1,480
Views
58
CrossRef citations to date
0
Altmetric
Original Articles

Flexible job-shop scheduling/rescheduling in dynamic environment: a hybrid MAS/ACO approach

&
Pages 3173-3196 | Received 17 Mar 2016, Accepted 23 Nov 2016, Published online: 23 Dec 2016

References

  • Aydin, M. E., and E. Oztemel 2000. “Dynamic Job-shop Scheduling Using Reinforcement Learning Agents.” Robotics and Autonomous Systems 33(2–3): 169–178. Retrieved from <GotoISI>://WOS:00008997140000910.1016/S0921-8890(00)00087-7
  • Aytug, H., M. A. Lawley, K. McKay, S. Mohan, and R. Uzsoy 2005. “Executing Production Schedules in the Face of Uncertainties: A Review and Some Future Directions.” European Journal of Operational Research 161(1): 86–110. Retrieved from <GotoISI>://WOS:00022451450000910.1016/j.ejor.2003.08.027
  • Chou, Y.-C., H. Cao, and H. H. Cheng. 2013. “A Bio-inspired Mobile Agent-based Integrated System for Flexible Autonomic Job Shop Scheduling.” Journal of Manufacturing Systems 32 (4): 752–763.10.1016/j.jmsy.2013.01.005
  • Dong, Y.-H., and J. Jang. 2012. “Production Rescheduling for Machine Breakdown at a Job Shop.” International Journal of Production Research 50 (10): 2681–2691.10.1080/00207543.2011.579637
  • Gomes, M. C., A. P. Barbosa-Póvoa, and A. Q. Novais. 2010. “A Discrete Time Reactive Scheduling Model for New Order Insertion in Job Shop, Make-to-order Industries.” International Journal of Production Research 48 (24): 7395–7422.10.1080/00207540903433858
  • Gu, P., S. Balasubramanian, and D. H. Norrie. 1997. “Bidding-based Process Planning and Scheduling in a Multi-agent System.” Computers & Industrial Engineering 32 (2): 477–496. Retrieved from <GotoISI>://WOS:A1997WK6720001910.1016/S0360-8352(96)00056-3
  • Ho, Y. C., and C. L. Moodie. 1996. “Solving Cell Formation Problems in a Manufacturing Environment with Flexible Processing and Routeing Capabilities.” International Journal of Production Research 34 (10): 2901–2923. doi:10.1080/00207549608905065.
  • Hsu, C.-Y., B.-R. Kao, and K. R. Lai. 2016. “Agent-based Fuzzy Constraint-Directed Negotiation Mechanism for Distributed Job Shop Scheduling.” Engineering Applications of Artificial Intelligence 53: 140–154.10.1016/j.engappai.2016.04.005
  • Kim, K.-H., and P. J. Egbelu. 1998. “A Mathematical Model for Job Shop Scheduling with Multiple Process Plan Consideration per Job.” Production Planning & Control 9 (3): 250–259.10.1080/095372898234226
  • Kim, Y. K., K. Park, and J. Ko. 2003. “A Symbiotic Evolutionary Algorithm for the Integration of Process Planning and Job Shop Scheduling.” Computers & Operations Research 30 (8): 1151–1171. Retrieved from <GotoISI>://WOS:00018124070000410.1016/S0305-0548(02)00063-1
  • Leung, C. W., T. N. Wong, K. L. Mak, and R. Y. K. Fung. 2010. “Integrated Process Planning and Scheduling by an Agent-based Ant Colony Optimization.” Computers & Industrial Engineering 59 (1): 166–180. Retrieved from <GotoISI>://WOS:00027888310001910.1016/j.cie.2009.09.003
  • Li, X., C. Zhang, L. Gao, W. Li, and X. Shao. 2010. “An Agent-based Approach for Integrated Process Planning and Scheduling.” Expert Systems with Applications 37 (2): 1256–1264.10.1016/j.eswa.2009.06.014
  • Liu, L., H. Gu, and Y. Xi. 2007. “Robust and Stable Scheduling of a Single Machine with Random Machine Breakdowns.” The International Journal of Advanced Manufacturing Technology 31 (7–8): 645–654.
  • Lv, S., and L. Qiao. 2013. “Process Planning and Scheduling Integration with Optimal Rescheduling Strategies.” International Journal of Computer Integrated Manufacturing 27 (7): 638–655.
  • Nasr, N., and E. Elsayed. 1990. “Job Shop Scheduling with Alternative Machines.” International Journal of Production Research 28 (9): 1595–1609. doi:10.1080/00207549008942818.
  • Nejad, H. T. N., N. Sugimura, and K. Iwamura. 2011. “Agent-based Dynamic Integrated Process Planning and Scheduling in Flexible Manufacturing Systems.” International Journal of Production Research 49 (5): 1373–1389.10.1080/00207543.2010.518741
  • Nejad, H. T. N., N. Sugimura, K. Iwamura, and Y. Tanimizu. 2010. “Multi Agent Architecture for Dynamic Incremental Process Planning in the Flexible Manufacturing System.” Journal of Intelligent Manufacturing 21 (4): 487–499. doi:10.1007/s10845-008-0206-1.
  • Nouri, H. E., O. B. Driss, and K. Ghédira. 2016. “Simultaneous Scheduling of Machines and Transport Robots in Flexible Job Shop Environment Using Hybrid Metaheuristics Based on Clustered Holonic Multiagent Model.” Computers & Industrial Engineering.
  • Qiao, L., and S. Lv. 2012. “An Improved Genetic Algorithm for Integrated Process Planning and Scheduling.” The International Journal of Advanced Manufacturing Technology 58 (5–8): 727–740.
  • Rajabinasab, A., and S. Mansour. 2011. “Dynamic Flexible Job Shop Scheduling with Alternative Process Plans: An Agent-based Approach.” The International Journal of Advanced Manufacturing Technology 54 (9–12): 1091–1107.10.1007/s00170-010-2986-7
  • Shukla, S. K., M. K. Tiwari, and Y. J. Son. 2008. “Bidding-based Multi-agent System for Integrated Process Planning and Scheduling: A Data-mining and Hybrid Tabu-SA Algorithm-oriented Approach.” The International Journal of Advanced Manufacturing Technology 38 (1–2): 163–175.10.1007/s00170-007-1087-8
  • Silva, C. A., J. M. C.Sousa, and T. A.Runkler. 2008. “Rescheduling and Optimization of Logistic Processes Using GA and ACO.” Engineering Applications of Artificial Intelligence 21 (3): 343–352. Retrieved from <GotoISI>://WOS:00025671020000510.1016/j.engappai.2007.08.006
  • Usher, J. M. 2003. “Negotiation-based Routing in Job Shops via Collaborative Agents.” Journal of Intelligent Manufacturing 14 (5): 485–499.10.1023/A:1025705426184
  • Vieira, G. E., J. W. Herrmann, and E. Lin. 2003. “Rescheduling Manufacturing Systems: A Framework of Strategies, Policies, and Methods.” Journal of Scheduling 6 (1): 39–62.10.1023/A:1022235519958
  • Wong, T. N., C. W. Leung, K. L. Mak, and R. Y. K. Fung. 2006a. “An Agent-based Negotiation Approach to Integrate Process Planning and Scheduling.” International Journal of Production Research 44 (7): 1331–1351. Retrieved from <GotoISI>://WOS:00023527780000510.1080/00207540500409723
  • Wong, T. N., C. W. Leung, K. L. Mak, and R. Y. K. Fung. 2006b. “Dynamic Shopfloor Scheduling in Multi-agent Manufacturing Systems.” Expert Systems with Applications 31 (3): 486–494. Retrieved from <GotoISI>://WOS:00023875020000410.1016/j.eswa.2005.09.073
  • Wong, T. N., C. W. Leung, K. L. Mak, and R. Y. K. Fung. 2006c. “Integrated Process Planning and Scheduling/Rescheduling – An Agent-based Approach.” International Journal of Production Research 44 (18–19): 3627–3655. Retrieved from <GotoISI>://WOS:00023944870000510.1080/00207540600675801
  • Wong, T. N., S. C. Zhang, G. Wang, and L. P. Zhang. 2012. “Integrated Process Planning and Scheduling – Multi-agent System with Two-stage Ant Colony Optimisation Algorithm.” International Journal of Production Research 50 (21): 6188–6201. Retrieved from <GotoISI>://WOS:00031059710001110.1080/00207543.2012.720393
  • Xiong, W., and D. Fu. 2015. “A New Immune Multi-agent System for the Flexible Job Shop Scheduling Problem.” Journal of Intelligent Manufacturing 1–17. doi:10.1007/s10845-015-1137-2.10.1007/s00170-014-6361-y
  • Zattar, I. C., J. C. E. Ferreira, J. G. G. G. Rodrigues, and C. H. B. de Sousa. 2010. “A Multi-agent System for the Integration of Process Planning and Scheduling Using Operation-based Time-extended Negotiation Protocols.” International Journal of Computer Integrated Manufacturing 23 (5): 441–452. Retrieved from <GotoISI>://WOS:00027747240000510.1080/09511921003665775
  • Zhang, S., and T. N. Wong. 2014. “Integrated Process Planning and Scheduling: An Enhanced Ant Colony Optimization Heuristic with Parameter Tuning.” Journal of Intelligent Manufacturing 1–17: doi:10.1007/s10845-014-1023-3.
  • Zhang, S., and T. N. Wong. 2015. “Studying the Impact of Sequence-dependent Setup times in Integrated Process Planning and Scheduling by E-ACO Heuristics.” International Journal of Production Research  54 (16): 4815–4838.
  • Zhang, L., T. N. Wong, and R. Y. K. Fung. 2013. “A Multi-agent System to Support Heuristic-based Dynamic Manufacturing Rescheduling.” Intelligent Decision Technologies 7 (3): 197–211. doi:10.3233/IDT-130163.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.