1,380
Views
63
CrossRef citations to date
0
Altmetric
Articles

Applying data mining technique to disassembly sequence planning: a method to assess effective disassembly time of industrial products

ORCID Icon, ORCID Icon, ORCID Icon & ORCID Icon
Pages 599-623 | Received 22 Jul 2017, Accepted 23 Apr 2018, Published online: 11 May 2018

References

  • Bae, J. K. , and K. Jinhwa . 2011. “Product Development with Data Mining Techniques: A Case on Design of Digital Camera.” In Expert Systems with Applications, 9274–9280 38 (8). Elsevier Ltd. doi:10.1016/j.eswa.2011.01.030.
  • Boothroyd, G. , P. Dewhurst , and W. A. Knight . 2010. Product Design for Manufacture and Assembly. 3rd ed. CRC Press.
  • Braha, D. 2001. “Data Mining for Design and Manufacturing.” In Massive Computing. Vol. 3, edited by Dan Braha . Boston, MA: Springer US. doi:10.1007/978-1-4757-4911-3.
  • Dewhurst, P. 1993. “Product Design for Manufacture: Design for Disassembly.” Industrial Engineering 25: 26–28.
  • Dong, T. , L. Zhang , R. Tong , and J. Dong . 2006. “A Hierarchical Approach to Disassembly Sequence Planning for Mechanical Product.” The International Journal of Advanced Manufacturing Technology 30 (5–6): 507–520. doi:10.1007/s00170-005-0036-7.
  • Favi, C. , M. Germani , M. Mandolini , and M. Marconi . 2012a. “Promoting and Managing end-of-life Closed-loop Scenarios of Products Using a Design for Disassembly Evaluation Tool.” Proceedings of the ASME Design Engineering Technical Conference: 1339–1348.
  • Favi, C. , M. Germani , M. Mandolini , and M. Marconi . 2012b. “LeanDfd: A Design for Disassembly Approach to Evaluate the Feasibility of Different End-of-life Scenarios for Industrial Products.” In Leveraging Technology for a Sustainable World, edited by D. A. Dornfeld and B. S. Linke , 215–220. doi:10.1007/978-3-642-29069-5_37.
  • Favi, C. , M. Germani , M. Mandolini , and M. Marconi . 2016. “Includes Knowledge of Dismantling Centers in the Early Design Phase: A Knowledge-based Design for Disassembly Approach.” Procedia CIRP 48: 401–406. doi:10.1016/j.procir.2016.03.242.
  • Fayyad, U. M. , G. Piatetsky-Shapiro , P. Smyth , and R. Uthurusamy . 1996. Advances in Knowledge Discovery and Data Mining. Cambridge, MA: AAAI Press/MIT Press.
  • Galantucci, L. M. , G. Percoco , and R. Spina . 2004. “Assembly and Disassembly Planning by using Fuzzy Logic & Genetic Algorithms.” International Journal of Advanced Robotic Systems 1 (2): 67–74. doi:10.5772/5622.
  • Giudice, F. , and G. Fargione . 2007. “Disassembly Planning of Mechanical Systems for Service and Recovery: A Genetic Algorithms Based Approach.” Journal of Intelligent Manufacturing 18: 313–329. doi:10.1007/s10845-007-0025-9.
  • Gungor, A. , and S. M. Gupta . 1998. “Disassembly Sequence Planning for Products With Defective Parts in Product Recovery.” Computers & Industrial Engineering 35 (1–2): 161–164. doi:10.1016/S0360-8352(98)00047-3.
  • Gungor, A. , and S. M. Gupta . 2001. “Disassembly Sequence Plan Generation Using a Branch-and-bound Algorithm.” International Journal of Production Research 39 (3): 481–509. doi:10.1080/00207540010002838.
  • Hui, W. , X. Dong , and D. Guanghong . 2008. “A Genetic Algorithm for Product Disassembly Sequence Planning.” Neurocomputing 71 (13–15): 2720–2726. doi:10.1016/j.neucom.2007.11.042.
  • Jeandin, T. , and C. Mascle . 2016. “A New Model to Select Fasteners in Design for Disassembly.” Procedia CIRP 40: 425–430. doi:10.1016/j.procir.2016.01.084.
  • Johnson, M. R. , and M. H. Wang . 1998. “Economical Evaluation of Disassembly Operations for Recycling, Remanufacturing and Reuse.” International Journal of Production Research 36 (12): 3227–3252. doi:10.1080/002075498192049.
  • Kang, C. M. , M. J. Kwak , N. W. Cho , and Y. S. Hong . 2010. “Automatic Derivation of Transition Matrix for End-of-life Decision Making.” International Journal of Production Research 48 (11): 3269–3298. doi:10.1080/00207540902729918.
  • Kara, S. , P. Pornprasitpol , and H. Kaebernick . 2005. “A Selective Disassembly Methodology for End-of-life Products.” Assembly Automation 25 (2): 124–134. doi:10.1108/01445150510590488.
  • Kheder, M. , M. Trigui , and N. Aifaoui . 2017. “Optimization of Disassembly Sequence Planning for Preventive Maintenance.” The International Journal of Advanced Manufacturing Technology 90: 1337–1349. doi:10.1007/s00170-016-9434-2.
  • Kondo, Y. , K. Deguchi , Y. Hayashi , and F. Obata . 2003. “Reversibility and Disassembly Time of Part Connection.” Resources, Conservation and Recycling 38: 175–184.10.1016/S0921-3449(02)00153-2
  • Kongar, E. , and S. M. Gupta . 2006. “Disassembly Sequencing Using Genetic Algorithm.” The International Journal of Advanced Manufacturing Technology 30: 497–506. doi:10.1007/s00170-005-0041-x.
  • Kretschmer, R. , A. Pfouga , S. Rulhoff , and J. Stjepandić . 2017. “Knowledge-based Design for Assembly in Agile Manufacturing by Using Data Mining Methods.” Advanced Engineering Informatics 33 (August): 285–299. doi:10.1016/j.aei.2016.12.006.
  • Kuo, T. C. 2013. “Waste Electronics and Electrical Equipment Disassembly and Recycling Using Petri Net Analysis: Considering the Economic Value and Environmental Impacts.” Computers & Industrial Engineering 65: 54–64. doi:10.1016/j.cie.2011.12.029.
  • Lambert, A. J. D. 2003. “Disassembly Sequencing: A Survey.” International Journal of Production Research 41 (16): 3721–3759. doi:10.1080/0020754031000120078.
  • Lambert, A. J. D. 2007. “Optimizing Disassembly Processes Subjected to Sequence-dependent Cost.” Computers & Operations Research 34 (2): 536–551. doi:10.1016/j.cor.2005.03.012.
  • Lambert, A. J. D. , and S. M. Gupta . 2008. “Methods for Optimum and Near Optimum Disassembly Sequencing.” International Journal of Production Research 46 (11): 2845–2865. doi:10.1080/00207540601120484.
  • Lambert, A. J. D. , and S. M. Gupta . 2016. Disassembly Modeling for Assembly, Maintenance, Reuse and Recycling. The St. Lucie press series on resource management. CRC Press.
  • Mandolini, M. , C. Favi , M. Germani , and M. Marconi . 2018. “Time-based Disassembly Method: How to Assess the Best Disassembly Sequence and Time of Target Components in Complex Products.” The International Journal of Advanced Manufacturing Technology 95 (1–4): 409–430. doi:10.1007/s00170-017-1201-5.
  • Mascle, C. , and B. A. Balasoiu . 2003. “Algorithmic Selection of a Disassembly Sequence of a Component by a Wave Propagation Method.” Robotics and Computer-integrated Manufacturing 19 (5): 439–448. doi:10.1016/S0736-5845(03)00032-2.
  • Mathieson, J. L. , B. A. Wallace , and J. D. Summers . 2013. “Assembly Time Modelling Through Connective Complexity Metrics.” International Journal of Computer Integrated Manufacturing 26 (10): 955–967. doi:10.1080/0951192X.2012.684706.
  • Matsumoto, T. , Y. Yahata , and K. Shida . 2009. “Design of a Method for Disassembly Works on Recycle Products.” Industrial Engineering and Manufacturing System 8 (1): 66–71.
  • Meng, K. , P. Lou , X. Peng , and V. Prybutok . 2016. “An Improved Co-evolutionary Algorithm for Green Manufacturing by Integration of Recovery Option Selection and Disassembly Planning for End-of-life Products.” International Journal of Production Research 54 (18): 5567–5593. doi:10.1080/00207543.2016.1176263.
  • Mitrouchev, P. , C. G. Wang , L. X. Lu , and G. Q. Li . 2015. “Selective Disassembly Sequence Generation Based on Lowest Level Disassembly Graph Method.” The International Journal of Advanced Manufacturing Technology 80: 141–159. doi:10.1007/s00170-015-6861-4.
  • Nettleton, D. 2014. Commercial Data Mining: Processing, Analysis and Modeling for Predictive Analytics Projects. Waltham: Morgan Kaufmann.
  • Ong, N. S. , and Y. C. Wong . 1999. “Automatic Subassembly Detection from a Product Model for Disassembly Sequence Generation.” The International Journal of Advanced Manufacturing Technology 15: 425–431. doi:10.1007/s001700050086.
  • Rai, R. , V. Rai , M. K. Tiwari , and V. Allada . 2012. “Disassembly Sequence Generation: A Petri Net Based Heuristic Approach.” International Journal of Production Research 40 (13): 3183–3198. doi:10.1080/00207540210146116.
  • Santochi, M. , G. Dini , and F. Failli . 2002. “Computer Aided Disassembly Planning: State of the Art and Perspectives.” CIRP Annals 51 (2): 507–529. doi:10.1016/S0007-8506(07)61698-9.
  • Srinivasan, H. , N. Shyamsundar , and R. Gadh . 1997. “A Framework for Virtual Disassembly Analysis.” Journal of Intelligent Manufacturing 8: 277–295. doi:10.1023/A:1018537611535.
  • Tang, Y. , M. C. Zhou , E. Zussman , and R. Caudill . 2002. “Disassembly Modeling, Planning, and Application.” Journal of Manufacturing Systems 21 (3): 200–217. doi:10.1016/S0278-6125(02)80162-5.
  • Tiwari, M. K. , N. Sinha , S. Kumar , R. Rai , and S. K. Mukhopadhyay . 2002. “A Petri Net Based Approach to Determine the Disassembly Strategy of a Product.” International Journal of Production Research 40 (5): 1113–1129. doi:10.1080/00207540110097176.
  • Tseng, Y. , H. Kaoa , and F. Huang . 2009. “Integrated Assembly and Disassembly Sequence Planning Using a GA Approach.” International Journal of Production Research 48 (20): 5991–6013. doi:10.1080/00207540903229173.
  • Wang, H. , Q. Peng , J. Zhang , and P. Gu . 2017. “Selective Disassembly Planning for the End-of-life Product.” Procedia CIRP 60: 512–517. doi:10.1016/j.procir.2017.02.003.
  • Yi, H. C. , Y. C. Park , and K. S. Lee . 2003. “A Study on the Method of Disassembly Time Evaluation of a Product Using Work Factor Method.” Systems, Man and Cybernetics IEEE International Conference: 1753–1759. doi: 10.1109/ICSMC.2003.1244665.
  • Yi, J. , B. Yu , L. Du , C. Li , and D. Hu . 2008. “Research on the Selectable Disassembly Strategy of Mechanical Parts Based on the Generalized CAD Model.” The International Journal of Advanced Manufacturing Technology 37: 599–604. doi:10.1007/s00170-007-0990-3.
  • Zhang, X. , and S. Y. Zhang . 2010. “Product Cooperative Disassembly Sequence Planning Based on Branch-and-bound Algorithm.” International Journal of Advanced Manufacturing Technology 19 (4):91–103. doi: 10.1007/s00170-010-2682-7.
  • Zhu, B. , and U. Roy . 2015. “Ontology-based Disassembly Information System for Enhancing Disassembly Planning and Design.” The International Journal of Advanced Manufacturing Technology 78 (9–12): 1595–1608. doi:10.1007/s00170-014-6704-8.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.