References
- Al-Anzi, F. S., and A. Allahverdi. 2006. “A Hybrid Tabu Search Heuristic for the Two-Stage Assembly Scheduling Problem.” International Journal of Operations Research 3: 109–119.
- Al-Anzi, F. S., and A. Allahverdi. 2007. “A Self-Adaptive Differential Evolution Heuristic for Two-Stage Assembly Scheduling Problem to Minimize Maximum Lateness with Setup times.” European Journal of Operational Research 182: 80–94.10.1016/j.ejor.2006.09.011
- Allahverdi, A. 2015. “The Third Comprehensive Survey on Scheduling Problems with Setup times/Costs.” European Journal of Operational Research 246: 345–378.10.1016/j.ejor.2015.04.004
- Allahverdi, A., and F. S. Al-Anzi. 2006a. “Evolutionary Heuristics and an Algorithm for the Two-Stage Assembly Scheduling Problem to Minimize Makespan with Setup times.” International Journal of Production Research 44: 4713–4735.10.1080/00207540600621029
- Allahverdi, A., and F. S. Al-Anzi. 2006b. “A PSO and a Tabu Search Heuristics for the Assembly Scheduling Problem of the Two-Stage Distributed Database Application.” Computers and Operations Research 33: 1056–1080.10.1016/j.cor.2004.09.002
- Allahverdi, A., and F. S. Al-Anzi. 2009. “The Two-Stage Assembly Scheduling Problem to Minimize Total Completion Time with Setup times.” Computers and Operations Research 36: 2740–2747.10.1016/j.cor.2008.12.001
- Allahverdi, A., and H. Aydilek. 2015. “The Two Stage Assembly Flowshop Scheduling Problem to Minimize Total Tardiness.” Journal of Intelligent Manufacturing 26: 225–237.10.1007/s10845-013-0775-5
- Allahverdi, A., and H. M. Soroush. 2008. “The Significance of Reducing Setup times/Setup Costs.” European Journal of Operational Research 187: 978–984.10.1016/j.ejor.2006.09.010
- Allahverdi, A., C. T. Ng, T. C. E. Cheng, and M. Y. Kovalyov. 2008. “A Survey of Scheduling Problems with Setup times or Costs.” European Journal of Operational Research 187: 985–1032.10.1016/j.ejor.2006.06.060
- Aydilek, A., H. Aydilek, and A. Allahverdi. 2015. “Production in a Two-Machine Flowshop Scheduling Environment with Uncertain Processing and Setup times to Minimize Makespan.” International Journal of Production Research 53: 2803–2819.10.1080/00207543.2014.997403
- Azadeh, A., M. Jeihoonian, B. M. Shoja, and S. H. Seyedmahmoudi. 2012. “An Integrated Neural Network-Simulation Algorithm for Performance Optimisation of the Bi-Criteria Two-Stage Assembly Flow-Shop Scheduling Problem with Stochastic Activities.” International Journal of Production Research 50: 7271–7284.10.1080/00207543.2011.645511
- Chen, J., G. Q. Huang, H. Luo, and J. Wang. 2015. “Synchronisation of Production Scheduling and Shipment in an Assembly Flowshop.” International Journal of Production Research 53: 2787–2802.10.1080/00207543.2014.994075
- Fernandez-Viagas, V., and J. M. Framinan. 2015. “NEH-based Heuristics for the Permutation Flowshop Scheduling Problem to Minimise Total Tardiness.” Computers and Operations Research 60: 27–36.10.1016/j.cor.2015.02.002
- Framinan, J. M., R. Leisten, and R. Ruiz García. 2014. Manufacturing Scheduling Systems: An Integrated View on Models, Methods, and Tools. London: Springer.10.1007/978-1-4471-6272-8
- Hall, N. G., and M. E. Posner. 2001. “Generating Experimental Data for Computational Testing with Machine Scheduling Applications.” Operations Research 49: 854–865.10.1287/opre.49.6.854.10014
- Haouari, M., and T. Daouas. 1999. “Optimal Scheduling of the 3-Machine Assembly-Type Flow Shop.” RAIRO – Operations Research 33: 439–445.10.1051/ro:1999120
- Hariri, A. M. A., and C. N. Potts. 1997. “A Branch and Bound Algorithm for the Two-Stage Assembly Scheduling Problem.” European Journal of Operational Research 103: 547–556.10.1016/S0377-2217(96)00312-8
- Hatami, S., R. Ruiz, and C. Andrés-Romano. 2013. “The Distributed Assembly Permutation Flowshop Scheduling Problem.” International Journal of Production Research 51: 5292–5308.10.1080/00207543.2013.807955
- Lee, C. Y., T. C. E. Cheng, and B. M. T. Lin. 1993. “Minimizing the Makespan in the 3-Machine Assembly-Type Flowshop Scheduling Problem.” Management Science 39: 616–625.10.1287/mnsc.39.5.616
- Mozdgir, A., S. M. T. Fatemi Ghomi, F. Jolai, and J. Navaei. 2013. “Two-Stage Assembly Flow-Shop Scheduling Problem with Non-Identical Assembly Machines Considering Setup times.” International Journal of Production Research 51: 3625–3642.10.1080/00207543.2012.756151
- Navaei, J., S. M. T. Fatemi Ghomi, F. Jolai, and A. Mozdgir. 2014. “Heuristics for an Assembly Flow-Shop with Non-Identical Assembly Machines and Sequence Dependent Setup times to Minimize Sum of Holding and Delay Costs.” Computers and Operations Research 44: 52–65.10.1016/j.cor.2013.10.008
- Pinedo, M. 1995. Scheduling Theory, Algorithms, and Systems, 349. Englewood Cliffs, NJ: Prentice Hall.
- Potts, C. N., S. V. Sevast’janov, V. A. Strusevich, L. N. Van Wassenhove, and C. M. Zwaneveld. 1995. “The Two-Stage Assembly Scheduling Problem: Complexity and Approximation.” Operations Research 43: 346–355.10.1287/opre.43.2.346
- Song, C. Y., K. L. Hu, and P. Li. 2012. “Modeling and Scheduling Optimization for Bulk Ore Blending Process.” Journal of Iron and Steel Research International 19: 20–28.10.1016/S1006-706X(13)60004-7
- Tian, Y., D. Liu, D. Yuan, and K. Wang. 2013. “A Discrete PSO for Two-Stage Assembly Scheduling Problem.” International Journal of Advanced Manufacturing Technology 66: 481–499.10.1007/s00170-012-4343-5
- Torabzadeh, E., and M. Zandieh. 2010. “Cloud Theory-Based Simulated Annealing Approach for Scheduling in the Two-Stage Assembly Flowshop.” Advances in Engineering Software 41: 1238–1243.10.1016/j.advengsoft.2010.06.004
- Tozkapan, A., Ö. Kırca, and C. S. Chung. 2003. “A Branch and Bound Algorithm to Minimize the Total Weighted Flowtime for the Two-Stage Assembly Scheduling Problem.” Computers and Operations Research 30: 309–320.10.1016/S0305-0548(01)00098-3
- Wang, K., W. Q. Ma, H. Luo, and H. Qin. 2016. “Coordinated Scheduling of Production and Transportation in a Two-Stage Assembly Flowshop.” International Journal of Production Research 54: 6891–6911.10.1080/00207543.2016.1193246
- Xiong, F., K. Xing, F. Wang, H. Lei, and L. Han. 2014. “Minimizing the Total Completion Time in a Distributed Two Stage Assembly System with Setup times.” Computers and Operations Research 47: 92–105.10.1016/j.cor.2014.02.005
- Yu, J.-M., R. Huang, and D.-H. Lee. 2017. “Iterative Algorithms for Batching and Scheduling to Minimise the Total Job Tardiness in Two-Stage Hybrid Flow Shops.” International Journal of Production Research 55: 3266–3282.10.1080/00207543.2017.1304661