the Operational Research Society 53 (11): 1268–1274.10.1057/palgrave.jors.2601441
  • Nilsson, Kristina, and Anders Segerstedt. 2008. “Corrections of Costs to Feasible Solutions of Economic lot Scheduling Problems.” Review of Computers & Industrial Engineering 54 (1): 155–168.
  • Paternina-Arboleda, Carlos D., and Tapas K. Das. 2005. “A Multi-agent Reinforcement Learning Approach to Obtaining Dynamic Control Policies for Stochastic Lot Scheduling Problem.” Simulation Modelling Practice and Theory 13 (5): 389–406.10.1016/j.simpat.2004.12.003
  • Philipoom, P. R., L. P. Rees, and B. W. Taylor. 1996. “Simultaneously Determining the Number of Kanbans, Container Sizes, and the Final-assembly Sequence of Products in a just-in-time Shop.” Review of International Journal of Production Research 34 (1): 51–69.
  • Puterman, Martin L. 2005. Markov Decision Processes: Discrete Stochastic Dynamic Programming. Hoboken, NJ: Wiley-Interscience.
  • Qiu, Jin, and R. Loulou. 1995. “Multiproduct Production/Inventory Control under Random Demands.” Review of IEEE Transactions on Automatic Control 40 (2): 350–356.
  • Rother, M., and J. Shook. 2003. Learning to See: Value Stream Mapping to Add Value and Eliminate Muda. Cambridge, MA: Lean Enterprise Institute.
  • Segerstedt, Anders. 1999. “Lot Sizes in a Capacity Constrained Facility with Available Initial Inventories.” International Journal of Production Economics 59 (1–3): 469–475.10.1016/S0925-5273(98)00111-X
  • Smalley, A. 2004. Creating Level Pull: A Lean Production-system Improvement Guide for Production-control, Operations, and Engineering Professionals. Cambridge, MA: Lean Enterprise Institute.
  • Sutton, Richard S., and Andrew G. Barto. 1998. Reinforcement Learning: An Introduction. Vol. 1. Cambridge, MA: Cambridge University Press.
  • Taj, Shahram, Galia Novakova Nedeltcheva, George Pfeil, and Michael Roumaya. 2012. “A Spread-sheet Model for Efficient Production and Scheduling of a Manufacturing Line/Cell.” International Journal of Production Research 50 (4): 1141–1154.
  • Thun, Jörn-Henrik, Martin Drüke, and André Grübner. 2010. “Empowering Kanban through TPS-principles – An Empirical Analysis of the Toyota Production System.” International Journal of Production Research 48 (23): 7089–7106.10.1080/00207540903436695
  • Veatch, M. H. 2001. “Fluid Analysis of Arrival Routing.” IEEE Transactions on Automatic Control 46 (8): 1254–1257.10.1109/9.940928
  • Wang, Jiao, Xueping Li, and Xiaoyan Zhu. 2012. “Intelligent Dynamic Control of Stochastic Economic Lot Scheduling by Agent-based Reinforcement Learning.” International Journal of Production Research 50 (16): 4381–4395.
  • Winands, E. M. M., I. J. B. F. Adan, and G. J. van Houtum. 2011. “The Stochastic Economic Lot Scheduling Problem: A Survey.” European Journal of Operational Research 210 (1): 1–9.10.1016/j.ejor.2010.06.011
  • Womack, J. P., and D. T. Jones. 2013. Lean Thinking: Banish Waste and Create Wealth in Your Corporation. London: Simon & Schuster.
  • Womack, James P., Daniel T. Jones, and Daniel Roos. 2007. The Machine That Changed the World. New York: Simon and Schuster.
  • Zipkin, Paul H. 1986. “Models for Design and Control of Stochastic, Multi-item Batch Production Systems.” Operations Research 34 (1): 91–104. doi:10.1287/opre.34.1.91.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.