2,095
Views
34
CrossRef citations to date
0
Altmetric
Reviews

A review on optimisation of part quality inspection planning in a multi-stage manufacturing system

ORCID Icon, ORCID Icon, ORCID Icon, ORCID Icon & ORCID Icon
Pages 4880-4897 | Received 03 Oct 2017, Accepted 05 Apr 2018, Published online: 25 Apr 2018

References

  • Avinadav, T. , and T. Raz . 2003. “Economic Optimization in a Fixed Sequence of Unreliable Inspections.” Journal of the Operational Research Society 54 (6): 605–613.10.1057/palgrave.jors.2601543
  • Azadeh, A. , and M. S. Sangari . 2010. “A Metaheuristic Method for Optimising Inspection Strategies in Serial Multistage Processes.” International Journal of Productivity and Quality Management 6 (3): 289–303.10.1504/IJPQM.2010.035117
  • Azadeh, A. , M. S. Sangari , and A. S. Amiri . 2012. “A Particle Swarm Algorithm for Inspection Optimization in Serial Multi-stage Processes.” Applied Mathematical Modelling 36 (4): 1455–1464.10.1016/j.apm.2011.09.037
  • Azadeh, A. , M. S. Sangari , E. Sangari , and S. Fatehi . 2015. “A Particle Swarm Algorithm for Optimising Inspection Policies in Serial Multistage Production Processes with Uncertain Inspection Costs.” International Journal of Computer Integrated Manufacturing 28 (7): 766–780.10.1080/0951192X.2014.900873
  • Azadeh, A. , M. Rezaei-Malek , F. Evazabadian , and M. Sheikhalishahi . 2015. “Improved Design of CMS by Considering Operators Decision-making Styles.” International Journal of Production Research 53 (11): 3276–3287.10.1080/00207543.2014.975860
  • Azadeh, A. , M. Ravanbakhsh , M. Rezaei-Malek , M. Sheikhalishahi , and A. Taheri-Moghaddam . 2017. “Unique NSGA-II and MOPSO Algorithms for Improved Dynamic Cellular Manufacturing Systems Considering Human Factors.” Applied Mathematical Modelling 48: 655–672.10.1016/j.apm.2017.02.026
  • Bai, D. , and H. Yun . 1996. “Optimal Allocation of Inspection Effort in a Serial Multi-stage Production System.” Computers & Industrial Engineering 30 (3): 387–396.10.1016/0360-8352(96)00008-3
  • Ballou, D. P. , and H. L. Pazer . 1982. “The Impact of Inspector Fallibility on the Inspection Policy in Serial Production Systems.” Management Science 28 (4): 387–399.10.1287/mnsc.28.4.387
  • Ballou, D. P. , and H. L. Pazer . 1985. “Process Improvement versus Enhanced Inspection in Optimized Systems.” International Journal of Production Research 23 (6): 1233–1245.10.1080/00207548508904778
  • Barad, M. 1990. “A Break-even Quality Level Approach to Location of Inspection Stations in a Multi-stage Production Process.” International Journal of Production Research 28 (1): 29–45.10.1080/00207549008942682
  • Beightler, C. S. , and L. G. Mitten . 1964. “Design of an Optimal Sequence of Interrelated Sampling Plans.” Journal of the American Statistical Association 59 (305): 96–104.10.1080/01621459.1964.10480703
  • Ben-Daya, M. , and S. O. Duffuaa . 1995. “Maintenance and Quality: The Missing Link.” Journal of Quality in Maintenance Engineering 1 (1): 20–26.10.1108/13552519510083110
  • Ben-Daya, M. , and M. Rahim . 2001. “Integrated Production, Quality and Maintenance Models, an Overview.” In Integrated Models in Production Planning, Inventory, Quality and Maintenance , edited by M. Rahim and M. Ben-Daya , 3–28. New York : Kluwer Academic.10.1007/978-1-4615-1635-4
  • Britney, R. R. 1972. “Optimal Screening Plans for Nonserial Production Systems.” Management Science 18 (9): 550–559.10.1287/mnsc.18.9.550
  • Brown, E. D. 1968. Some Mathematical Models of Inspection along a Production Line (No. TR-36). Massachusetts Inst of Tech Cambridge Operations Research Center.
  • Chakravarty, A. K. , and A. Shtub . 1987. “Strategic Allocation of Inspection Effort in a Serial, Multi-product Production System.” IIE Transactions 19 (1): 13–22.10.1080/07408178708975364
  • Chen, T. J. , and A. C. Thornton . 1999. Quantitative Selection of Inspection Plans. Proceedings of the 1999 ASME Design Engineering Technical Conferences . New York : American Society of Mechanical Engineers.
  • Chen, J. , D. D. Yao , and S. Zheng . 1998. “Quality Control for Products Supplied with Warranty.” Operations Research 46 (1): 107–115.10.1287/opre.46.1.107
  • Chevalier, P. B. , and L. W. Wein . 1997. “Inspection for Circuit Board Assembly.” Management Science 43 (9): 1198–1213.10.1287/mnsc.43.9.1198
  • Colledani, M. , T. Tolio , A. Fischer , B. Iung , G. Lanza , R. Schmitt , and J. Váncza . 2014. “Design and Management of Manufacturing Systems for Production Quality.” CIRP Annals 63 (2): 773–796.10.1016/j.cirp.2014.05.002
  • Deliman, N. C. , and R. M. Feldman . 1996. “Optimization of Process Improvement and Inspection Location for Serial Manufacturing.” International Journal of Production Research 34 (2): 395–405.10.1080/00207549608904910
  • Dietrich, D. L. , and J. L. Sanders . 1974. “A Bayesian Quality Assurance Model for a Multi-stage Production Process.” ASQC Technical Conference Transactions , 338–348. Milwaukee, WI : American Society for Quality Control.
  • Emmons, H. , and G. Rabinowitz . 2002. “Inspection Allocation for Multi-stage Deteriorating Production Systems.” IIE Transactions 34 (12): 1031–1041.
  • Enrick, N. L. 1975. “Towards Optimization of Inspection Allocation Part I and II.” Industrial Management 17 (3): 7–11.
  • Eppen, G. D. , and E. G. Hurst Jr . 1974. “Optimal Location of Inspection Stations in a Multistage Production Process.” Management Science 20 (8): 1194–1200.10.1287/mnsc.20.8.1194
  • Ercan, S. S. 1972. “Systems Approach to the Multistage Manufacturing Connected-unit Situation.” Naval Research Logistics Quarterly 19 (3): 493–500.10.1002/(ISSN)1931-9193
  • Ercan, S. S. , M. Z. Hassan , and A. Taulananda . 1974. “Cost Minimizing Single Sampling Plans with AIQL and AOQL Constraints.” Management Science 20 (7): 1112–1121.10.1287/mnsc.20.7.1112
  • Feng, Q. , and K. C. Kapur . 2006. “Economic Design of Specifications for 100% Inspection with Imperfect Measurement Systems.” Quality Technology & Quantitative Management 3 (2): 127–144.10.1080/16843703.2006.11673105
  • Ferreira, R. J. P. , A. T. de Almeida , and C. Cavalcante . 2009. “A Multi-criteria Decision Model to Determine Inspection Intervals of Condition Monitoring Based on Delay Time Analysis.” Reliability Engineering and System Safety 94: 905–912.10.1016/j.ress.2008.10.001
  • Foster, J. W. , C. O. Malave , and J. R. Villalobos . 1990. “Flexible Inspection within an Aggregated Information Environment.” Computers & Industrial Engineering 19 (1-4): 224–228.10.1016/0360-8352(90)90110-8
  • Garcia-diaz, A. , J. W. Foster , and M. Bonyuet . 1984. “Dynamic Programming Analysis of Special Multi-stage Inspection Systems.” IIE Transactions 16 (2): 115–126.10.1080/07408178408974676
  • Garey, M. R. 1972. “Optimal Test Point Selection for Sequential Manufacturing Processes.” Bell System Technical Journal 51 (1): 291–300.10.1002/bltj.1972.51.issue-1
  • Gunter, S. I. , and L. A. Swanson . 1985. “Inspector Location in Convergent Production Lines.” International Journal of Production Research 23 (6): 1153–1169.10.1080/00207548508904773
  • Gurnani, H. , Z. Drezner , and R. Akella . 1996. “Capacity Planning under Different Inspection Strategies.” European Journal of Operational Research 89 (2): 302–312.10.1016/0377-2217(94)00276-2
  • Hanne, T. , and S. Nickel . 2005. “A Multiobjective Evolutionary Algorithm for Scheduling and Inspection Planning in Software Development Projects.” European Journal of Operational Research 167: 663–678.10.1016/j.ejor.2004.07.014
  • Hassan, A. , and D. T. Pham . 2000. “Optimisation of Inspection Stations by Using Simulated Annealing.” International Journal for Manufacturing Science and Technology 2: 59–65.
  • Hsu, J. I. S. 1984. “A Hybrid Inspection System for the Multistage Production Process.” International Journal of Production Research 22 (1): 63–70.10.1080/00207548408942430
  • Hurst, E. G. 1973. “Imperfect Inspection in a Multistage Production Process.” Management Science 20 (3): 378–384.
  • Jewkes, E. M. 1995. “Optimal Inspection Effort and Scheduling for a Manufacturing Process with Repair.” European Journal of Operational Research 85: 340–351.10.1016/0377-2217(94)00046-F
  • Kakade, V. , J. F. Valenzuela , and J. S. Smith . 2004. “An Optimization Model for Selective Inspection in Serial Manufacturing Systems.” International Journal of Production Research 42 (18): 3891–3909.10.1080/00207540410001704014
  • Kang, K. , K. A. Ebeling , and S. La . 1990. “The Optimal Location of Inspection Stations Using a Rule-based Methodology.” Computers & Industrial Engineering 19 (1-4): 272–275.10.1016/0360-8352(90)90120-B
  • Korytkowski, P. 2011. “A Genetic Algorithm with Tournament Selection for Optimising Inspection Allocation in Multiproduct Multistage Production Systems.” International Journal of Simulation and Process Modelling 6 (3): 238–244.10.1504/IJSPM.2011.044772
  • Lee, H. L. , and M. J. Rosenblatt . 1987. “Simultaneous Determination of Production Cycle and Inspection Schedules in a Production System.” Management Science 33: 1125–1136.10.1287/mnsc.33.9.1125
  • Lee, J. , and S. Unnikrishnan . 1998. “Planning Quality Inspection Operations in Multistage Manufacturing Systems with Inspection Errors.” International Journal of Production Research 36 (1): 141–156.10.1080/002075498193976
  • Lindsay, G. F. , and A. B. Bishop . 1964. “Allocation of Screening Inspection Effort – Dynamic Programming Approach.” Management Science 10 (2): 343–352.
  • Mandroli, S. S. , A. K. Shrivastava , and Y. Ding . 2006. “A Survey of Inspection Strategy and Sensor Distribution Studies in Discrete-part Manufacturing Processes.” IIE Transactions 38 (4): 309–328.10.1080/07408170500327352
  • Mirdamadi, S. 2014. “Système d’aide à la décision pour la génération des processus d’inspection par la fédération des expertises métier [Decision Support System for the Generation of Inspection Processes by the Federation of Business Expertises].” Doctoral dissertation, Institut d’Optique Graduate School.
  • Mohammadi, M. 2015. “A Multi-objective Optimization Framework for an Inspection Planning Problem under Uncertainty and Breakdown.” Mechanical Engineering [physics.class-ph]. Ecolenationale supérieure d’arts et métiers – ENSAM. NNT: 2015ENAM0055.
  • Mohammadi, M. , A. Siadat , J. Y. Dantan , and R. Tavakkoli-Moghaddam . 2015. “Mathematical Modelling of a Robust Inspection Process Plan: Taguchi and Monte Carlo Methods.” International Journal of Production Research 53 (7): 2202–2224.10.1080/00207543.2014.980460
  • Mohammadi, M. , J. Y. Dantan , A. Siadat , and R. Tavakkoli-Moghaddam . 2017. “A Bi-objective Robust Inspection Planning Model in a Multi-stage Serial Production System.” International Journal of Production Research . doi:10.1080/00207543.2017.1363425.
  • Montgomery, D. C. 2009. Introduction to Statistical Quality Control . New York : John Wiley.
  • Mousavi, S. M. , S. Mirdamadi , A. Siadat , J. Dantan , and R. Tavakkoli-Moghaddam . 2015. “An Intuitionistic Fuzzy Grey Model for Selection Problems with an Application to the Inspection Planning in Manufacturing Firms.” Engineering Applications of Artificial Intelligence 39: 157–167.10.1016/j.engappai.2014.12.004
  • Narahari, Y. , and L. M. Khan . 1996. “Modeling Reentrant Manufacturing Systems with Inspection Stations.” Journal of Manufacturing Systems 15 (6): 367–378.10.1016/S0278-6125(97)83051-8
  • Oppermann, M. , W. Sauer , H. Wohlrabe , and T. Zerna . 2003. “New Quality Cost Models to Optimize Inspection Strategies.” IEEE Transactions on Electronics Packaging Manufacturing 26 (4): 328–337.10.1109/TEPM.2003.822066
  • Penn, M. , and T. Raviv . 2007. “Optimizing the Quality Control Station Configuration.” Naval Research Logistics 54 (3): 301–314.10.1002/(ISSN)1520-6750
  • Penn, M. , and T. Raviv . 2008. “A Polynomial Time Algorithm for Solving a Quality Control Station Configuration Problem.” Discrete Applied Mathematics 156 (4): 412–419.10.1016/j.dam.2007.08.005
  • Peters, M. H. , and W. W. Williams . 1984. “Location of Quality Inspection Stations: An Experimental Assessment of Five Normative Heuristics.” Decision Sciences 15 (3): 389–408.10.1111/deci.1984.15.issue-3
  • Peters, M. H. , and W. W. Williams . 1987. “Economic Design of Quality Monitoring Efforts for Multi-stage Production Systems.” IIE Transactions 19 (1): 81–87.10.1080/07408178708975373
  • Pruzan, P. M. , and J. R. Jackson . 1967. “A Dynamic Programming Application in Production Line Inspection.” Technometrics 9 (1): 73–81.10.1080/00401706.1967.10490442
  • Rabinowitz, G. , and H. Emmons . 1997. “Optimal and Heuristic Inspection Schedules for Multi-stage Production Systems.” IIE Transactions 29 (12): 1063–1071.
  • Rau, H. , and K. H. Cho . 2009. “Genetic Algorithm Modeling for the Inspection Allocation in Reentrant Production Systems.” Expert Systems with Applications 36 (8): 11287–11295.10.1016/j.eswa.2009.03.020
  • Rau, H. , and K. H. Cho . 2011. “Particle Swarm Optimization with Mutation for the Inspection Allocation in Reentrant Production Systems.” Proceedings of the International Conference on Machine Learning and Cybernetics (ICMLC) , Vol. 3, 1025–1030. Guilin, July 10–13.
  • Rau, H. , and Y. H. Chu . 2005. “Inspection Allocation Planning with Two Types of Workstation: WVD and WAD.” The International Journal of Advanced Manufacturing Technology 25: 947–953.10.1007/s00170-004-2298-x
  • Raz, T. 1986. “ A Survey of Models for Allocating Inspection Effort in Multistage Production Systems.” Journal of Quality Technology . 18 (4) : 239– 247.
  • Raz, T. , and M. Kaspi . 1991. “Location and Sequencing of Imperfect Inspection Operations in Serial Multi-stage Production Systems.” International Journal of Production Research 29 (8): 1645–1659.10.1080/00207549108948037
  • Rebello, R. , A. Agnetis , and P. B. Mirchandani . 1995. “Specialized Inspection Problems in Serial Production Systems.” European Journal of Operational Research 80: 277–296.10.1016/0377-2217(94)00171-8
  • Rezaei-Malek, M. , R. Tavakkoli-Moghaddam , A. Siadat , and J.-Y. Dantan . 2017. Integrated Preventive Maintenance and Inspection Planning in a Deteriorating Serial Multi-stage Manufacturing System. Proceedings of the 7th IESM Conference , Vol. 2, 352–357. Saarbrücken, October 11–13.
  • Rezaei-Malek, M. , J. Razmi , R. Tavakkoli-Moghaddam , and A. Taheri-Moghaddam . 2017. “Towards a Psychologically Consistent Cellular Manufacturing System.” International Journal of Production Research 55 (2): 492–518.10.1080/00207543.2016.1192299
  • Rezaei-Malek, M. , R. Tavakkoli-Moghaddam , A. Siadat , and J.-Y. Dantan . 2018. “A Novel Model for the Integrated Planning of Part Quality Inspection and Preventive Maintenance in a Linear-deteriorating Serial Multi-stage Manufacturing System.” The International Journal of Advanced Manufacturing Technology . doi:10.1007/s00170-018-1751-1.
  • Saxena, S. , C. M. Chang , H. B. Chow , and J. Lee . 1990. “Evaluation of Heuristics for Inspection Station Allocation in Serial Production Systems.” Proceedings of the 22nd Conference on Winter Simulation , 919–922. New Orleans, LA , December 9–12.
  • Shetwan, A. G. , V. I. Vitanov , and B. Tjahjono . 2011. “Allocation of Quality Control Stations in Multistage Manufacturing Systems.” Computers & Industrial Engineering 60 (4): 473–484.10.1016/j.cie.2010.12.022
  • Shiau, Y. R. 2002. “Inspection Resource Assignment in a Multistage Manufacturing System with an Inspection Error Model.” International Journal of Production Research 40 (8): 1787–1806.10.1080/00207540110119982
  • Shiau, Y. R. 2003a. “Inspection Allocation Planning for a Multiple Quality Characteristic Advanced Manufacturing System.” The International Journal of Advanced Manufacturing Technology 21 (7): 494–500.10.1007/s001700300058
  • Shiau, Y. R. 2003b. “Quick Decision-making Support for Inspection Allocation Planning with Rapidly Changing Customer Requirements.” The International Journal of Advanced Manufacturing Technology 22 (9–10): 633–640.10.1007/s00170-002-1521-x
  • Shiau, Y. R. , M. H. Lin , and W. C. Chuang . 2007. “Concurrent Process/Inspection Planning for a Customized Manufacturing System Based on Genetic Algorithm.” The International Journal of Advanced Manufacturing Technology 33 (7–8): 746–755.10.1007/s00170-006-0486-6
  • Shin, W. S. , S. M. Hart , and H. F. Lee . 1995. “Strategic Allocation of Inspection Stations for a Flow Assembly Line: A Hybrid Procedure.” IIE Transactions 27 (6): 707–715.10.1080/07408179508936787
  • Taneja, M. , S. M. Sharma , and N. Viswanadham . 1994. “Location of Quality-control Stations in Manufacturing Systems: A Simulated Annealing Approach.” Systems Practice 7 (4): 367–380.10.1007/BF02169359
  • Tang, C. S. 1991. “Designing an Optimal Production System with Inspection.” European Journal of Operational Research 52 (1): 45–54.10.1016/0377-2217(91)90334-R
  • Tayi, G. K. , and D. P. Ballou . 1988. “An Integrated Production-inventory Model with Reprocessing and Inspection.” International Journal of Production Research 26 (8): 1299–1315.10.1080/00207548808947947
  • Trippi, R. R. 1974. “An On-line Computational Model for Inspection Resource Allocation.” Journal of Quality Technology 6: 167–174.10.1080/00224065.1974.11980642
  • Trippi, R. R. 1975. “The Warehouse Location Formulation as a Special Type of Inspection Problem.” Management Science 21 (9): 986–988.10.1287/mnsc.21.9.986
  • Vaghefi, A. , and V. Sarhangian . 2009. “Contribution of Simulation to the Optimization of Inspection Plans for Multi-stage Manufacturing Systems.” Computers & Industrial Engineering 57 (4): 1226–1234.10.1016/j.cie.2009.06.001
  • Valenzuela, J. F. , J. S. Smith , and J. L. Evans . 2004. “Allocating Solder-paste Printing Inspection in High Volume Electronics Manufacturing.” IIE Transactions 36 (12): 1171–1181.10.1080/07408170490507710
  • Van Volsem, S. , and H. Van Landeghem . 2003. “Optimizing Inspection Strategies for Multi-stage Processes: An Exploratory Modeling Framework and Simulation.” Qualité Et Sûreté De Fonctionnement 2–9.
  • Van Volsem, S. , W. Dullaert , and H. Van Landeghem . 2007. “An Evolutionary Algorithm and Discrete Event Simulation for Optimizing Inspection Strategies for Multi-stage Processes.” European Journal of Operational Research 179 (3): 621–633.10.1016/j.ejor.2005.03.054
  • Veatch, M. H. 2000. “Inspection Strategies for Multistage Production Systems with Time-varying Quality.” International Journal of Production Research 38 (4): 837–853.10.1080/002075400189185
  • Verduzco, A. , J. R. Villalobos , and B. Vega . 2001. “Information-based Inspection Allocation for Real-time Inspection Systems.” Journal of Manufacturing Systems 20 (1): 13–22.10.1016/S0278-6125(01)80016-9
  • Villalobos, J. R. , and J. W. Foster . 1991. “Some Results from a Model of Dynamic Inspection Allocation.” Computers & Industrial Engineering 21 (1–4): 355–358.10.1016/0360-8352(91)90116-N
  • Villalobos, J. R. , J. W. Foster , and R. L. Disney . 1993. “Flexible Inspection Systems for Serial Multi-stage Production Systems.” IIE Transactions 25 (3): 16–26.10.1080/07408179308964287
  • Viswandham, N., S. M. Sharma and M. Taneja . 1996.Inspection allocation in manufacturing systems using stochastic search techniques. IEEE Transactions on Systems, Man, and Cybernetics - Part A: Systems and Humans. 26 (2) : 222–230.
  • Volsem, S. 2010. “Joint Optimisation of All Inspection Parameters for Multistage Processes: Evolutionary Algorithm and Simulation.” International Journal of Innovative Computing and Applications 2 (3): 170–177.10.1504/IJICA.2010.033648
  • White, L. S. 1966. “The Analysis of a Simple Class of Multistage Inspection Plans.” Management Science 12 (9): 685–693.10.1287/mnsc.12.9.685
  • Winchell, W. 1996. Inspection and Measurement in Manufacturing: Keys to Process Planning and Improvement . Dearborn, MI: Society of Manufacturing Engineers.
  • Woo, W. K. , and J. E. Metcalfe . 1972. “Optimal Allocation of Inspection Effort in Multi-stage Manufacturing Processes.” Western Electric Engineer 16: 3–16.
  • Yao, D. D. , and S. Zheng . 1999a. “Sequential Inspection under Capacity Constraints.” Operations Research 47 (3): 410–421.10.1287/opre.47.3.410
  • Yao, D. D. , and S. Zheng . 1999b. “Coordinated Quality Control in a Two-stage System.” IEEE Transactions on Automatic Control 44 (6): 1166–1179.10.1109/9.769371
  • Yum, B. J. , and E. D. McDowell . 1981. “The Optimal Allocation of Inspection Effort in a Class of Nonserial Production Systems.” IIE Transactions 13 (4): 285–293.
  • Yum, B. J. , and E. D. McDowell . 1987. “Optimal Inspection Policies in a Serial Production System including Scrap Rework and Repair: An MILP Approach.” International Journal of Production Research 25 (10): 1451–1464.10.1080/00207548708919925
  • Zheng, S. 2000. “Dynamic Quality Control in Assembly Systems.” IIE Transactions 32 (9): 797–806.
  • Zhou, M. , and C. Zhao . 2002. “An Optimization Model and Multiple Matching Heuristics for Quality Planning in Manufacturing Systems.” Computers & Industrial Engineering 42 (1): 91–101.10.1016/S0360-8352(02)00005-0

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.