753
Views
37
CrossRef citations to date
0
Altmetric
Original Articles

Quantification for the importance degree of engineering characteristics with a multi-level hierarchical structure in QFD

, , , &
Pages 1627-1649 | Received 24 Aug 2014, Accepted 29 Mar 2015, Published online: 15 May 2015

References

  • Akao, Y. 1997. “QFD: Past, Present, and Future.” In Proceedings of the International Symposium on QFD. Linkoping.
  • Alinezad, A., A. Seif, and N. Esfandiari. 2013. “Supplier Evaluation and Selection with QFD and FAHP in a Pharmaceutical Company.” The International Journal of Advanced Manufacturing Technology 68: 355–364.10.1007/s00170-013-4733-3
  • Armacosta, R., P. Componation, M. Mullens, and W. Swart. 1994. “An AHP Framework for Prioritizing Customer Requirements in QFD: An Industrialized Housing Application.” IIE Transactions 26 (4): 72–79.10.1080/07408179408966620
  • Ayağ, Z., F. Samanlioglu, and G. Büyüközkan. 2013. “A Fuzzy QFD Approach to Determine Supply Chain Management Strategies in the Dairy Industry.” Journal of Intelligent Manufacturing 24: 1111–1122.10.1007/s10845-012-0639-4
  • Bevilacqua, M., F. Ciarapica, and G. Giacchetta. 2006. “A Fuzzy-QFD Approach to Supplier Selection.” Journal of Purchasing & Supply Management 12 (1): 14–27.
  • Bhattacharya, A., B. Sarkar, and S. Mukherjee. 2005. “Integrating AHP with QFD for Robot Selection Under Requirement Perspective.” International Journal of Production Research 43 (17): 3671–3685.10.1080/00207540500137217
  • Büyüközkan, G., and C. Gizem. 2013. “An Integrated QFD Framework with Multiple Formatted and Incomplete Preferences: A Sustainable Supply Chain Application.” Applied Soft Computing 13: 3931–3941.10.1016/j.asoc.2013.03.014
  • Büyüközkan, G., T. Ertay, C. Kahraman, and D. Ruan. 2004. “Determining the Importance Weights for the Design Requirements in the House of Quality Using the Fuzzy Analytic Network Approach.” International Journal of Intelligent Systems 19: 443–461.10.1002/(ISSN)1098-111X
  • Büyüközkan, G., O. Feyzioğlu, and D. Ruan. 2007. “Fuzzy Group Decision-making to Multiple Preference Formats in Quality Function Deployment.” Computers in Industry 58 (5): 392–402.10.1016/j.compind.2006.07.002
  • Chan, L., and M. Wu. 2002. “Quality Function Deployment: A Literature Review.” European Journal of Operational Research 143: 463–497.10.1016/S0377-2217(02)00178-9
  • Chan, L., H. Kao, and M. Wu. 1999. “Rating the Importance of Customer Needs in Quality Function Deployment by Fuzzy and Entropy Methods.” International Journal of Production Research 37 (11): 2499–2518.10.1080/002075499190635
  • Chen, L., and M. Weng. 2006. “An Evaluation Approach to Engineering Design in QFD Processes Using Fuzzy Goal Programming Models.” European Journal of Operational Research 172: 230–248.10.1016/j.ejor.2004.10.004
  • Chen, Y., J. Tang, R. Fung, and Z. Ren. 2004. “Fuzzy Regression-based Mathematical Programming Model for Quality Function Deployment.” International Journal of Production Research 42 (5): 1009–1027.10.1080/00207540310001619623
  • Chen, Y., R. Fung, and J. Tang. 2006. “Rating Technical Attributes in Fuzzy QFD by Integrating Fuzzy Weighted Average Method and Fuzzy Expected Value Operator.” European Journal of Operational Research 174: 1553–1566.10.1016/j.ejor.2004.12.026
  • Dai, J., and J. Blackhurst. 2012. “A Four-phase AHP–QFD Approach for Supplier Assessment: A Sustainability Perspective.” International Journal of Production Research 50 (19): 5474–5490.10.1080/00207543.2011.639396
  • Frank, A., D. Souza, J. Ribeiro, and M. Echeveste. 2013. “A Framework for Decision-making in Investment Alternatives Selection.” International Journal of Production Research 51 (19): 5866–5883.10.1080/00207543.2013.802393
  • Geng, X., X. Chu, D. Xue, and Z. Zhang. 2010. “An Integrated Approach for Rating Engineering Characteristics’ Final Importance in Product-service System Development.” Computers & Industrial Engineering 59: 585–594.
  • Ho, W., and P. Dey. 2011. “Strategic Sourcing: A Combined QFD and AHP Approach in Manufacturing.” Supply Chain Management: An International Journal 16 (6): 446–461.
  • Ho, W., T. He, C. Lee, and A. Emrouznejad. 2012. “Strategic Logistics Outsourcing: An Integrated QFD and fuzzy AHP Approach.” Expert Systems with Applications 39: 10841–10850.10.1016/j.eswa.2012.03.009
  • Ji, P., Jian Jin, T. Wang, and Y. Chen. 2014. “Quantification and Integration of Kano’s Model into QFD for Optimising Product Design.” International Journal of Production Research 52 (21): 6335–6348.10.1080/00207543.2014.939777
  • Jia, G., and M. Bai. 2011. “An Approach for Manufacturing Strategy Development Based on Fuzzy-QFD.” Computers & Industrial Engineering 60: 445–454.
  • Karsak, E. 2004. “Fuzzy Multiple Objective Decision Making Approach to Prioritize Design Requirements in Quality Function Deployment.” International Journal of Production Research 42 (18): 3957–3974.10.1080/00207540410001703998
  • Karsak, E., and M. Dursun. 2014. “An Integrated Supplier Selection Methodology Incorporating QFD and DEA with Imprecise Data.” Expert Systems with Applications 41: 6995–7004.10.1016/j.eswa.2014.06.020
  • Kaufmann, A., and M. Gupta. 1991. Introduction to Fuzzy Arithmetic: Theory and Application. New York: Van Nostrand Reinhold.
  • Khoo, L., and N. C. HO. 1996. “Framework of a Fuzzy Quality Function Deployment System.” International Journal of Production Research 34 (2): 299–311.10.1080/00207549608904904
  • Kim, J., J. Han, Y. Kim, S. Choi, and E. Kim. 2012. “Preference-based Solution Selection Algorithm for Evolutionary Multiobjective Optimization.” IEEE Transactions on Evolutionary Computation 16 (1): 20–34.10.1109/TEVC.2010.2098412
  • Kwong, C., and H. Bai. 2002. “A Fuzzy AHP Approach to the Determination of Importance Weights of Customer Requirements in Quality Function Deployment.” Journal of Intelligent Manufacturing 13: 367–377.10.1023/A:1019984626631
  • Kwong, C., and H. Bai. 2003. “Determining the Importance Weights for the Customer Requirements in QFD Using a Fuzzy AHP with an Extent Analysis Approach.” IIE Transactions 35: 619–626.10.1080/07408170304355
  • Kwong, C., Y. Ye, Y. Chen, and K. Choy. 2011. “A Novel Fuzzy Group Decision-making Approach to Prioritising Engineering Characteristics in QFD Under Uncertainties.” International Journal of Production Research 49 (19): 5801–5820.10.1080/00207543.2010.520043
  • Lei, D. 2010. “A Genetic Algorithm for Flexible Job Shop Scheduling with Fuzzy Processing Time.” International Journal of Production Research 48 (10): 2995–3013.10.1080/00207540902814348
  • Li, Y., J. Tang, X. Luo, and J. Xu. 2009. “An Integrated Method of Rough Set, Kano’s Model and AHP for Rating Customer Requirements’ Final Importance.” Expert Systems with Applications 36: 7045–7053.10.1016/j.eswa.2008.08.036
  • Li, Y., J. Tang, K. Chin, Y. Han, and X. Luo. 2012. “A Rough Set Approach for Estimating Correlation Measures in Quality Function Deployment.” Information Sciences 189: 126–142.10.1016/j.ins.2011.12.002
  • Lin, M., C. Wang, M. Chen, and C. Alec Chang. 2008. “Using AHP and TOPSIS Approaches in Customer-driven Product Design Process.” Computers in Industry 59: 17–31.10.1016/j.compind.2007.05.013
  • Liu, S. 2005. “Rating Design Requirements in Fuzzy Quality Function Deployment via A Mathematical Programming Approach.” International Journal of Production Research 43 (3): 497–513.10.1080/0020754042000270395
  • Liu, H. 2009. “The Extension of Fuzzy QFD: From Product Planning to Part Deployment.” Expert Systems with Applications 36 (8): 11131–11144.10.1016/j.eswa.2009.02.070
  • Liu, H. 2011. “Product Design and Selection Using Fuzzy QFD and Fuzzy MCDM Approaches.” Applied Mathematical Modelling 35: 482–496.10.1016/j.apm.2010.07.014
  • Ni, M., X. Xu, and S. Deng. 2007. “Extended QFD and Data-mining-based Methods for Supplier Selection in Mass Customization.” International Journal of Computer Integrated Manufacturing 20 (2–3): 280–291.10.1080/09511920601150651
  • Noorul Haq, A., and V. Boddu. 2014. “Analysis of Enablers for the Implementation of Leagile Supply Chain Management Using an Integrated Fuzzy QFD Approach.” Journal of Intelligent Manufacturing. Publish online. doi:10.1007/s10845-014-0957-9.
  • Raharjo, H., M. Xie, and A. Brombacher. 2006. “Dealing with Subjectivity in Early Product Design Phase: A Systematic Approach to Exploit Quality Function Deployment Potentials.” Computers & Industrial Engineering 55 (1): 253–278.
  • Rajam Ramasamy, N., and V. Selladurai. 2004. “Fuzzy Logic Approach to Prioritise Engineering Characteristics in Quality Function Deployment.” International Journal of Quality & Reliability Management 21 (9): 1012–1024.
  • Saaty, T. 1988. “What is the Analytic Hierarchy Process?” Mathematical Models for Decision Support 48: 109–121.10.1007/978-3-642-83555-1
  • Sakao, T. 2007. “A QFD-centred Design Methodology for Environmentally Conscious Product Design.” International Journal of Production Research 45 (18–19): 4143–4162.10.1080/00207540701450179
  • Sener, Z., and E. Karsak. 2011. “A Combined Fuzzy Linear Regression and Fuzzy Multiple Objective Programming Approach for Setting Target Levels in Quality Function Deployment.” Expert Systems with Applications 38: 3015–3022.10.1016/j.eswa.2010.08.091
  • Shen, X., M. Xie, and K. Tan. 2001. “Listening to the Future Voice of the Customer Using Fuzzy Trend Analysis in QFD.” Quality Engineering 13 (3): 419–425.10.1080/08982110108918670
  • Song, W., X. Ming, and Y. Han. 2014. “Prioritising Technical Attributes in QFD Under Vague Environment: A Rough-grey Relational Analysis Approach.” International Journal of Production Research 52 (18): 5528–5545.10.1080/00207543.2014.917213
  • Sugeno M. 1974. “Theory of Fuzzy Integral and Its Applications.” PhD thesis, Tokyo Institute of Technology, Tokyo, Japan.
  • Takahagi, E. 2000. “On Identification Methods of Lambda-fuzzy Measures Using Weights and Lambda.” Journal of Japanese Society, Fuzzy Theory Systems 12 (5): 665–676.
  • Vanegas, L., and A. Labib. 2001. “A Fuzzy Quality Function Deployment (FQFD) Model for Deriving Optimum Targets.” International Journal of Production Research 39 (1): 99–120.10.1080/00207540010005079
  • Vinodh, S., and S. Kumar Chintha. 2011. “Application of Fuzzy QFD for Enabling Leanness in a Manufacturing Organisation.” International Journal of Production Research 49 (6): 1627–1644.10.1080/00207540903568729
  • Wang, J. 1999. “Fuzzy Outranking Approach to Prioritize Design Requirements in Quality Function Deployment.” International Journal of Production Research 37 (4): 899–916.10.1080/002075499191599
  • Wang, Y. 2012a. “Assessing the Relative Importance Weights of Customer Requirements Using Multiple Preference Formats and Nonlinear Programming.” International Journal of Production Research 50 (16): 4414–4425.10.1080/00207543.2011.596848
  • Wang, Y. 2012b. “A Fuzzy-normalisation-based Group Decision-making Approach for Prioritising Engineering Design Requirements in QFD Under Uncertainty.” International Journal of Production Research 50 (23): 6963–6977.10.1080/00207543.2011.639398
  • Wang, C., and J. Chen. 2012. “Using Quality Function Deployment for Collaborative Product Design and Optimal Selection of Module Mix.” Computers & Industrial Engineering 63: 1030–1037.
  • Wang, Y., and H. Lee. 2007. “Generalizing TOPSIS for Fuzzy Multiple-criteria Group Decision-making.” Computers and Mathematics with Applications 53: 1762–1772.10.1016/j.camwa.2006.08.037
  • Wang, W., Z. Wang, and G. Klir. 1998. “Genetic Algorithms for Determining Fuzzy Measures from Data.” Journal of Intelligent and Fuzzy Systems 5 (2): 171–183.
  • Wasserman, G. S. 1993. “On How to Prioritize Design Requirements During the QFD Planning Process.” IIE Transactions (Institute of Industrial Engineers) 25 (3): 59–65.
  • Wu, H., and J. Shieh. 2006. “Using a Markov Chain Model in Quality Function Deployment to Analyse Customer Requirements.” The International Journal of Advanced Manufacturing Technology 30 (1–2): 141–146.10.1007/s00170-005-0023-z
  • Wu, H., A. Liao, and P. Wang. 2005. “Using Grey Theory in Quality Function Deployment to Analyse Dynamic Customer Requirements.” The International Journal of Advanced Manufacturing Technology 25: 1241–1247.10.1007/s00170-003-1948-8
  • Yang, J., and X. Dong. 2002. “On the Evidential Reasoning Algorithm for Multiple Attribute Decision Analysis Under Uncertainty.” IEEE Transactions on Systems, Man, and Cybernetics-Part A: Systems and Humans 32 (3): 289–304.10.1109/TSMCA.2002.802746
  • Yang, M., F. Khan, R. Sadiq, and P. Amyotte. 2011. “A Rough Set-based Quality Function Deployment (QFD) Approach for Environmental Performance Evaluation: A Case of Offshore Oil and Gas Operations.” Journal of Cleaner Production 19: 1513–1526.10.1016/j.jclepro.2011.04.005
  • Zadeh, L. 1965. “Fuzzy Sets.” Information and Control 8: 338–353.10.1016/S0019-9958(65)90241-X
  • Zadeh, L. 1975. “The Concept of a Linguistic Variable and Its Application to Approximate Reasoning-I.” Information Sciences 8: 199–249.10.1016/0020-0255(75)90036-5
  • Zandi, N., and M. Tavana. 2011. “A Fuzzy Group Quality Function Deployment Model for e-CRM Framework Assessment in Agile Manufacturing.” Computers & Industrial Engineering 61: 1–19.
  • Zhai, L., L. Khoo, and Z. Zhong. 2008. “A Rough Set Enhanced Fuzzy Approach to Quality Function Deployment.” The International Journal of Advanced Manufacturing Technology 37: 613–624.10.1007/s00170-007-0989-9
  • Zhai, L., L. Khoo, and Z. Zhong. 2009a. “Design Concept Evaluation in Product Development Using Rough Sets and Grey Relation Analysis.” Expert Systems with Applications 36: 7072–7079.10.1016/j.eswa.2008.08.068
  • Zhai, L., L. Khoo, and Z. Zhong. 2009b. “A Rough Set Based QFD Approach to the Management of Imprecise Design Information in Product Development.” Advanced Engineering Informatics 23: 222–228.10.1016/j.aei.2008.10.010
  • Zhai, L., L. Khoo, and Z. Zhong. 2010. “Towards a QFD-based Expert System: A Novel Extension to Fuzzy QFD Methodology Using Rough Set Theory.” Expert Systems with Applications 37 (12): 8888–8896.10.1016/j.eswa.2010.06.007
  • Zhang, Z., and X. Chu. 2009. “Fuzzy Group Decision-making for Multi-format and Multi-granularity Linguistic Judgments in Quality Function Deployment.” Expert Systems with Applications 36 (5): 9150–9158.10.1016/j.eswa.2008.12.027

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.