583
Views
15
CrossRef citations to date
0
Altmetric
Original Articles

A performance analytical model of automated material handling system for semiconductor wafer fabrication system

, &
Pages 1650-1669 | Received 29 Oct 2014, Accepted 08 Apr 2015, Published online: 03 Jun 2015

References

  • Agrawal, G. K., and S. S. Heragu. 2006. “A Survey of Automated Material Handling Systems in 300-Mm Semiconductor Fabs.” IEEE Transactions on Semiconductor Manufacturing 19 (1): 112–120.10.1109/TSM.2005.863217
  • Benjaafar, S. 2002. “Modeling and Analysis of Congestion in the Design of Facility Layouts.” Management Science 48 (5): 679–704.10.1287/mnsc.48.5.679.7800
  • Bozer, Y. A., M. S. Cho, and M. M. Srinivasan. 1994. “Expected Waiting Times in Single-device Trip-based Material Handling Systems.” European Journal of Operational Research 75 (1): 200–216.10.1016/0377-2217(94)90194-5
  • Chang, K. H., Y. H. Huang, and S. P. Yang. 2013. “Vehicle Fleet Sizing for Automated Material Handling Systems to Minimize Cost Subject to Time Constraints.” IIE Transactions 46 (3): 301–312.
  • Chatterjee, C., V. P. Roychowdhury, and E. K. P. Chong. 1997. “A Nonlinear Gauss–Seidel Algorithm for Noncoplanar and Coplanar Camera Calibration with Convergence Analysis.” Computer Vision and Image Understanding 67 (1): 58–80.10.1006/cviu.1997.0516
  • Ching, W. K., and M. K. Ng. 2006. Markov Chains, Models, Algorithms and Applications. New York: Springer Science Business Media.
  • Curry, G. L., B. A. Peters, and M. Lee. 2003. “Queueing Network Model for a Class of Material-handling Systems.” International Journal of Production Research 41: 3901–3920.10.1080/0020754031000149293
  • Fu, M. C., and B. K. Kaku. 1997. “Minimizing Work-in-process and Material Handling in the Facilities Layout Problem.” IIE Transactions 29 (1): 29–36.10.1080/07408179708966309
  • Heragu S. S., X. Cai, and A. Krishnamurthy. 2009 “Analysis of Autonomous Vehicle Storage and Retrieval System by Open Queueing Network.” In 2009 IEEE International Conference on Automation Science and Engineering, Bangalore: 455–459.
  • Huang, H. P., and C. T. Wang. 2002. “Modeling and Performance Evaluation for Automated Material Handling Systems in a 30 Mm.” In Proceedings of the 2002 IEEE International Conference on Robotics & Automation, Washington, DC.
  • Jain, M., S. Maheshwari, and K. P. S. Baghel. 2008. “Queueing Network Modelling of Flexible Manufacturing System Using Mean Value Analysis.” Applied Mathematical Modelling 32 (5): 700–711.10.1016/j.apm.2007.02.031
  • Johnson, M. E. 2001. “Modelling Empty Vehicle Traffic in AGVS Design.” International Journal of Production Research 39 (12): 2615–2633.10.1080/00207540110048990
  • Kahraman, A. F., A. Gosavi, and K. J. Oty. 2008. “Stochastic Modeling of an Automated Guided Vehicle System with One Vehicle and a Closed-loop Path.” IEEE Transactions on Automation Science and Engineering 5 (3): 504–518.10.1109/TASE.2008.917015
  • Kim, K. S., B. D. Chung, and M. Jae. 2003. “A Design for a Tandem AGVS with Multi-load AGVs.” The International Journal of Advanced Manufacturing Technology 22 (9–10): 744–752.10.1007/s00170-003-1614-1
  • Kleinrock, L. 1975. Queuing Systems. Hoboken, NJ: Wiley.
  • Kobza, J. E., Y. C. Shen, and R. J. Reasor. 1998. “A Stochastic Model of Empty-vehicle Travel Time and Load Request Service Time in Light-traffic Material Handling Systems.” IIE Transactions 30 (2): 133–142.
  • Koo, P. H., J. J. Jang, and J. Suh. 2004. “Estimation of Part Waiting Time and Fleet Sizing in AGV Systems.” International Journal of Flexible Manufacturing Systems 16 (3): 211–228.10.1007/s10696-005-1008-9
  • Le-Anh, T., and M. B. M. De-Koster. 2006. “A Review of Design and Control of Automated Guided Vehicle Systems.” European Journal of Operational Research 171: 1–23.10.1016/j.ejor.2005.01.036
  • Lee, H. F. 1997. “Performance Analysis for Automated Storage and Retrieval Systems.” IIE Transactions 29 (1): 15–28.10.1080/07408179708966308
  • Liao, D. Y., and H. S. Fu. 2004. “Speed Delivery: Dynamic OHT Allocation and Dispatching in Large-scale 300-Mm AMHS Management.” IEEE Robotics and Automation Magazine 22–32.10.1109/MRA.2004.1337824
  • Lin, J. T., F. K. Wang, and P. Y. Yen. 2004. “The Maximum Loading and the Optimum Number of Vehicles in a Double-loop of an Interbay Material System.” Production Planning & Control 15: 247–255.
  • Mackulak, G. T., and P. Savory. 2001. “A Simulation-based Experiment for Comparing AMHS Performance in a Semiconductor Fabrication Facility.” IEEE Transactions on Semiconductor Manufacturing 14 (3): 273–280.10.1109/66.939828
  • Montoya-Torres, J. R. 2006. “A Literature Survey on the Design Approaches and Operational Issues of Automated Wafer-transport Systems for Wafer Fabs.” Production Planning & Control 17: 648–663.
  • Nazzal, D., and L. F. McGinnis. 2005. “Queuing Models of Vehicle-based Automated Material Handling Systems in Semiconductor Fabs.” In Proceedings of the 37th conference on Winter simulation, Orlando, FL, USA, December 4–7, 2464–2471.
  • Nazzal, D., and L. F. McGinnis. 2007a. “Analytical Approach to Estimating AMHS Performance in 300 Mm Fabs.” International Journal of Production Research 45 (3): 571–590.10.1080/00207540600792333
  • Nazzal, D., and L. F. McGinnis. 2007b. “Expected Response times for Closed-loop Multivehicle AMHS.” IEEE Transactions on Automation Science and Engineering 4 (4): 533–542.10.1109/TASE.2007.906141
  • Nazzal, D., and L. F. McGinnis. 2008. “Throughput Performance Analysis for Closed-loop Vehicle-based Material Handling Systems.” IIE Transactions 40: 1097–1106.10.1080/07408170802167647
  • Petering, M. E. H., J. Seo, and C. Lee. 2007. “Performance Analysis of a Multiple Vehicle Tandem System with Inter-vehicle Buffers and Blocking.” Computers in Industry 58 (1): 3–11.10.1016/j.compind.2005.11.007
  • Qin, W., J. Zhang, and Y. B. Sun. 2013a. “Dynamic Dispatching for Interbay Material Handling by Using Modified Hungarian Algorithm and Fuzzy-logic-based Control.” The International Journal of Advanced Manufacturing Technology 67 (1–4): 295–309.10.1007/s00170-013-4775-6
  • Qin, W., J. Zhang, and Y. B. Sun. 2013b. “Multiple-objective Scheduling for Interbay AMHS by Using Genetic-programming-based Composite Dispatching Rules Generator.” Computers in Industry 64 (6): 694–707.10.1016/j.compind.2013.03.009
  • Reveliotis, S. A. 2000. “Conflict Resolution in AGV Systems.” IIE Transactions 32: 647–659.
  • Smith, J. M. 2010. “Robustness of State-dependent Queues and Material Handling Systems.” International Journal of Production Research 48 (16): 4631–4663.10.1080/00207540903049373
  • Srinivasan, M. M., Y. A. Bozer, and M. S. Cho. 1994. “Trip-based Material Handling Systems: Throughput Capacity Analysis.” IIE Transactions 26 (1): 70–89.10.1080/07408179408966586
  • Tompkins, J. A., and J. A. White. 1984. Facility Planning. New York: Wiley.
  • Uzsoy, R., C. Y. Lee, and L. A. Martin-Vega. 1994. “A Review of Production Planning and Scheduling Models in the Semiconductor Industry, Part II: Shop-floor Control.” IIE Transactions 26: 45–55.
  • Vidovic, M., and K. H. Kim. 2006. “Estimating the Cycle Time of Three-stage Material Handling Systems.” Annals of Operations Research 144 (1): 181–200.10.1007/s10479-006-0020-0
  • Vis, I. F. A. 2006. “Survey of Research in the Design and Control of Automated Guided Vehicle Systems.” European Journal of Operational Research 170: 677–709.10.1016/j.ejor.2004.09.020
  • Wang, M. J., H. C. Chung, and H. C. Wu. 2003. “The Evaluation of Manual FOUP Handling in 300 Mm Wafer Fab.” IEEE Transactions on Semiconductor Manufacturing 16: 44–55.
  • Wu, L. H., P. Y. Mok, and J. Zhang. 2011. “An Adaptive Multi-parameter Based Dispatching Strategy for Single-loop Interbay Material Handling Systems.” Computers in Industry 62: 175–186.10.1016/j.compind.2010.10.010
  • Wu, L. H., J. W. Wang, and J. Zhang. 2011. “Performance Analytical Model for Interbay Material Handling System with Shortcut and Blocking.” Knowledge Engineering and Management Advances in Intelligent and Soft Computing 123: 173–178.10.1007/978-3-642-25661-5

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.