Exact algorithms for the feedback length minimisation problem

, , ORCID Icon &
Pages 544-559 | Received 20 Jul 2017, Accepted 07 Mar 2018, Published online: 24 Apr 2018

References

  • Abdelsalam, H. M. , and H. P. Bao . 2007. “Re-Sequencing of Design Processes with Activity Stochastic Time and Cost: An Optimization-Simulation Approach.” Journal of Mechanical Design 129 (2): 150–157.10.1115/1.2216730
  • Ahmadi, R. , T. A. Roemer , and R. H. Wang . 2001. “Structuring Product Development Processes.” European Journal of Operational Research 130 (3): 539–558.10.1016/S0377-2217(99)00412-9
  • Browning, T. R. 2001. “Applying the Design Structure Matrix to System Decomposition and Integration Problems: A Review and New Directions.” IEEE Transactions on Engineering Management 48 (3): 292–306.10.1109/17.946528
  • Browning, T. R. , and S. D. Eppinger . 2002. “Modeling Impacts of Process Architecture on Cost and Schedule Risk in Product Development.” IEEE Transactions on Engineering Management 49 (4): 428–442.10.1109/TEM.2002.806709
  • Browning, T. R. , and A. A. Yassine . 2010. “A Random Generator of Resource-Constrained Multi-Project Network Problems.” Journal of Scheduling 13 (2): 143–161.10.1007/s10951-009-0131-y
  • Chen, C. H. , L. P. Khoo , and L. Jiao . 2004. “Information Deduction Approach through Quality Function Deployment for the Quantification of the Dependency between Design Tasks.” International Journal of Production Research 42 (21): 4623–4637.10.1080/00207540410001721727
  • Clark, A. , M. Mahdieh , and S. Rangel . 2014. “Production Lot Sizing and Scheduling with Non-Triangular Sequence-Dependent Setup times.” International Journal of Production Research 52 (8): 2490–2503.10.1080/00207543.2014.885662
  • Eppinger, S. D. , and T. R. Browning . 2012. Design Structure Matrix Methods and Applications. Cambridge, MA: The MIT Press.
  • Eppinger, S. D. , D. E. Whitney , R. P. Smith , and D. A. Gebala . 1994. “A Model-Based Method for Organizing Tasks in Product Development.” Research in Engineering Design 6 (1): 1–13.10.1007/BF01588087
  • Fang, E. , J. Lee , and Z. Yang . 2015. “ The Timing of Codevelopment Alliances in New Product Development Processes: Returns for Upstream and Downstream Partners.” Journal of Marketing  79 (1): 64–82.
  • Fox, E. A. , Q. F. Chen , and L. S. Heath . 1992. “ A Faster Algorithm for Constructing Minimal Perfect Hash Functions.” Proceedings of the 15th Annual International ACM SIGIR Conference on Research and Development in Information Retrieval (pp. 266–273), Copenhagen, Denmark.
  • Gebala, D. A. , and S. D. Eppinger . 1991. “Methods for Analyzing Design Procedures.” Proceedings of ASME 3rd International Conference on Design Theory Methodology: 227–233.
  • Hatami, S. , R. Ruiz , and C. Andrés-Romano . 2013. “The Distributed Assembly Permutation Flowshop Scheduling Problem.” International Journal of Production Research 51 (17): 5292–5308.10.1080/00207543.2013.807955
  • Krishnan, V. , and K. T. Ulrich . 2001. “Product Development Decisions: A Review of the Literature.” Management Science 47 (1): 1–21.10.1287/mnsc.47.1.1.10668
  • Kusiak, A. , and J. Wang . 1993. “Efficient Organizing of Design Activities.” The International Journal of Production Research 31 (4): 753–769.10.1080/00207549308956755
  • Lancaster, J. , and K. Cheng . 2008. “A Fitness Differential Adaptive Parameter Controlled Evolutionary Algorithm with Application to the Design Structure Matrix.” International Journal of Production Research 46 (18): 5043–5057.10.1080/00207540701324176
  • Leskovec, J. , A. Rajaraman , and J. D. Ullman . 2014. Mining of Massive Datasets. Cambridge, MA: Cambridge University Press.
  • Lin, J. , Y. Qian , A. A. Yassine , and W. Cui . 2012. “A Fuzzy Approach for Sequencing Interrelated Activities in a DSM.” International Journal of Production Research 50 (23): 7012–7025.10.1080/00207543.2011.648779
  • Lin, J. , Y. Qian , W. Cui , and T. N. Goh . 2015. “An Effective Approach for Scheduling Coupled Activities in Development Projects.” European Journal of Operational Research 243 (1): 97–108.10.1016/j.ejor.2014.11.019
  • Meier, C. , A. A. Yassine , and T. R. Browning . 2007. “Design Process Sequencing with Competent Genetic Algorithms.” Journal of Mechanical Design 129 (6): 566–585.10.1115/1.2717224
  • Nasr, W. , A. A. Yassine , and O. A. Kasm . 2016. “An Analytical Approach to Estimate the Expected Duration and Variance for Iterative Product Development Projects.” Research in Engineering Design 27 (1): 55–71.10.1007/s00163-015-0205-0
  • Qian, Y. , and J. Lin . 2014. “Organizing Interrelated Activities in Complex Product Development.” IEEE Transactions on Engineering Management 61 (2): 298–309.10.1109/TEM.2013.2285738
  • Qian, Y. , M. Xie , T. N. Goh , and J. Lin . 2010. “Optimal Testing Strategies in Overlapped Design Process.” European Journal of Operational Research 206 (1): 131–143.10.1016/j.ejor.2010.02.010
  • Sawik, T. 2013. “Integrated Selection of Suppliers and Scheduling of Customer Orders in the Presence of Supply Chain Disruption Risks.” International Journal of Production Research 51 (23–24): 7006–7022.10.1080/00207543.2013.852702
  • Shaja, A. , and K. Sudhakar . 2010. “Optimized Sequencing of Analysis Components in Multidisciplinary Systems.” Research in Engineering Design 21 (3): 173–187.10.1007/s00163-009-0082-5
  • Shobaki, G. , and J. Jamal . 2015. “An Exact Algorithm for the Sequential Ordering Problem and Its Application to Switching Energy Minimization in Compilers.” Computational Optimization and Applications 61 (2): 343–372.10.1007/s10589-015-9725-9
  • Smith, R. P. , and S. D. Eppinger . 1997. “A Predictive Model of Sequential Iteration in Engineering Design.” Management Science 43 (8): 1104–1120.10.1287/mnsc.43.8.1104
  • Steward, D. V. 1981. “The Design Structure System: A Method for Managing the Design of Complex Systems.” IEEE Transactions on Engineering Management 3: 71–74.10.1109/TEM.1981.6448589
  • Yang, Q. , T. Yao , T. Lu , and B. Zhang . 2014. “An Overlapping-Based Design Structure Matrix for Measuring Interaction Strength and Clustering Analysis in Product Development Project.” IEEE Transactions on Engineering Management 61 (1): 159–170.10.1109/TEM.2013.2267779
  • Qian, Y. , J. Lin , T. N. Goh , and M. Xie . 2011. “A Novel Approach to DSM-Based Activity Sequencing Problem.” IEEE Transactions on Engineering Management 58 (4): 688–705.10.1109/TEM.2011.2107558
  • Yassine, A. A. , R. H. Chidiac , and I. H. Osman . 2013. “Simultaneous Optimisation of Products, Processes, and People in Development Projects.” Journal of Engineering Design 24 (4): 272–292.10.1080/09544828.2012.727206
  • Zhang, J. , X. Song , H. Chen , and R. Shi . 2015. “Optimisation of Critical Chain Sequencing Based on Activities’ Information Flow Interactions.” International Journal of Production Research 53 (20): 6231–6241.10.1080/00207543.2015.1043157

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.