966
Views
20
CrossRef citations to date
0
Altmetric
Articles

Investigating the value of integrated operations planning: A case-based approach from automotive industry

, , , &
Pages 6971-6992 | Received 14 Jun 2017, Accepted 24 Dec 2017, Published online: 16 Jan 2018

References

  • Alfares, Hesham K. , Syed Naveed Khursheed , and Syed Mobasher Noman . 2005. “Integrating Quality and Maintenance Decisions in a Production-Inventory Model for Deteriorating Items.” International Journal of Production Research 43 (5): 899–911. doi:10.1080/0020754042000298511.
  • Angerhofer, Bernhard J. , and Marios C. Angelides . 2006. “A Model and a Performance Measurement System for Collaborative Supply Chains.” Decision Support Systems 42 (1): 283–301. doi:10.1016/j.dss.2004.12.005.
  • Bajestani, Maliheh Aramon , and J. Christopher Beck . 2015. “A Two-Stage Coupled Algorithm for an Integrated Maintenance Planning and Flowshop Scheduling Problem with Deteriorating Machines.” Journal of Scheduling 18 (5): 471–486. doi:10.1007/s10951-015-0416-2.
  • Berthaut, F. , A., Gharbi , and K. Dhouib 2011. “Joint Modified Block Replacement and Production/Inventory Control Policy for a Failure-Prone Manufacturing Cell.” Omega 39 (6): 642–654. doi:10.1016/j.omega.2011.01.006.
  • Cassady, C. Richard , and Erhan Kutanoglu . 2003. “Minimizing Job Tardiness Using Integrated Preventive Maintenance Planning and Production Scheduling.” IIE Transactions 35 (6): 503–513. doi:10.1080/07408170390187951.
  • Chelbi, A. , D. Ait-Kadi , and M. Radhoui . 2008. “An integrated Production and Maintenance Model for One Failure Prone Machine-Finite Capacity Buffer System for Perishable Products with Constant Demand.” International Journal of Production Research 46 (19): 5427–5440. doi:10.1080/00207540802273660.
  • Cheng, Guo Qing , Bing Hai Zhou , and Ling Li . 2017. “Joint Optimization of Lot Sizing and Condition-Based Maintenance for Multi-Component Production Systems.” Computers & Industrial Engineering 110: 538–549. doi:10.1016/j.cie.2017.06.033.
  • Dastidar, Satyaki Ghosh , and Rakesh Nagi . 2007. “Batch Splitting in an Assembly Scheduling Environment.” International Journal of Production Economics 105 (2): 372–384. doi:10.1016/j.ijpe.2004.04.012.
  • Debuse, J. C. W. , V. J. Rayward-Smith , and G. D. Smith . 1999. “Parameter Optimisation for a Discrete Event Simulator.” Computers & Industrial Engineering 37 (1): 181–184. doi:10.1016/S0360-8352(99)00050-9.
  • Dellagi, Sofiene , Anis Chelbi , and Wajdi Trabelsi . 2017. “Joint Integrated Production-Maintenance Policy with Production Plan Smoothing Through Production Rate Control.” Journal of Manufacturing System 42: 262–270. doi:10.1016/j.jmsy.2016.12.013.
  • Dong, Ming . 2013. “Parallel Machine Scheduling with Limited Controllable Machine Availability.” International Journal of Production Research 51 (8): 2240–2252. doi:10.1080/00207543.2012.714002.
  • Erfanian, M. , and M. Pirayesh . 2016, December 4–7. “Integration Aggregate Production Planning and Maintenance Using Mixed Integer Linear Programming.” 2016 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM), Bali, Indonesia, 927–930. doi:10.1109/IEEM.2016.7798013.
  • Fata, La , Concetta Manuela , and Gianfranco Passannanti . 2017. “A Simulated Annealing-Based Approach for the Joint Optimization of Production/Inventory and Preventive Maintenance Policies.” The International Journal of Advanced Manufacturing Technology: 1–11. doi:10.1007/s00170-017-0053-3.
  • Garg, Amik , and S. G. Deshmukh . 2006. “Maintenance Management: Literature Review and Directions.” Journal of Quality in Maintenance Engineering 12 (3): 205–238. doi:10.1108/13552510610685075.
  • Hadidi, Laith A. , Umar M. Al-Turki , and Abdur Rahim . 2012. “Integrated Models in Production Planning and Scheduling, Maintenance and Quality: A Review.” International Journal of Industrial and Systems Engineering 10 (1): 21–50. doi:10.1504/IJISE.2012.044042.
  • Hasanzadeh, Amir , Omid Moghadardoust , and Mehdi Fathi . 2009, December 8–11. “Developing a Model for Integrating Process Planning and Production Planning and Control in Cellular Manufacturing.” 2009 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM), Hong Kong, China, 936–940. doi:10.1109/IEEM.2009.5373394.
  • Van Horenbeek, Adriaan , Jasmine Buré , Dirk Cattrysse , Liliane Pintelon , and Pieter Vansteenwegen . 2013. “Joint Maintenance and Inventory Optimization Systems: A Review.” International Journal of Production Economics 143 (2): 499–508. doi:10.1016/j.ijpe.2012.04.001.
  • Karimi, N. , and H. Davoudpour . 2016. “Integrated Production and Delivery Scheduling for Multi-Factory Supply Chain with Stage-Dependent Inventory Holding Cost.” Computational and Applied Mathematics: 1–16. doi: 10.1007/s40314-016-0305-0.
  • Kiani, Amirkiarash , and Sharareh Taghipour . 2017, January 23–26. “Joint Optimization of Maintenance and Production Scheduling.” IEEE Annual Reliability and Maintainability Symposium (RAMS’17), Orlando, FL, 1–6. doi:10.1109/RAM.2017.7889710.
  • Kibira, Deogratias , Guodong Shao , and Björn Johansson . 2016, December 11–14. “Framework for Standardization of Simulation Integrated Production Planning.” 2016 IEEE Winter Simulation Conference (WSC), Washington, DC, 2970–2981. doi:10.1109/WSC.2016.7822331.
  • Kim, Byung Soo , and Yucel Ozturkoglu . 2013. “Scheduling a Single Machine with Multiple Preventive Maintenance Activities and Position-Based Deteriorations Using Genetic Algorithms.” The International Journal of Advanced Manufacturing Technology: 1–11. doi:10.1007/s00170-012-4553-x.
  • Kumar, Sandeep , and Bhupesh Kumar Lad . 2016. “Integrated Production and Maintenance Planning for Parallel Machine System Considering Cost of Rejection.” Journal of the Operational Research Society 68 (7): 834–846. doi:10.1057/jors.2016.46.
  • Labarthe, Olivier , Bernard Espinasse , Alain Ferrarini , and Benoit Montreuil . 2007. “Toward a Methodological Framework for Agent-Based Modelling and Simulation of Supply Chains in a Mass Customization Context.” Simulation Modelling Practice and Theory 15 (2): 113–136. doi:10.1016/j.simpat.2006.09.014.
  • Lee, Chung-Yee , and Surya Danusaputro Liman . 1992. “Single Machine Flow-Time Scheduling with Scheduled Maintenance.” Acta Informatica 29 (4): 375–382. doi:10.1007/BF01178778.
  • Lee, Shine-Der , and J. M. Rung . 2000. “Production Lot Sizing in Failure Prone Two-Stage Serial Systems.” European Journal of Operational Research 123 (10): 42–60. doi:10.1016/S0377-2217(99)00089-2.
  • Li, Wei , and Ming J. Zuo . 2007, January 22–25. “Joint Optimization of Inventory Control and Maintenance Policy.” IEEE Annual Reliability and Maintainability Symposium (RAMS’07), Orlando, FL, 317–322. doi:10.1109/RAMS.2007.328069.
  • Liao, Wenzhu , Xiufang Zhang , and Min Jiang . 2016, December 4–7. “An Optimization Model Integrated Production Scheduling and Preventive Maintenance for Group Production.” 2016 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM), Bali, Indonesia, 936–940. doi:10.1109/IEEM.2016.7798015.
  • Liu, Shi Qiang , and Erhan Kozan . 2009. “Scheduling a Flow Shop with Combined Buffer Conditions.” International Journal of Production Economics 117 (2): 371–380. doi:10.1016/j.ijpe.2008.11.007.
  • Liu, Shi Qiang , and Erhan Kozan . 2016. “Parallel-Identical-Machine Job-Shop Scheduling with Different Stage-Dependent Buffering Requirements.” Computers & Operations Research 74: 31–41. doi:10.1016/j.cor.2016.04.023.
  • Liu, Xuejuan , Wenbin Wang , and Rui Peng . 2015. “An integrated Production, Inventory and Preventive Maintenance Model for a Multi-Product Production System.” Reliability Engineering & System Safety 137: 76–86. doi:10.1016/j.ress.2015.01.002.
  • Mosheiov, Gur , and Jeffrey B. Sidney . 2010. “Scheduling a Deteriorating Maintenance Activity on a Single Machine.” Journal of the Operational Research Society 61 (5): 882–887. doi:10.1057/jors.2009.5.
  • Nahas, Nabil , Mustapha Nourelfath , and Daoud Ait-Kadi . 2009. “Selecting Machines and Buffers in Unreliable Series-Parallel Production Lines.” International Journal of Production Research 47 (14): 3741–3774. doi:10.1080/00207540701806883.
  • Najid, Najib M. , Marouane Alaoui-Selsouli , and Abdelmoula Mohafid . 2011. “An Integrated Production and Maintenance Planning Model with Time Windows and Shortage Cost.” International Journal of Production Research 49 (8): 2265–2283. doi:10.1080/00207541003620386.
  • Nourelfath, Mustapha , and Eric Châtelet . 2012. “Integrating Production, Inventory and Maintenance Planning for a Parallel System with Dependent Components.” Reliability Engineering & System Safety 101: 59–66. doi:10.1016/j.ress.2012.02.001.
  • Pandey, Divya , Makarand S. Kulkarni , and Prem Vrat . 2011. “A Methodology for Joint Optimization for Maintenance Planning, Process Quality and Production Scheduling.” Computers & Industrial Engineering 61 (4): 1098–1106. doi:10.1016/j.cie.2011.06.023.
  • Qi, X. , T. Chen , and F. Tu . 1999. “Scheduling the Maintenance on a Single Machine.” Journal of the operational Research Society 50 (10): 1071–1078. doi:10.1057/palgrave.jors.2600791.
  • Qing-dao-er-ji, R. , Yuping Wang , and Xiaoli Wang . 2013. “Inventory Based Two-Objective Job Shop Scheduling Model and its Hybrid Genetic Algorithm.” Applied Soft Computing 13 (3): 1400–1406. doi:10.1016/j.asoc.2012.03.073.
  • Rezg, Nidhal , Sofiene Dellagi , and Anis Chelbi . 2008. “Joint Optimal Inventory Control and Preventive Maintenance Policy.” International Journal of Production Research 46 (19): 5349–5365. doi:10.1080/00207540802273942.
  • Ringard, Jean-Baptiste , Bhushan S. Purohit , and Bhupesh Kumar Lad . 2015, July 21–23. “Integrated Operations Planning for a Multicomponent Machine Subjected to Stochastic Environment.” 5th International Conference on Simulation and Modeling Methodologies, Technologies and Applications (SIMULTECH 2015), Colmar, Alsace, France, 37–44. doi:10.5220/0005496500550062.
  • Sadfi, Cherif , Bernard Penz , Christophe Rapine , Jacek Błażewicz , and Piotr Formanowicz . 2005. “An Improved Approximation Algorithm for the Single Machine Total Completion Time Scheduling Problem with Availability Constraints.” European Journal of Operational Research 161 (1): 3–10. doi:10.1016/j.ejor.2003.08.026.
  • Samaranayake, Premaratne , and Senevi Kiridena . 2012. “Aircraft Maintenance Planning and Scheduling: An Integrated Framework.” Journal of Quality in Maintenance Engineering 18 (4): 432–453. doi:10.1108/13552511211281598.
  • Sharma, Anil , G. S. Yadava , and S. G. Deshmukh . 2011. “A Literature Review and Future Perspectives on Maintenance Optimization.” Journal of Quality in Maintenance Engineering 17 (1): 5–25. doi:10.1108/13552511111116222.
  • Shishir Bhat, B. N. 2008. “A New Framework Concept for Production Planning Systems in Cellular Manufacturing.” International Journal of Intelligent Manufacturing, Springer.. doi:10.1007/s10845-008-0139-8.
  • Solimanpur, Maghsud , and Atabak Elmi . 2011. “A Tabu Search Approach for Group Scheduling in Buffer-Constrained Flow Shop Cells.” International Journal of Computer Integrated Manufacturing 24 (3): 257–268. doi:10.1080/0951192X.2011.552527.
  • Sun, Kaibiao , and Hongxing Li . 2010. “Scheduling Problems with Multiple Maintenance Activities and Non-Preemptive Jobs on Two Identical Parallel Machines.” International Journal of Production Economics 124 (1): 151–158. doi:10.1016/j.ijpe.2009.10.018.
  • Tambe, Pravin P. , and Makarand S. Kulkarni . 2015. “A Superimposition Based Approach for Maintenance and Quality Plan Optimization with Production Schedule, Availability, Repair Time and Detection Time Constraints for a Single Machine.” Journal of Manufacturing Systems 37: 17–32. doi:10.1016/j.jmsy.2015.09.009.
  • Tambe, Pravin P. , Satish Mohite , and Makarand S. Kulkarni . 2013. “Optimisation of Opportunistic Maintenance of a Multi-Component System Considering the Effect of Failures on Quality and Production Schedule: A Case Study.” The International Journal of Advanced Manufacturing Technology 69 (5–8): 1743–1756. doi:10.1007/s00170-013-5122-7.
  • Upasani, Kartikeya , Miroojin Bakshi , Vibhor Pandhare , and Bhupesh Kumar Lad . 2017. “Distributed Maintenance Planning in Manufacturing Industries.” Computers & Industrial Engineering 108: 1–14. doi:10.1016/j.cie.2017.03.027.
  • Wang, Shijin , and Ming Liu . 2015. “Multi-Objective Optimization of Parallel Machine Scheduling Integrated with Multi-Resources Preventive Maintenance Planning.” Journal of Manufacturing Systems 37: 182–192. doi:10.1016/j.jmsy.2015.07.002.
  • Witness 14 Manufacturing Performance Edition, Lanner Group . 2016. Accessed June 3 2016. https://www.lanner.com/insights/blog/witness-14-has-arrived.html
  • Yedes, Yesser , Anis Chelbi , and Nidhal Rezg . 2012. “Quasi-Optimal Integrated Production, Inventory and Maintenance Policies for a Single-Vendor Single-Buyer System with Imperfect Production Process.” Journal of Intelligent Manufacturing 23 (4): 1245–1256. doi:10.1007/s10845-010-0423-2.
  • Zadeh, Hassan , Hamid Afshari Amir , and Reza Ramazani Khorshid-Doust . 2014. “Integration of Process Planning and Production Planning and Control in Cellular Manufacturing.” Production Planning & Control 25 (10): 840–857. doi:10.1080/09537287.2013.767394.
  • Zandieh, M. , M. N. Joreir-Ahmadi , and A. Fadaei-Rafsanjani . 2017. “Buffer Allocation Problem and Preventive Maintenance Planning in Non-Homogenous Unreliable Production Lines.” The International Journal of Advanced Manufacturing Technology: 1–13. doi:10.1007/s00170-016-9744-4.
  • Zarook, Yaser , Javad Rezaeian , Reza Tavakkoli-Moghaddam , Iraj Mahdavi , and Nikbakhsh Javadian . 2015. “Minimization of Makespan for the Single Batch-Processing Machine Scheduling Problem with Considering Aging Effect and Multi-Maintenance Activities.” The International Journal of Advanced Manufacturing Technology 76 (9–12): 1879–1892. doi:10.1007/s00170-014-6342-1.
  • Zied, Hajej , Dellagi Sofiene , and Rezg Nidhal . 2011. “Optimal Integrated Maintenance/Production Policy for Randomly Failing Systems with Variable Failure Rate.” International Journal of Production Research 49 (19): 5695–5712. doi:10.1080/00207543.2010.528063.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.