1,325
Views
17
CrossRef citations to date
0
Altmetric
Articles

Centralised vs. decentralised control decision in card-based control systems: comparing kanban systems and COBACABANA

, ORCID Icon, , &
Pages 322-337 | Received 08 Nov 2017, Accepted 15 Dec 2017, Published online: 16 Jan 2018

References

  • Baker, K. R. , and J. J. Kanet . 1983. “Job Shop Scheduling with Modified Operation Due-Dates.” Journal of Operations Management 4 (1): 11–22.10.1016/0272-6963(83)90022-0
  • Bechte, W. 1994. “Load-Oriented Manufacturing Control Just-in-Time Production for Job Shops.” Production Planning & Control 5 (3): 292–307.10.1080/09537289408919499
  • Bergamaschi, D. , R. Cigolini , M. Perona , and A. Portioli . 1997. “Order Review and Release Strategies in a Job Shop Environment: A Review and a Classification.” International Journal of Production Research 35 (2): 399–420.10.1080/002075497195821
  • Berkley, B. J. 1992. “A Review of the Kanban Production Control Research Literature.” Production & Operations Management 1 (4): 393–411.
  • Buzacott, J. A. , and J. G. Shanthikumar . 1992. “A General Approach for Coordinating Production in Multiple-Cell Manufacturing Systems.” Production & Operations Management 1 (1): 34–52.
  • Chang, T. M. , and Y. Yih . 1994a. “Generic Kanban Systems for Dynamic Environments.” International Journal of Production Research 32 (4): 889–902.10.1080/00207549408956977
  • Chang, T.-M. , and Y. Yih . 1994b. “Determining the Number of Kanbans and Lot Sizes in a Generic Kanban System: A Simulated Annealing Approach.” International Journal of Production Research 32 (8): 1991–2004.10.1080/00207549408957054
  • Chen, Z. , and B. R. Sarker . 2015. “Optimisation of Multi-Stage JIT Production-Pricing Decision: Centralised and Decentralised Models and Algorithms.” International Journal of Production Research 53 (20): 6210–6230.10.1080/00207543.2015.1038369
  • Cigolini, R. , and A. Portioli-Staudacher . 2002. “An Experimental Investigation on Workload Limiting Methods with ORR Policies in a Job Shop Environment.” Production Planning & Control 13 (7): 602–613.10.1080/0953728021000026221
  • Dallery, Y. , and G. Liberopoulos . 2000. “Extended Kanban Control System: Combining Kanban and Base Stock.” IIE Transactions 32 (4): 369–386.
  • Diaz, R. , and A. Ardalan . 2010. “An Analysis of Dual-Kanban Just-in-Time Systems in a Non-Repetitive Environment.” Production & Operations Management 19 (2): 233–245.10.1111/poms.2010.19.issue-2
  • Faccio, M. 2014. “The Impact of Production Mix Variations and Models Varieties on the Parts-Feeding Policy Selection in a JIT Assembly System.” International Journal of Advanced Manufacturing Technology 72: 543–560.10.1007/s00170-014-5675-0
  • Faccio, M. , M. Gamberi , and A. Persona . 2013. “Kanban Number Optimisation in a Supermarket Warehouse Feeding a Mixed-Model Assembly System.” International Journal of Production Research 5 (10): 2997–3017.10.1080/00207543.2012.751516
  • Frein, Y. , M. Di Mascolo , and Y. Dallery . 1995. “On the Design of Generalized Kanban Control Systems.” International Journal of Operations & Production Management 15 (9): 158–184.10.1108/01443579510099724
  • Gaury, E. G. A. , J. P. C. Kleijnen , and H. Pierreval . 2001. “A Methodology to Customize Pull Control Systems.” Journal of the Operational Research Society 52 (7): 789–799.10.1057/palgrave.jors.2601153
  • Gong, Q. , Y. Yang , and S. Wang . 2014. “Information and Decision-Making Delays in MRP, KANBAN, and CONWIP.” International Journal of Production Economics 156: 208–213.10.1016/j.ijpe.2014.06.010
  • Gonzalez, P. L. , J. M. Framinan , and H. Pierreval . 2012. “Token-Based Pull Production Control Systems: An Introductory Overview.” Journal of Intelligent Manufacturing 23: 5–22.10.1007/s10845-011-0534-4
  • Graves, R. J. , J. M. Konopka , and R. J. Milne . 1995. “Literature Review of Material Flow Control Mechanisms.” Production Planning & Control 6 (5): 395–403.10.1080/09537289508930296
  • Gupta, S. M. , and Y. A. Y. Al-Turki . 1997. “An Algorithm to Dynamically Adjust the Number of Kanbans in Stochastic Processing times and Variable Demand Environment.” Production Planning & Control 8 (2): 133–141.10.1080/095372897235398
  • Hendry, L. C. , and B. G. Kingsman . 1991. “A Decision Support System for Job Release in Make to Order Companies.” International Journal of Operations & Production Management 11: 6–16.10.1108/01443579110144655
  • Hofmann, E. , and M. Rüsch . 2017. “Industry 4.0 and the Current Status as Well as Future Prospects on Logistics.” Computers in Industry 89: 23–34.10.1016/j.compind.2017.04.002
  • Hopp, W. J. , and M. L. Spearman . 2001. Factory Physics: Foundations of Manufacturing Management. 2nd ed. New York: McGrawHill.
  • Hopp, W. J. , and M. L. Spearman . 2004. “To Pull or Not to Pull: What is the Question?” Manufacturing and Service Operations Management 6 (2): 133–148.10.1287/msom.1030.0028
  • Khojasteh, Y. , and R. Sato . 2015. “Selection of a Pull Production Control System in Multi-Stage Production Processes.” International Journal of Production Research 53 (14): 4363–4379.10.1080/00207543.2014.1001530
  • Kimura, O. , and H. Terada . 1981. “Design and Analysis of Pull System, a Method of Multi-Stage Production Control.” International Journal of Production Research 19 (3): 241–253.10.1080/00207548108956651
  • Kotani, S. 2007. “Optimal Method for Changing the Number of Kanbans in the E -Kanban System and Its Applications.” International Journal of Production Research 45 (24): 5789–5809.10.1080/00207540601096940
  • Lage Junior, M. , and M. Godinho Filho . 2010. “Variations of the Kanban System: Literature Review and Classification.” International Journal of Production Research 125: 13–21.10.1016/j.ijpe.2010.01.009
  • Land, M. J. 2009. “Cobacabana (Control of Balance by Card-Based Navigation): A Card-Based System for Job Shop Control.” International Journal of Production Economics 117: 97–103.10.1016/j.ijpe.2008.08.057
  • Land, M. J. , and G. J. C. Gaalman . 1996. “Workload Control Concepts in Job Shops: A Critical Assessment.” International Journal of Production Economics 46–47: 535–538.10.1016/S0925-5273(96)00088-6
  • Land, M.J. , M. Stevenson , M. Thürer, G. J. C. Gaalman . 2015. “Job Shop Control: In Search of the Key to Delivery Improvements.” International Journal of Production Economics, 168: 257–266.
  • Liberopoulos, G. , and Y. Dallery . 2000. “A Unified Framework for Pull Control Mechanisms in Multi-Stage Manufacturing Systems.” Annals of Operations Research 93: 325–355.10.1023/A:1018980024795
  • Lolli, F. , R. Gamberini , C. Giberti , B. Rimini , and F. Bondi . 2016. “A Simulative Approach for Evaluating Alternative Feeding Scenarios in a Kanban System.” International Journal of Production Research 54 (14): 4228–4239.10.1080/00207543.2015.1117675
  • Monden, Y. 1983. Toyota Production System: Practical Approach to Production Management. Norcross: Industrial Engineering and Management Press.
  • Ohno, T. 1988. Toyota Production System: Beyond Large-Scale Production. 1st ed. Cambridge, MA: Productivity Press.
  • Olhager, J. 2003. “Strategic Positioning of the Order Penetration Point.” International Journal of Production Economics 85: 319–329.10.1016/S0925-5273(03)00119-1
  • Renna, P. , L. Magrino , and R. Zaffina . 2013. “Dynamic Card Control Strategy in Pull Manufacturing Systems.” International Journal of Computer Integrated Manufacturing 26 (9): 881–894.10.1080/0951192X.2013.799783
  • Shingo, S. 1989. A Study of the Toyota Production System from an Industrial Engineering Viewpoint. Cambridge, MA: Productivity Press.
  • Spearman, M. L. , D. L. Woodruff , and W. J. Hopp . 1990. “CONWIP: A Pull Alternative to Kanban.” International Journal of Production Research 28 (5): 879–894.10.1080/00207549008942761
  • Sugimori, Y. , K. Kusunoki , F. Cho , and S. Uchikawa . 1977. “Toyota Production System and Kanban System Materialization of Just-in-Time and Respect-for-Human System.” International Journal of Production Research 15 (6): 553–564.10.1080/00207547708943149
  • Takahashi, K. 2003. “Comparing Reactive Kanban Systems.” International Journal of Production Research 41 (18): 4317–4337.10.1080/0020754031000152569
  • Takahashi, K. , and N. Nakamura . 1999. “Reacting JIT Ordering Systems to the Unstable Changes in Demand.” International Journal of Production Research 37 (10): 2293–2313.10.1080/002075499190770
  • Tardif, V. , and L. Maaseidvaag . 2001. “An Adaptive Approach to Controlling Kanban Systems.” European Journal of Operational Research 132 (2): 411–424.10.1016/S0377-2217(00)00119-3
  • Thürer, M. , M. Stevenson , and C. Silva . 2011. “Three Decades of Workload Control Research: A Systematic Review of the Literature.” International Journal of Production Research 49 (23): 6905–6935.10.1080/00207543.2010.519000
  • Thürer, M. , M. J. Land , and M. Stevenson . 2014. “Card-Based Workload Control for Job Shops: Improving COBACABANA.” International Journal of Production Economics 147: 180–188.10.1016/j.ijpe.2013.09.015
  • Thürer, M. , M. Stevenson , and C. W. Protzman . 2015a. “COBACABANA (Control of Balance by Card Based Navigation): an Alternative to Kanban in the Pure Flow Shop?” International Journal of Production Economics 166: 143–151.10.1016/j.ijpe.2015.05.010
  • Thürer, M. , M. J. Land , M. Stevenson , L. D. Fredendall , and M. Godinho Filho . 2015b. “Concerning Workload Control and Order Release: The Pre-Shop Pool Sequencing Decision.” Production & Operations Management 24 (7): 1179–1192.10.1111/poms.12304
  • Thürer, M. , M. Stevenson , and C. W. Protzman . 2016. “Card-Based Production Control: A Review of the Control Mechanisms Underpinning Kanban, ConWIP, POLCA and COBACABANA Systems.” Production Planning & Control . (in print).
  • Trietsch, D. , L. Mazmanyan , L. Gevorgyan , and K. R. Baker . 2012. “Modeling Activity times by the Parkinson Distribution with a Lognormal Core: Theory and Validation.” European Journal of Operational Research 216 (2): 386–396.10.1016/j.ejor.2011.07.054
  • Xanthopoulos, A. S. , D. E. Koulouriotis , and A. Gasteratos . 2017. “Adaptive Card-Based Production Control Policies.” Computers & Industrial Engineering 103: 131–144.10.1016/j.cie.2016.11.019

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.