989
Views
37
CrossRef citations to date
0
Altmetric
Original Articles

A cost minimisation model for joint production and maintenance planning under quality constraints

, &
Pages 2163-2176 | Received 15 Nov 2015, Accepted 09 Jun 2016, Published online: 27 Jun 2016

References

  • Aghezzaf, E. H., M. A. Jamali, and D. Ait-Kadi. 2007. “An Integrated Production and Preventive Maintenance Planning Model.” European Journal of Operations Research 181: 679–685.10.1016/j.ejor.2006.06.032
  • Aghezzaf, E. H., A. Khatab, and P. Le Tam. 2016. “Optimizing Production and Imperfect Preventive Maintenance Planning׳s Integration in Failure-prone Manufacturing Systems.” Reliability Engineering & System Safety 145: 190–198.
  • Alfares, H. K., S. N. Khursheed, and S. M. Noman. 2005. “Integrating Quality and Maintenance Decisions in a Production-inventory Model for Deteriorating Items.” International Journal of Production Research 43 (5): 899–911.10.1080/0020754042000298511
  • Bajestani, Aramon, M. D. Banjevic, and J. C. Beck. 2014. “Integrated Maintenance Planning and Production Scheduling with Markovian Deteriorating Machine Conditions.” International Journal of Production Research 52 (24): 7377–7400.10.1080/00207543.2014.931609
  • Banerjee, P. K., and M. A. Rahim. 1988. “Economic Design of X-chart under Weibull Shock Models.” Technometrics 30: 407–414.
  • Ben-Daya, M. 2002. “The Economic Production Lot-sizing Problem with Imperfect Production Processes and Imperfect Maintenance.” International Journal of Production Economics 76: 257–264.10.1016/S0925-5273(01)00168-2
  • Berrichi, A., F. Yalaoui, L. Amodeo, and M. Mezghiche. 2010. “Bi-objective Ant Colony Optimization Approach to Optimize Production and Maintenance Scheduling.” Computers & Operations Research 37 (9): 1584–1596.
  • Chen, Y. C. 2013. “An Optimal Production and Inspection Strategy with Preventive Maintenance Error and Rework.” Journal of Manufacturing Systems 32: 99–106.10.1016/j.jmsy.2012.07.010
  • Colledani, M., and T. Tolio. 2012. “Integrated Quality, Production Logistics and Maintenance Analysis of Multi-stage Asynchronous Manufacturing Systems with Degrading Machines.” Manufacturing Technology 61: 455–458.
  • van Dijkhuizen, G. C., and A. van Harten. 1998. “Two-stage Generalized Age Maintenance of a Queue-like Production System.” European Journal of Operational Research 108: 363–378.10.1016/S0377-2217(97)00105-7
  • Dohi, T., H. Okamura, and S. Osaki. 2001. “Optimal Control of Preventive Maintenance Schedule and Safety Stocks in an Unreliable Manufacturing Environment.” International Journal of Production Economics 74 (1–3): 147–155.10.1016/S0925-5273(01)00121-9
  • Duncan, A. J. 1956. “The Economic Design of Bar-X Charts Used to Maintain Current Control of a Process.” Journal of the American Statistical Association 51 (274): 228–242.
  • El-Ferik, S. 2008. “Economic Production Lot-sizing for an Unreliable Machine under Imperfect Age-based Maintenance Policy.” European Journal of Operational Research 186: 150–163.10.1016/j.ejor.2007.01.035
  • Gendreau, M., and J. Y. Potvin. 2003. “An Introduction to Tabu-search.” In Handbook of Metaheuristics, edited by F. Glover and G. A. Kochenberger, 37–54. New York: Springer.
  • Jafari, L., and V. Makis. 2016. “Optimal Lot-sizing and Maintenance Policy for a Partially Observable Production System.” Computers & Industrial Engineering 93: 88–98.
  • Karimi, B., S. M. T. Fatemi Ghomia, and J. M. Wilson. 2003. “The Capacitated Lot Sizing Problem: A Review of Models and Algorithms.” Omega 31: 365–378.10.1016/S0305-0483(03)00059-8
  • Karimi-Nasab, M., and K. Sabri-Laghaie. 2013. “Developing Approximate Algorithms for EPQ Problem with Process Compressibility and Random Error in Production/Inspection.” International Journal of Production Research 52 (8): 2388–2421.
  • Levrat, E., E. Thomas, and B. Iung. 2008. “Odds-based Decision-making Tool for Opportunistic Production-maintenance Synchronization.” International Journal of Production Research 46 (19): 5263–5287.10.1080/00207540802273793
  • Linderman, K., K. E. McKone-Sweet, and J. C. Anderson. 2005. “An Integrated Systems Approach to Process Control and Maintenance.” European Journal of Operational Research 164: 324–340.10.1016/j.ejor.2003.11.026
  • Liu, X., W. Wang, and R. Peng. 2015. “An Integrated Production, Inventory and Preventive Maintenance Model for a Multi-product Production System.” Reliability Engineering and System Safety 137: 76–86.10.1016/j.ress.2015.01.002
  • Lu, Z., Y. Zhang, and X. Han. 2013. “Integrating Run-based Preventive Maintenance into the Capacitated Lot Sizing Problem with Reliability Constraint.” International Journal of Production Research 51 (5): 1379–1391.10.1080/00207543.2012.693637
  • Lu, B., X. Zhou, and Y. Li. 2016. “Joint Modeling of Preventive Maintenance and Quality Improvement for Deteriorating Single-machine Manufacturing Systems.” Computers & Industrial Engineering 91: 188–196.
  • Machani, M., and M. Nourelfath. 2012. “A Variable Neighborhood Search for Integrated Production and Preventive Maintenance Planning in Multi-state Systems.” International Journal of Production Research 50 (13): 3643–3660.10.1080/00207543.2012.671587
  • Mercer, R. E., and J. R. Sampson. 1978. “Adaptive Search Using a Reproductive Metaplan.” Kybernetes 7 (3): 215–228.10.1108/eb005486
  • Moussawi-Haidar, L., M. Salameh, and W. Nasr. 2016. “Production Lot Sizing with Quality Screening and Rework.” Applied Mathematical Modelling 40: 3242–3256.10.1016/j.apm.2015.09.095
  • Nakagawa, T. 1980. “A Summary of Imperfect Preventive Maintenance Policies with Minimal Repair.” Operations Research 14 (3): 249–255.
  • Noorollahi, E., M. Karimi-Nasab, and M. B. Aryanezhad. 2012. “An Economic Production Quantity Model with Random Yield Subject to Process Compressibility.” Mathematical and Computer Modelling 56: 80–96.10.1016/j.mcm.2011.12.023
  • Nourelfath, M., M. Fitouhi, and M. Machani. 2010. “An Integrated Model for Production and Preventive Maintenance Planning in Multi-state Systems.” IEEE Transactions on Reliability 59 (3): 496–506.10.1109/TR.2010.2056412
  • Nourelfath, M., M. Ben-Daya, and N. Nahas. 2016. “An Integrated Model for Production, Maintenance and Quality.” Reliability Engineering and System Safety 148: 21–31.10.1016/j.ress.2015.11.015
  • Radhoui, M., N. Rezg, and A. Chelbi. 2009. “Integrated Model of Preventive Maintenance, Quality Control and Buffer Sizing for Unreliable and Imperfect Production Systems.” International Journal of Production Research 47 (2): 389–402.10.1080/00207540802426201
  • Rahim, M. A. 1994. “Joint Determination of Production Quantity, Inspection Schedule, and Control Chart Design.” IIE Transactions 26 (6): 2–11.10.1080/07408179408966632
  • Reeves, C. R. 2010. “Genetic Algorithms.” In Handbook of Metaheuristics, edited by M. Gendreau and J. Y. Potvin, 109–139. New York: Springer.10.1007/978-1-4419-1665-5
  • Toledo, M., O. Renato, and F. Paulo. 2013. “A Hybrid Multi-population Genetic Algorithm Applied to Solve the Multi-level Capacitated Lot Sizing Problem with Backlogging.” Computers & Operations Research 40 (4): 910–919.
  • Weinstein, L., and C. H. Chung. 1999. “Integrating Maintenance and Production Decisions in a Hierarchical Production Planning Environment.” Computers & Operations Research 26 (10–11): 1059–1074.
  • Wu, T., L. Shi, J. Geunes, and K. Akartunali. 2011. “An Optimization Framework for Solving Capacitated Multi-level Lot-sizing Problems with Backlogging.” European Journal of Operational Research 214 (2): 428–441.10.1016/j.ejor.2011.04.029
  • Xiang, Y. 2013. “Joint Optimization of X Control Chart and Preventive Maintenance Policies: A Discrete-time Markov Chain Approach.” European Journal of Operational Research 229: 382–390.10.1016/j.ejor.2013.02.041
  • Yalaoui, A., K. Chaabi, and F. Yalaoui. 2014. “Integrated Production Planning and Preventive Maintenance in Deteriorating Production Systems.” Information Sciences 278: 841–861.10.1016/j.ins.2014.03.097
  • Zhao, S., L. Wang, and Z. Yu. 2014. “Integrating Production Planning and Maintenance: An Iterative Method.” Industrial Management & Data Systems 114 (2): 162–182.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.